You are on page 1of 6
~~ IndianOil WORK PROCEDURE FOR LIQUID PENETRATION TEST DOC.NNO:: SIPL-IHB-KGPL Gr.17-ML-P-13 REV: 00 NV SPUR INFRASTRUCUTRE PVT. LTD. Project: KANDLA GORAKHPUR LPG PIPELINE PROJECT (G-17) Client : M/s IHB Pvt. Ltd. PMC:M/s Indian Oil Corporatio Contractor : M/S Spur Infrast: in Ltd. ructure Pvt, Ltd. REV PREPARED BY SIPL CHECKED BY SIPL APPROVED BY 1HB/TOCL o | stoarure (ey ARPRONED SUBJECT TO CORRECTII = wane | [fs cord pate | 24 od [9097 DOCUMENT NO. REV. SH PROCEDURE FOR LIQUID PENETRATION TEST SIPLIHB-KGPUML-13, Tota WORK PROCEDURE FOR LIQUID PENETRATION TEST DOC.NO.: SIPL-IHB-KGPL Gr.17-ML-IP-13, REV: 00 TABLE OF CONTENTS 1.0 SCOPE 2.0 REFERANCE 3.0 METHOD 4.0 ITP / FORMATS a4 po ee au) SHI. PROCEDURE FOR LIQUID PENETRATION TEST DOCUMENT NO. SIPLIHB-KGPLML-1S Zot 4 LN a WORK PROCEDURE FOR A THB Gia LIQUID PENETRATION TEST 7 DOCNO:: SIPL-IHB-KGPL Gr.17-ML-JP-13, REV: 00 = IndianOil SCOPE To define a procedure for carrying out liquid penetration test on Pipe surfaces (after removal of Arc strike) affected, bevel edges witch are cut back etc. and as required REFERANCE 1. ASME Sec. V Article 6 2. API 1104 3. ASME Sec VIII, Div.-1, App 8 4. IOCL Spec. METHOD 1, Materials: Penetrant, Cleaner, & Developer shalll be used from the same manufacturer. Expiry date of Penetrant, Cleaner, & Developer shall be checked before use. 2. Surface Preparation: The surface to be tested and adjacent areas of at least 25 mm shall be cleaned with wire brush to remove rust, weld spatters, slag, paint etc. Temperature of the surface to be tested shall be 13 to 50°C. 3. After wire Brush cleaning, surface shall be cleaned with “CLEANER” by spray brushing gently with cotton cloth. Sufficient time shall be provided to ensure 100% evaporation of the cleaner before applying Penetrant. 4. °PENETRANT” shall be applied by spraying. The minimum Penetration time before applying developer (Dwell time) shall be as per manufacturer instruction and not less than 10 minutes. 5. After the dwell time, the excess Penetrant shall be removed from surface by Wiping off the clean cotton cloth and “CLEANER”. Cleaner shall not directly sprayed on the surface. 6. Immediately after cleaning “DEVELOPER” shall be sprayed on test area to obtain a thin coat. Before applying the developer it shall be thoroughly agitated to ensure adequate dispersion of suspected particlest d eyeloperr) Evaluation shall be done after 5 to 10 minutes after applying of developer and not later than 30 minutes after developer applied. 8. Chemical used for above shall not contain more than 25 ppm each of Harmful halogen & Sulphur. Final Cleaning: All the materials on the surface shall be removed by wiping with clean cloth or by spraying cleaner on the surface. DOCUMENT NO. REV. SHI, SIPCHE-KGPIMI-13_ 0 3ofd a . ¢ x WORK PROCEDURE FOR A LIQUID PENETRATION TEST DOC.NO: SIPL-IHB-KGPL Gr.17-ML-JP-13, REV: 00 “sins IndianOil 110. Acceptance standards as per ASME Sec VIII -DIV-1-APP 8 & API 1104 11. All the safety precautions for LPT material and personnel, shall be ensured. 12. The garbage should be removed from the area and kept to intake place. 13. Operator to be qualified to ASNT-SNT-TC level 1/11. ITP / FORMATS 1. Inspection and Test Plan : SIPL-INB-KGPL Gr.17-ML-JP-13, REV-00 2. Inspection Report : SIPL-IHB-KGPL Gr.17-ML-3P-13, REV-00, F-O1 mm Oe go DOCUMENT NO. REV. SHI. DURE FOR LIQUID PENETRATION TEST leone o oo mst ‘SIPLIHB-KGPLML-13 oO 4of4 ZN KANDLA GORAKHPUR LPG PIPELINE PROJECT (G-17) Indianoit (Client : M/s IMB Pvt. Le. Jesc: INDIAN OIL. CORPORATION LIMITED lcowrractor: / Spur Infrastructure Prt. Ltd, INSPECTION TEST PLAN FOR LIQUID PENETRANT TEST Doe, Wo.SIPLTHB-4 GPL Gr.A-MicdP-18 FIP-O1 INSPECTION FREQUENCY sno | activiry pescmirrion oa ocumsn 20 | ennaras ir nn/ioc rsa Qualtenon, aa y Sse 2 Mua check ot pipe mre w rat 3 [pesmi w : «Pena Aptian w mu —— SGA is Ti ¥ | Gr.17-ML-013-F-O1 6 [eso pene Remora © wo 8 [Developer Application w RW. 9 [own ¥ : “onyimpaion SK [10 [esis a ¥ ort [osname Tr res ctaning w : To [Removal otay vot enainer detect] W : 12) [bP tet ter oa ode ¥ ro Ta [bP on cu a ond eel ee w me 1a _fetaypreniton w me Tegan w= Whines MC -Random Wines Review L n sew : [wi APPROVED 7 . wh ane | Pints (erry yh o me | 4 bo] 2027 gre Prepared by SIPL (checked by SIPL 10Ft Me ul LN THB KANDLA GORAKHPUR LPG PIPELINE PROJECT (G-17) ( © va IndianOil Client : M/s THB Pet. Ltd. Ipc; INDIAN OIL, CORPORATION LIMITED CONTRACTOR: M/S Spur Infrastructure Pvt, Ltd. ‘Doc. No.SIPLAHB-KGPL Gr.17-ML-JP-13 IR-O1 INSPECTION REPORT FOR LIQUID PENETRANT TEST MATERIAL: fReport No. = ‘ Date ‘Observation/ ro 1e No. jeld No. sr. Ni Pip Weld ae REMARKS CHECKED & VERIFIED BY FOR 1HB/IOCL L rome , me fty qe co _ [ne Ba a ae ‘9q Yor] PO] Ieee eee Pp ore

You might also like