Professional Documents
Culture Documents
TABLE OF CONTENTS
CL. NO. DESCRIPTION PAGE NO
1. INTRODUCTION..................................................................................................................... 1
2. GENERAL INFORMATION: .................................................................................................. 1
3. DESIGN BASIS: ....................................................................................................................... 2
3.1 SITE DATA: ............................................................................................................................. 2
3.2 SITE LOCATION: ................................................................................................................... 2
3.3 MATERIAL CHARACTERISTICS: ....................................................................................... 2
4. SYSTEM REQUIREMENT ..................................................................................................... 4
4.1.0 GENERAL ................................................................................................................................ 5
5. EXISTING SYSTEM DESCRIPTION..................................................................................... 6
6. PROPOSED SYSTEM DESCRIPTION................................................................................... 7
7. MAJOR EQUIPMENTS........................................................................................................... 8
8. TECHNICAL FEATURES OF ALUMINA UNLOADING AND TRANSPORTATION
SYSTEM ..................................................................................................................................11
8.01 PIPE CONVEYORS ................................................................................................................11
8.02 AIR SLIDE...............................................................................................................................17
8.03 SCREW TYPE AIR COMPRESSOR .....................................................................................18
8.04 FAN ..........................................................................................................................................18
8.05 BEARING AND BEARING HOUSING..................................................................................19
8.06 DE-DUSTING UNITS / BAG FILTERS (JET PULSE TYPE)...............................................20
8.06.01 GENERAL ...............................................................................................................................20
8.06.02 BAGS........................................................................................................................................20
8.06.03 BAG MONITORING AND PROTECTION EQUIPMENT ...................................................20
8.06.04 DEDUSTING AIR VOLUME..................................................................................................20
8.06.05 VENTING DUCTS ..................................................................................................................21
8.06.06 HOPPER CONSTRUCTION ..................................................................................................21
8.07 AIRLOCKS..............................................................................................................................21
8.08 ROPE WINCH SYSTEM ........................................................................................................21
8.09 EQUIPMENT PARAMETERS AND OTHER SALIENT FEATURES: ...............................22
9. PERFORMANCE REQUIREMENT OF MAJOR EQUIPMENTS......................................24
10. UTILITY FOR ALUMINA UNLOADING AND TRANSPORTATION SYSTEM...............25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
11. ATTACHMENT
SL.
ENCLOSURES DRAWING NO
NO.
Proposed layout of Alumina
1) Unloading & Transportation System 14L08-DWG-M-PL-001, REV. I
in Smelter Plant
1. INTRODUCTION
1.01 This document is to draw out design memorandum / technical features for Alumina Unloading and
Transportation at Smelter Plant, ANGUL of National Aluminium Company Limited (NALCO),
Odisha.
1.02 The scheme shall be in line with Process Flow Sheet, (Drg. No. 14L08-DWG-PR-PFD-001 REV.
A (2 Sheets) and Proposed layout Sectional Drawings of Alumina Unloading & Transportation
System in Smelter Plant (Drg. No. 14L08-DWG-M-PL-001,14L08-DWG-M-PL-002, 14L08-
DWG-M-PL-003 & 14L08-DWG-M-PL-004).
The new Alumina Unloading and Transportation system will commence from wagon unloading
and will terminate above the existing silos (silo no.6&5,2&1). From silo no.1&5 the incoming
alumina will be transported to silo no.3&4, 7&8 respectively through existing conveying /air
sliding path.
Alumina will be coming in the BTAP closed wagons in a rake. Wagon unloading system shall
include 2 nos. rope winch systems for hauling of 12 nos. BTAP wagons in each system and
positioning of wagons on the unloading platform, Pneumatic wagon unloading system followed by
air slides placed in an underground pit by gravity and through underground pipe conveyor to
transfer points located above the ground for further conveying by pipe conveyors to the alumina
silos. De-dusting, Ventilation & Air Conditioning system at appropriate locations shall be
provided.
