Professional Documents
Culture Documents
PREFACE
ACKNOWLEDGMENTS
1
- Specification
- Isometric Drawing & BOM
- Pipe Support Design
- Load Schedule (electrical)
- Installation
- Operation & Maintenance
BIBLIOGRAPHY
APPENDICES
ATTACHMENTS
2
TWO (2) TITLES OF PROPOSED ENGINEERING REPORT
PREFACE
ACKNOWLEDGMENTS
3
- Load Schedule (electrical)
- Installation
- Operation & Maintenance
BIBLIOGRAPHY
APPENDICES
ATTACHMENTS
4
TWO (2) TITLES OF PROPOSED ENGINEERING REPORT
EACH WITH A SHORT WRITE-UP AND TABLE OF CONTENTS
Auxiliary Line
The auxiliary line is designed to provide to produce the Supplemental Premix
to be used as one of the raw materials/ingredients of the Tagoloan B-Meg
Feed Mill Plant.
PREFACE
ACKNOWLEDGMENTS
Auxiliary Line
- Project Requirement
- Design
- Flow diagram & P&ID
- Equipment
- Equipment Sizing & Specification
- Equipment Layout
- Loading Data (civil)
- Load Schedule (electrical)
- Installation
- Operation & Maintenance
5
CHAPTER III: ECONOMICS
BIBLIOGRAPHY
APPENDICES
ATTACHMENTS