RKD material list for P110 and P111

SL TOTAL TONNAGE AT TESTING AT WHICH DT OF TESTING TOTAL MATERIAL


DATE WHICH MATERIALS TO BE TESTED
NO WORKSHOP(MT) NABL LAB SENDING REPORT RECD REQUIRED

1 11/3/2021 M.S PLATE:- 113.349 OMEGA 11/11/2021 11/22/2021


12MM,16MM,32MM,25M,,20MM

2 29/11/10-12-2021 M.S PLATE;-28MM,10MM ,ANGLE 22.018 OMEGA 12/10/2021 1/5/2022


100X100X10 ETC 161.23+(1% for
welding)= 162.842MT
3 12/21/2021 M.S PLATE;-28MM 17.092 OMEGA 12/22/2021 1/7/2022
M.S PATE:-28MM &SHER STUD
4 19/1//22 25MMX100MMLONG 33.97 MANGALAM 1/25/2022

TOTAL 186.429