1.03 The work for proposed system shall be carried out conforming to latest applicable Indian Standards
or other recognized international standards such as ASTM / CEMA / ASME / ISO/ DIN / JIS in the
absence of Indian standards.
1.04 Alumina Unloading and Transportation facility shall comply with applicable statutes, regulation
and safety codes related to design, construction & operation of the wagon unloading and
transportation system.
Sl. Type of Wagon Height Width Length over Gross Payload
No. (m) of coupling / Mass (tonne /
Tank overall (tonne) Volume)
(m) (m) Approx.
2. GENERAL INFORMATION:
PLANT HISTORY:
National Aluminum Co. Limited (NALCO) has set up a multi-location Bauxite alumina–
Aluminum Complex along with captive Power Plant in the state of Odisha. The implementation of
the project started in the year 1981 and all the segments of the project were commissioned by 1987
and are operating at rated capacity. As part of Phase-I expansion Pot line-3, pot room auxiliaries
and new carbon plant were installed at Angul to enhance total production of Primary aluminum to
345000TPY. As part of Phase-II expansion (Pot line-4), NALCO is further enhancing its total
production capacity of Primary aluminum to 4, 60,000TPY.
Page 1 of 34
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
3. DESIGN BASIS:
Aluminium smelter plant of NALCO is located at a site approximately 5 km. from the nearest town of
Angul in the state of Odisha. The site is connected by a link road to the existing highway NH-55,
linking NH-5 (Calcutta-Madras) and NH-6 (Calcutta- Bombay).
CHARACTERISTICS OF ALUMINA
Type : Sandy
Maximum density after Compression : 1.1 t/m3
under 4 bar
Page 2 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
SPECIFICATION OF ALUMINA
+125 micron Wt % 10 - 12 15
Page 3 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
4. SYSTEM REQUIREMENT
Requirement of Fresh Alumina for
: 900000 T per annum
the smelter plant (after expansion)
Days/Annum. : 365
Total hours/shift : 8
The alumina handling plant is designed to operate 365 days in a year without interruption. The
proposed Alumina Unloading and transportation system shall be designed & installed in such a way so
that any one stream can be operated and if required both streams can be operated simultaneously.
Page 4 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
4.1.0 GENERAL
The following Design Criteria shall apply to all mechanical equipment.
4.01.01 The system shall be capable of operating continuously round the clock throughout the year. The
installation must be designed so that it can always be serviced without having a complete
shutdown.
4.01.02 Design of all facilities shall be in accordance with this specification and the respective
specification enclosed with the Purchase requisition.
4.01.03 Alumina unloading and transportation system shall be laid out and constructed for convenience
and safety of operation and maintenance. All equipment shall be oriented to permit servicing in
such a way as to require a minimum of dismantling. The specification indicates a minimum
standard of quality for the materials, fabrication and construction of the proposed plant.
4.01.04 All equipment and materials (mechanical, piping, electrical, instrumentation, controls, civil,
architectural etc) shall be sourced from manufacturers acceptable to DCPL and NALCO. For the
items not covered in the list, contractor shall submit the sub-vendor list along with the proven
track record of the proposed sub-vendors for review/approval of NALCO and DCPL before
placing orders for those items.
4.01.05 All electrical installations including the hoists in open area shall be provided with rain protection
hood.
4.01.06 Maintenance platforms/access walkways shall be provided at one end beam for each electric
monorail hoist.
4.01.07 All the equipment shall be field proven for such an operation taking into consideration normal
preventive and running maintenance of the unit and their auxiliaries. The spare part list along with
the drawings and part numbers shall be provided.
4.01.08 All equipment, controls and structure shall be designed for installation in carbon and alumina dust
charged atmosphere of aluminium smelter area and seismic condition of site.
4.01.09 All equipment shall be of proven design. Prototypes or extensive modifications of the basic
designs are unacceptable.
4.01.10 The installation shall be designed with adequate facilities for maintenance & operations.
4.01.11 The design, fabrication, painting, supplies and testing shall conform to relevant international
codes and standards, Indian codes and standards, wherever applicable, shall take precedence over
those of other nationalities. Only latest editions including addenda shall be referred to.
