Professional Documents
Culture Documents
NO: JSA/OAE/046
ORIENT AROTEK ENGINEERING & TRADING SDN BHD DATE :
PROJECT
FABRICATION: -Hit by tank plate Ensure tank plate been rolling by expertise
2.0 Tank Plate rolling and fabrication person.
Ensure rolling work area been barricaded
-Flying fire heat spark Ensure workers use face shield and glove
-fire No flammable materials should be keep at
fabrication site
-Electrocution Ensure welding machine and cable in good
condition.
4.2 Painting and modification works -Falling materials Ensure work are been barricaded with proper
-spillage of paint signage
Ensure paint been store at specific storage
area.