Date Time Task Description

Aug. 22 7:00 - 8:00pm Project approved, furthered my


(1 hour) research of the construction of the
garden
Aug. 23 1:00 - 2:00 pm Conducted a percolation test and
3:00 - 4:00 pm researched more about the
(2 hours) building process for rain gardens
Aug 24 11:00 - 12:00 Chose layout, measured garage
pm (1 hour) roof, calculates size of garde, and
spray painted the necessary size
Aug 25 4:00 - 5:00 pm Began digging up the layer of
6:30 - 7:30 pm grass
(2 hours)
Aug 27 1:00 - 2:00 pm Researched plants for garden
(1 hour)
Aug 29 2:00 - 3:00 pm Finished digging grass layer and
(1 hour) began on the rest of the dirt
Sept 5 10:45 - 11:45 Continued digging the hole at
pm 12:00 - 2: angle with the center being the
00 pm (3 deepest
hours)
Sept 6 4:00 - 5:15 pm Finished digging the hole,
(1.25 hours) amended the soil, returned a
layer of amended soil, and built a
berm
Sept 7 4:00 - 5:00 pm Planted the plants, added more
7:00 - 8:30 pm dirt around them, watered the
(2.50 hours) plants, and began moving excess
dirt to another location
Sep 8 - 19 15 mins/12 Watering the plants everyday
days (3 hours)
Sept 20 4:00 - 7:00 pm Finished dirt removal, added
(3 hours) mulch around the plants, and
watered the plants
TOTAL: 19.75 hrs