You are on page 1of 40

SPLIT

SERVICEINSTRUKTION
- Utbyte av cirkulationspump i SE
SPLIT, Xylem till WILO
SERVICE INSTRUCTION
- Replacement of the circulation pump in GB
SPLIT, Xylem to WILO
SERVICEANLEITUNG
- Wechsel des Umwälzpumpensatzes in DE
SPLIT, Xylem zu WILO

LEK

SIT 1805-3
431304
Svenska

Allmänt
Denna serviceinstruktion beskriver byte av cirkulations-
pump Xylem till WILO YONOS PARA 7.0 PWM 1 i SPLIT
inomhusmodul.
Läs igenom hela instruktionen innan arbetet påbörjas.

Komponenter
Cirkulationspumpskit (reservdel) 724 028

1 Cirkulationspump 218 810

2 Packning 033 460

1 Kraftkabel 218 785

1 PWM-kabel 218 938

1 CPU-kort v2.02 718 434

2 EPP-delar 225 623


225 624

1 Lim 033 777

| SE 3
Byte av cirkulationspump i VARNING!
Gör aggregatet spänningslöst innan arbetet
inomhusmodul (Hydro Unit) påbörjas.

Demontering av luckor Elistallation samt service ska ske under överin-


seende av behörig elinstallatör.

1
LEK

LEK

5 7

3
6

4
LEK

LEK
LEK

4 | SE
Demontering OBS!

OBS!
Stäng inkommande ledning XL2. Släpp ut
trycket via säkerhetsventilen. Ställdon QM31
Var aktsam vid demontering och notera kabel- ska vara i stängt (horisontellt) läge.
dragningar samt kontakters placering.

1. Stäng av klimatsystemet genom att HQ1


stänga avstängningsventilen
(QM31) och ventilen vid partikelfilt-
ret (HQ1).

LEK

QM31

2. Släpp ut trycket via avluftningsven-


tilen (QM20) och lämna den öppen.

3. Nu är det möjligt att byta cirkula-


tionspumpen. 2 QM20

| SE 5
LEK
4. Frånkoppla strömkabeln på termi-
nal XJ1.

XJ1

LEK

5. Frånkoppla PWM-signalkabeln från


terminal X1:1 och X1:2 på kommu-
nikationskortet (AA23).

X1:1
X1:2

6 | SE
6. Demontera cirkulationspumpen,
börja med den nedre röranslutning-
en.
6

7a. Utan energimätare: Lossa den övre


muttern (A) och avlägsna röret ge-
LEK

nom att att lossa de två röranslut-


ningspunkterna (B).

7b. Med energimätare: Lossa den övre


muttern (A) och avlägsna röret ge-
nom att att lossa röranslutningen
till flödesmätaren (C). C

8. Avlägsna cirkulationspumpen och


sätt tillbaka topplocket.

B A

9. Börja med att skära ut EPP:n inom


det rastrerade området, mellan min.
LEK

och max. mått, se bild. Det räcker


att kapa ner till rätt djup med en
kniv. Sedan kan delen brytas bort.

| SE 7
Mor
a
kni
v

220
150
60
90
LEK

130
165

10. Demontera topplocket.

UN

8 | SE
11. Du kommer att fästa de båda bifo-
gade EPP-detaljerna (225 623 och
225 624) med lim. OBS: Följ instruk-
tionerna på limförpackningen.
Börja med den nedre EPP-detaljen
(225 624). Lägg en limsträng längs
baksidans ytterkant. Sätt EEP-detal-
jen på plats, justera i höjd med be-
fintlig EPP. (Vänta med den övre
EPP-detaljen.)
Fortsätt nu till kapitel "Montering".

| SE 9
Montering OBS!

OBS!
På kommunikationskortet (AA23) kopplas brun
kabel (signal) in på X1:1.
All elektrisk inkoppling skall ske av behörig Blå kabel kopplas in på X1:2.
elektriker.
Elektrisk installation och ledningsdragning skall
utföras enligt gällande bestämmelser.

1. Byt packningarna, använd de som


bifogats reservdelspumpen.

2. Montera reservdelspumpen. Obser-


vera att utloppsöppningen pekar
nedåt. 2

LEK

1
LEK

3. Återmontera röret till pumpen.

4. Om energimätare inte finns monte- 4b


rad, skruva åt alla muttrar, se (4a).
Om energimätare finns monterad,
skruva åt alla muttrar, se (4b).

