Project Log
Project Log
January 30th 2 hours of getting the table taken apart because half the screws got stuck in the
wood because of the old epoxy that was on the old table so I had to go in and cut them.
February 6th 4 of hours started measuring and cutting the board for the table top and also
Feburary 7th 1 of hour scrapped the paint stripper off the legs so I’am able to sand easier.
Feburary 14th 1 hour sanding the legs and burning the paint so it’s easier to sand off.
February 15th I sanded the table down and completing the first part of sanding.
February 19th I sanded the frame again and practiced making the holes for screwing in screws.
February 20th Burning the table top to get the burn look and staining the table frame.
Febraury 28th 2 hours of putting 1st coat of polyerthan on the table top and on the table frame.
March 2nd 2 hours of putting 2nd coat of polyerthan on the table top.
March 9th 2 hours of putting 3rd coat of polyerthan on the table top table and final coat on table
frame.
March 13th 2 hours of putting final coat of polyerthan on the table top.
March 15th 30min Put the table frame inside the house.
March 19th Bringing the table top into the house and assembling it to the frame.