Substation 700MW CSP+250MW PV HYBRID-IPP PHASE IV Sub-contractor JEPCC Equipment Cold and hot salt pump #3VSD tank 5/6 Installation location TES -NORTH BUILDING 1. Equipment parameters WDZC-YJY73-6/10kV Model Rated Voltage (kV) 6/10kV 3x1x240 The Starting 23BBA20GS405 The Ending #3VSD tank 5/6
Cable Iength (m) Release Date /
Cable KKS Manufacturer /
2. Insulation Resistance measurement
Insulation Measured Value(GΩ) Test Position Resistance test Test Time(min) voltage (V-DC) Before Voltage test After Voltage Test
A-B,C and ground 2500 1 >1000 >1000
B-A,C and ground 2500 1 >1000 >1000
C-A,B and ground 2500 1 >1000 >1000
3. AC withstand voltage test
Test Position Test Voltage (kV) Test Time (min) Test Frequency (Hz)
A-B,C and ground 24 15 180.1
B-A,C and ground 24 15 180.6
C-A,B and ground 24 15 181.0
Test Result Pass
4. Check the ends of the line phase
Test Result Correct
Test Date 2023.03.24 Temperature 35.0 ℃ 36 %
Calibration due Test Instrument Make Model Serial Number date Insulation Resistance SCEEC DM50C 521575 22/06/2024 Tester Series Suzhou Resonance Test Industrial Park HVFRF-270 41539 22/06/2024 Device Haiwo