The document is a record of dewatering activities from pile caps at locations P110B and P110C between October 2020 and December 2021. It notes the date, location, work description, equipment used (1 centrifugal diesel pump with 10 horsepower), and hours worked for each activity. Dewatering involved removing water from the pile caps using the centrifugal pump at various intervals ranging from 2 to 11 hours over the recorded period.
The document is a record of dewatering activities from pile caps at locations P110B and P110C between October 2020 and December 2021. It notes the date, location, work description, equipment used (1 centrifugal diesel pump with 10 horsepower), and hours worked for each activity. Dewatering involved removing water from the pile caps using the centrifugal pump at various intervals ranging from 2 to 11 hours over the recorded period.
The document is a record of dewatering activities from pile caps at locations P110B and P110C between October 2020 and December 2021. It notes the date, location, work description, equipment used (1 centrifugal diesel pump with 10 horsepower), and hours worked for each activity. Dewatering involved removing water from the pile caps using the centrifugal pump at various intervals ranging from 2 to 11 hours over the recorded period.