You are on page 1of 2

Republic of the Philippines

Department of Education
Region
SCHOOLS DIVISION OFFICE OF BATANES
( ) DISTRICT
PAG ASA ELEMENTARY SCHOOL

Pre-Inspection Report
Project Title : Installation of windows
____________________________________________________

Location : PAG ASA ELEMENTARY SCHOOL


____________________________________________________

Date Inspected: 03/21/2023


____________________________________________________

Nature of Repair/Work: Repair and Maintenance

repair of the classroom's windows

Inspected: Conforme :

MARIA C. SANTOS ARIEL C. RIEZA


Head, Inspectorate Team School Head

NOTED BY:

ENGR. JULIE B. ABANTO


ENGINEER III
Republic of the Philippines
Department of Education
Region
SCHOOLS DIVISION OFFICE OF BATANES
( ) DISTRICT
PAG ASA ELEMENTARY SCHOOL

You might also like