You are on page 1of 49

Faculty of Built Environment

BTQS2014
MEASUREMENT OF ARCHITECTURE WORKS

ASSIGNMENT 1

Lecturer In-Charged : NIK NORZAHARIAH ASHIKIN BINTIN.


MOHAMED

Tutorial Group No. : 8

NO. STUDENT NAME STUDENT ID NO. TOTAL MARKS


1. Cheong Yong Leng 21WVR13726 /100
2. Chung Yih Pei 21WVR13738 /100
3. Lim Jie 21WVR13781 /100
4. Li Zhi Chung 21WVR13775 /100
Tay Wei Keen 21WVR13847
5. /100

** Please fill in and bind this page as front cover of your group assignment for submission

Assignment 1/ Page 3
BTQS2014 MEASUREMENT OF ARCHITECTURE WORKS
Marking Scheme Assessment Sheet
ASSIGNMENT 1

8
TUTORIAL GROUP :
NAME OF GROUP
MEMBERS : 1) Cheong Yong Leng (ID NO: 21WVR13726)

2) Chung Yih Pei (ID NO: 21WVR13738


3) Lim Jie (ID NO: 21WVR13781
4) Li Zhi Chung (ID NO: 21WVR13775
5) Tay Wei Keen (ID NO: 21WVR13847

Marks to be
0 1 2 3 4 5
allotted
Not done at Poor : Poorly Below Average: Average: Good: Excellence:
all or Did not done with little Better than Poor Works are acceptable Works are above Works are superior
understand understanding but not good and can be average can have quality, exceed
Description enough to pass. considered possibility of expectations and
to pass. distinction work. showing great
initiative

Total
ASSESSMENT CRITERIA Weightage Allocated Marks Marks Maximum
(A) (B) (A) x (B)

CLO1 - TAKING-OFF LIST

a Ability to list out proper Taking off


List with reasonable assumptions 2.0 10

CLO2 - DIMENSION MEASUREMENT

Showing detailed side cast and


b 3.0 15
annotations

c Ability to measure all items correctly 8.0 40

Clear descriptions of work items


d 3.0 15
complying to MySMM

14.0 70

CLO3 - BILLS OF QUANTITIES

e Ability to sequence items and present


in proper BQ format 4.0 20

TOTAL : 20 100

Assignment 1/ Page 4

You might also like