3 3

4a 4b

10 LE LE | SE
K K
5. Öppna försiktigt de stängda venti-
lerna. Sök efter eventuella vattenläc-
kor.

QM31

5 HQ1

6. Kontrollera systemtrycket på mano- BP5 FL2


metern (BP5). Fyll på systemet med
vatten om det behövs. LE
K

Klimatsystemets säkerhetsventil LEK

(FL2) skall vara helt tät.

7. Avlufta systemet via avluftningsven-


tilerna (QM20), (QM24) och QM24
(QM60).

QM20 QM60

8. Demontera det gamla CPU-kortet


(AA21) och montera dit det nya.
Var noga med anslutningarna på
kortet!

AA21

LE
| SE K 11
9. Förlägg PWM-kabeln i övre kana-
len, led den bakom metallhöljet till
kommunikationskortet (AA23). Fix- 9
era med buntband.

10. Anslut PWM-kabeln till kommunika-


tionskortet (AA23), terminal X1.
Brun ledare (PWM) till position
1.
Blå ledare (PWM GND) till posi-
tion 2.

10

11. Anslut strömkabeln till terminal XJ1.

11 XJ1

12 LE
K | SE
12. Lägg en limsträng längs baksidans
ytterkant på den övre EPP-detaljen
(225 623). OBS: Följ instruktionerna
på limförpackningen.
Placera den övre EPP-detaljen
(225 623) enligt bild.

13. Återmontera topplocket.

UN

14. Anslut strömmen och starta upp


värmepumpsystemet.

15. Avlufta igen om det behövs. Kon-


trollera systemtrycket på manome-
tern (BP5).

16. Återmontera luckorna.

| SE 13
English

General
This service instruction describes the replacement of a
Xylem circulation pump for WILO YONOS PARA 7.0 PWM
1 in SPLIT indoor modules.
Read all of the instructions before starting work.

Components
Circulation pump kit (spare part) 724 028

1 Circulation pump 218 810

2 Gasket 033 460

1 Power cable 218 785

1 PWM cable 218 938

1 CPU board v2.02 718 434

2 EPP components 225 623


225 624

1 Adhesive 033 777

14 | GB
Replacement of circulation WARNING!
Cut the power to the unit before starting work.
pump in indoor module (Hydro
Electrical installation and service must be car-
Unit) ried out under the supervision of a qualified
electrician.
Removing the covers

1
LEK

LEK

5 7

3
6

4
LEK

LEK
LEK

| GB 15
Dismantling NOTE

NOTE
Close incoming line XL2. Release the pressure
via the safety valve. Actuator QM31 must be
Take care when removing and make a note of in the closed (horizontal) position.
the cable routing and positioning of switches.

1. Switch off the climate system by HQ1


closing the shut-off valve (QM31)
and the valve at the particle filter
(HQ1).

LEK

QM31

2. Release the pressure via the vent


valve (QM20) and leave it open.

3. The circulation pump can now be


replaced. 2 QM20

16 | GB
LEK
4. Disconnect the power cable from
terminal XJ1.

XJ1

LEK

5. Disconnect the PWM signal cable


from terminal X1:1 and X1:2 on the
communication board (AA23).

X1:1
X1:2

| GB 17
6. Remove the circulation pump, start
with the lower pipe connection.

7a. Without energy meter: Slacken


off the upper nut (A) and remove
LEK

the pipe by detaching the two pipe


connections (B).

7b. With energy meter: Slacken off


the upper nut (A) and remove the
pipe by detaching the pipe connec-
tion to the flow meter C). C

8. Remove the circulation pump and


replace the top cover.

B A

9. Start by cutting out the EPP within


the cross-hatched area, between
LEK

the min. and max. measurements,


see image. It is sufficient to cut it
down to the correct depth with a
knife. The part can then be broken
off.

18 | GB
Mor
a
kni
v

220
150
60
90
LEK

130
165

10. Remove the top cover.

UN

| GB 19
11. You will bond the two enclosed EPP
components (225 623 and 225 624)
with adhesive. Note! Follow the in-
structions on the adhesive pack-
aging.
Start with the lower EPP compon-
ent (225 624). Apply a bead of ad-
hesive along the outer edge of the
rear side. Place the EPP component
in position, align vertically with the
existing EPP. (Wait before installing
the upper EPP component).
Now continue to the chapter “In-
stallation”.

20 | GB
Mounting NOTE

NOTE
On the communication board (AA23), the
brown cable (signal) is connected to X1:1.
All electrical connections must be carried out The blue cable is connected to X1:2.
by an authorised electrician.
Electrical installation and wiring must be car-
ried out in accordance with the stipulations in
force.

1. Replace the gaskets, use the ones


supplied with the replacement
pump.

2. Install the replacement pump. Note


that the outlet opening points 2
downwards.

