Fabricate new size for the teared no.

of screen (Line 2- Materials


DOSING For verification if done from FME
penetrates from the chamber, Perforated Hammermill Screen)

Provision and installation of drum part (Line 1- Inefficient material


DOSING Related to item 23
cleaning of centrifugal sieve, No drum parts installed)

Provision and installation of the vibro motor (Line 1- Difficulty on


DOSING discharging premixes material in handtipped pit, No vibro motor  
installed)
Bin 323 discharger is not functioning since commissioning, There
DOSING  
is no Linak Cylinder to enable the opening and closing of flap
Polluted Flat Bulk Basement, Low chance of being prioritized
INTAKE Ask FME for actual location
during plant housekeeping due to absence of fluorescent lights.
INTAKE PLC Fault in Bulk Intake and transport For verification if fault is still existing
Sewing machine of bagging line 5 can't cut the thread after
BAGGING For verification if done
sewing, Solenoid valve is not functioning, Replace solenoid valve
Steam entering the conditioner even after pelletmill shutdown,
PELLETING Steam passes through the positioning valve even when the For verification
pelletmill is not running
Leaking of steam/condensate at PRV, Loose seal at junction,
PELLETING Further diganosis for concrete recommendedation
Retighten seal,T2
PELLETING Faulty fines return level reading, Faulty Sensor, Replace sensor For verification

PELLETING Timing of bagging cant be adjusted, Busted timers, Replace timers For verification

PELLETING Worn out knife cutters at PM, Acquire new cutters For verification
false inlet back up probe results to shutdown of pelletmill,
PELLETING For verification to Kevin
sensitive probe, adjust the flap
steam flow cannot be throttled, steam controller is not
PELLETING For verification
functioning, check the solenoid or the valve
build up of pellets in bucket elevator, Cannot reach high level
PELLETING For verification
sensor of hopper in fat coater, reposition of sensor