This document lists the required structural drawings needed for a design revision or building modification submission. It specifies that the latest approved drawings must be clouded in yellow and proposed drawings clouded in red. Drawings include general notes, typical details, foundation plans, floor plans, schedules, details, and any other structural drawings - with both approved and proposed versions required.
This document lists the required structural drawings needed for a design revision or building modification submission. It specifies that the latest approved drawings must be clouded in yellow and proposed drawings clouded in red. Drawings include general notes, typical details, foundation plans, floor plans, schedules, details, and any other structural drawings - with both approved and proposed versions required.
This document lists the required structural drawings needed for a design revision or building modification submission. It specifies that the latest approved drawings must be clouded in yellow and proposed drawings clouded in red. Drawings include general notes, typical details, foundation plans, floor plans, schedules, details, and any other structural drawings - with both approved and proposed versions required.
S-00-XXX General Notes (Proposed) S-01-XXX Typical Details (Approved) S-01-XXX Typical Details (Proposed) S-02-XXX Foundation (Approved) S-02-XXX Foundation (Proposed) S-03-XXX Floor Plans (Approved) S-03-XXX Floor Plans (Proposed) S-04-XXX Schedules (Approved) S-04-XXX Schedules (Proposed) S-05-XXX Details (Approved) S-05-XXX Details (Proposed) S-06-XXX Any different type of drawings (Approved) S-06-XXX Any different type of drawings (Proposed)
PO Box 478844, Dubai, UAE
T +971 800-4-DDA (332) F +971 4 427 2449 ZA-DC-T-122, Issue 2 dda.gov.ae