LEK

1
LEK

3. Reinstall the pipe to the pump.

4. If an energy meter is not installed, 4b


tighten all nuts, see (4a).
If an energy meter is installed,
tighten all nuts, see (4b).

3 3

4a 4b

| GB 21
LE LE
K K
5. Carefully open the closed valves.
Look for any water leakage.

QM31

5 HQ1

6. Check the system pressure on the BP5 FL2


manometer (BP5). Top up the sys-
tem with water if necessary. LE
K

The climate system's safety valve LEK

(FL2) must be completely sealed.

7. Vent the system via the vent valves


QM20), (QM24) and (QM60. QM24

QM20 QM60

8. Remove the old CPU board (AA21)


and install the new one.
Take care with the connections on
the board.

AA21

LE
22 K | GB
9. Lay the PWM cable in the upper
duct, route it behind the metal
housing to the communication 9
board (AA23) Secure using cable
ties.

10. Connect the PWM cable to the


communication board (AA23), ter-
minal X1.
Brown core (PWM) to terminal 1.
Blue cable (PWM GND) to termin-
al 2.

10

11. Connect the power cable to termin-


al XJ1.
11 XJ1

| GB LE
K 23
12. Apply a bead of adhesive along the
outer edge of the rear side of the
upper EPP component (225 623).
Note! Follow the instructions on the
adhesive packaging.
Position the upper EPP component
(225 623) as illustrated.

13. Replace the top cover.

UN

14. Connect the power and start the


heat pump system.

15. Vent again if necessary. Check the


system pressure on the manometer
(BP5).

16. Refit the covers.

24 | GB
Deutsch

Allgemeines
In dieser Serviceanleitung wird der Wechsel der Umwälz-
pumpe Xylem zu WILO YONOS PARA 7.0 PWM 1 in
SPLIT-Inneneinheiten beschrieben.
Lesen Sie vor Beginn der Arbeiten die gesamte Anleitung
vollständig durch.

Komponenten
Umwälzpumpensatz (Ersatzteil) 724 028

1 Umwälzpumpe 218 810

2 Dichtungen 033 460

1 Stromversorgungskabel 218 785

1 PWM-Kabel 218 938

1 CPU-Platine v2.02 718 434

2 EPP-Teile 225 623


225 624

1 Klebstoff 033 777

| DE 25
Wechsel der Umwälzpumpe in ACHTUNG!
Unterbrechen Sie vor Beginn der Arbeiten die
der Inneneinheit (Hydro Unit) Spannungszufuhr zum Aggregat.

Abdeckungen demontieren Elektrische Installation sowie Servicearbeiten


müssen unter Aufsicht eines ausgebildeten
Elektroinstallateurs erfolgen.

1
LEK

LEK

5 7

3
6

4
LEK

LEK
LEK

26 | DE
Demontage HINWEIS!

HINWEIS!
Schließen Sie die Eingangsleitung XL2. Lassen
Sie den Druck über das Sicherheitsventil ab.
Gehen Sie bei der Demontage sorgfältig vor Stellantrieb QM31 muss sich in der geschlosse-
und protokollieren Sie die Kabelverlegung so- nen (horizontalen) Stellung befinden.
wie die Kontaktanbringung.

1. Schalten Sie das Klimatisierungssys- HQ1


tem aus, indem Sie das Absperrven-
til (QM31) und das Ventil am Parti-
kelfilter (HQ1) schließen.

LEK

QM31

2. Lassen Sie den Druck über das Ent-


lüftungsventil (QM20) ab und las-
sen Sie dieses geöffnet.

| DE 27
3. Jetzt kann ein Wechsel der Umwälz-
pumpe erfolgen. 2 QM20

4. Trennen Sie das Netzkabel vom


Anschluss XJ1. LEK

XJ1
LEK

28 | DE
5. Lösen Sie das PWM-Signalkabel von
Anschluss X1:1 und X1:2 an der
Kommunikationsplatine (AA23).

X1:1
X1:2

6. Demontieren Sie die Umwälzpum-


pe. Beginnen Sie mit dem unteren
Rohranschluss.
6
LEK

| DE 29
7a. Ohne Wärmemengenzähler: Lö-
sen Sie die obere Mutter (A) und
entfernen Sie das Rohr, indem Sie
die beiden Rohranschlusspunkte (B)
lösen.

7b. Mit Wärmemengenzähler: Lösen


Sie die obere Mutter (A) und entfer-
nen Sie das Rohr, indem Sie den C
Rohranschluss für den Volumen-
strommesser (C) lösen.

8. Entfernen Sie die Umwälzpumpe


und bringen Sie die obere Abde-
ckung wieder an.

