You are on page 1of 1

PROJECT STATUS

REPORT FORM

SITE INFORMATION
PROJECT NUMBER: DATE STARTED:
SITE ID: DATE FINISHED:
COMPANY NAME: NO. OF BOREHOLE:
PROJECT NAME:
CONTRACTOR:
OWNER/LESSOR: LATITUDE:
LOCATION: LONGITUDE:
CONTACT PERSON: CONTACT NUMBER:
TEAM LEADER: WHEATHER CONDITION:
TEAM MEMBERS:

Tm: 270.4 P(g) Shear Load(g) REPORTED BY:


M: 206.7 301 616 1578 FULL REPORT:
MMS: 384 762 1658 PRINT HARD COPY:
459 988 1684 DATE SENT:
501 1068 TRACKIN NO.:
543 1206 SENDER:
590 1352 SENT TO:
TEST RESULTS
Actual no. of SPT
Depth Type of Soil Water Table REMARKS
Blows (N)
0.50 meter
1.00 meter
1.50 meter
2.00 meter
2.50 meter
3.00 meter
3.50 meter
4.00 meter
4.50 meter
6.00 meter
8.00 meter
10.00 meter
12.00 meter
15.00 meter
REMARKS:

Prepared by: Checked by:

_______________________________ __ENGR. GABBY VILLEGAS___


Signature Over Printed Name Project Manager

You might also like