B A

9. Schneiden Sie zunächst das EPP im


gekennzeichneten Bereich zwi-
LEK

schen dem minimalen und maxima-


len Maß aus, siehe Abbildung. Es
genügt, mit einem Messer bis in die
richtige Tiefe zu schneiden. Danach
kann der Bereich abgebrochen
werden.

Mor
a
kni
v
220
150
60
90
LEK

130
165

30 | DE
10. Demontieren Sie die obere Abde-
ckung.

UN

11. Die beiden beiliegenden EPP-Teile


(225 623 und 225 624) werden mit
Kleber befestigt. Hinweis: Folgen
Sie den Anweisungen auf der Kleb-
stoffverpackung.
Beginnen Sie mit dem unteren EPP-
Teil (225 624). Bringen Sie einen
Klebstoffstrang entlang der äuße-
ren Hinterkante an. Bringen Sie das
EPP-Teil an. Passen Sie seine Höhe
am vorhandenen EPP-Teil an. (Brin-
gen Sie das obere EPP-Teil noch
nicht an.)
Fahren Sie mit dem Kapitel „Monta-
ge“ fort.

| DE 31
Montage HINWEIS!

HINWEIS!
Verbinden Sie an der Kommunikationsplatine
(AA23) das braune Kabel (Signal) mit X1:1.
Alle elektrischen Anschlüsse müssen von einem Verbinden Sie das blaue Kabel mit X1:2.
geprüften Elektriker ausgeführt werden.
Bei der Elektroinstallation und beim Verlegen
der Leitungen sind die geltenden Vorschriften
zu berücksichtigen.

1. Ersetzen Sie die Dichtungen durch


die Dichtungen im Lieferumfang
der Ersatzteilpumpe.

2. Montieren Sie die Ersatzteilpumpe.


Beachten Sie, dass die Austrittsöff- 2
nung nach unten weist.

LEK

1
LEK

3. Bringen Sie das Rohr für die Pumpe


wieder an.
4b
4. Wenn ein Wärmemengenzähler
nicht montiert ist, ziehen Sie alle
Muttern an, siehe (4a).
Wenn ein Wärmemengenzähler
montiert ist, ziehen Sie alle Muttern
an, siehe (4b). 3 3

4a 4b

32 | DE
LE LE
K K
5. Öffnen Sie vorsichtig die geschlos-
senen Ventile. Suchen Sie nach et-
waigen Wasserlecks.

QM31

5 HQ1

6. Kontrollieren Sie den Systemdruck BP5 FL2


am Manometer (BP5). Falls erforder-
lich, befüllen Sie das System mit LE
K
Wasser.
LEK

Das Sicherheitsventil des Klimatisie-


rungssystems (FL2) muss dicht
schließen.

7. Entlüften Sie das System über die


Entlüftungsventile (QM20), (QM24) QM24
und (QM60).

QM20 QM60

8. Demontieren Sie die alte CPU-Plati-


ne (AA21) und installieren Sie die
neue.
Behandeln Sie die Anschlüsse an
der Platine sorgfältig!

AA21

LE
| DE K 33
9. Verlegen Sie das PWM-Kabel im
oberen Kanal. Führen Sie es hinter
dem Metallgehäuse zur Kommuni- 9
kationsplatine (AA23). Nutzen Sie
zur Befestigung Kabelbinder.

10. Verbinden Sie das PWM-Kabel mit


der Kommunikationsplatine
(AA23), Anschluss X1.
Brauner Leiter (PWM) an Position
1.
Blauer Leiter (PWM GND) zu Posi-
tion 2.

10

11. Verbinden Sie das Netzkabel mit


dem Anschluss XJ1.
11 XJ1

34 LE
K | DE
12. Bringen Sie einen Klebstoffstrang
entlang der äußeren Hinterkante
am oberen EPP-Teil an (225 623).
Hinweis: Folgen Sie den Anweisun-
gen auf der Klebstoffverpackung.
Positionieren Sie das obere EPP-Teil
(225 623) gemäß Abbildung.

13. Bringen Sie die obere Abdeckung


wieder an.

UN

14. Schließen Sie die Stromversorgung


an und starten Sie das Wärmepum-
pensystem.

15. Führen Sie bei Bedarf eine erneute


Entlüftung aus. Kontrollieren Sie
den Systemdruck am Manometer
(BP5).

16. Bringen Sie die Abdeckungen wie-


der an.

| DE 35
WS name: -Gemensamt
WS version: a460
WS release date: 2018-01-17 13:30
Publish date: 2018-01-29 07:30

431304

You might also like