4.01.12 Design, fabrication & operation of the plant shall be based on the following:
A) Indian factory act
B) Indian explosive act
C) Petroleum & Carbide of calcium manual
D) Fire protection manual of fire sectional committee, Insurance association of India
E) Regulations laid down by explosive directorate and electrical inspectorate
F) Regulations of Director general of civil aviation for all stacks
Page 5 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
The requirement of fresh alumina for the smelter plant after expansion will be approximately
9, 00,000TPY.The additional requirement of fresh alumina for the phase-2 expansion is approximately
2, 42,350 TPY.
In the existing NALCO Smelter Plant, requirement of alumina is being catered by transporting
alumina from Damanjodi to Angul in specially designed pneumatically operated wagons. These
wagons have a payload capacity of approx 55 T each. Total alumina payload in a rake comprising 48
to 52 wagons i.e. approximately 2700 T.
The residence time of rake is at present 8 hrs as maximum. The unloading time of one rake is
approximately 5 hrs. During unloading, a group of wagons are placed in position and each wagon is
connected to compressed air inlet. Flexible hoses are connected with one end to wagon evacuation
Page 6 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
points and other end to the fixed pipes leading to air slides. The rate of unloading for individual wagon
is 2 T/min. The extracted alumina is conveyed through air slide for feeding to intermediate bin (15 T
capacity). From the intermediate bin (having fluidized bottom) alumina comes to belt conveyor TR1
that conveys alumina to existing silos 1, 2, 3, 4, 5, 6, 7 & 8 through number of belt conveyors/air
slides at the rate of 1000TPH.
The main conveyor TR1 is integrated with weigh scale of the load cell type to meter the quantity of
alumina to be conveyed to the silos. In the existing unloading system an outlet has been provided from
the distribution box located over silo No. 1 to feed to air slide HA-AL-001. The air slide HA-AL-001
conveys alumina to the belt conveyor HC-BL-002.The belt conveyor transports alumina to pot line 3
areas for feeding to Silo No.5 (TI-AL-020) or to Silo No. 7 (TI-AL-021), through air slides and belt
conveyor HC-BL-012.
The plant will have a yearly aluminium production capacity of 4,60,000 T after phase-2 expansion,
which approximately corresponds to a yearly requirement of 9,00,000 T of alumina. To achieve such
alumina requirement a new system with wagon unloading facility by gravity and alumina conveying to
the silo 5&6 and silo 1&2 (separately) have been envisaged.
From silo1 & silo 5 the alumina can be diverted to silo 3&4 and silo 7 &8 respectively through
existing conveying path (conveyor / air slides).Similar to existing system, alumina will arrive at the
plant in specially designed pneumatically operated wagons. Each rake is grouped in 52 wagons
corresponding to a service capacity of approx. 2700 ton. This new system has been envisaged to
facilitate to convey alumina to each silo @1000 TPH through pipe conveyors (for silos 1, 2&5, 6)
independently to all the silos during shut down of existing main conveyor TR1 & also conveyor (HC-
BL-002) which is conveying alumina from silo1 to silo 5. Afterwards alumina transportation facility
has been connected to existing belt conveyor TR2 & BL012 (both conveyors having 1400mm belt
width) for filling of silos 3, 4 & 7, 8 respectively.
Unloading of alumina from wagon for this new system shall be done in between proposed expansion
railway tracks1 &2 (12m apart), located at east side of Rolling Plant (RP). Suitable rope winch
systems (2nos.) for hauling 12 BTAP wagons has been envisaged. The unloading of 8 wagons shall be
done at a time (4 nos. wagon from each track).The drive units and automatic rope tensioning
arrangements of the winch systems shall be located in a common shed / house. 2 nos. Rope winch
system (reversible type) have been provided for wagon hauling, positioning for unloading and also
operate haulage winch to move the wagons from the unloading zone and again set for the position for
next 8 wagons. By adopting the suitable connecting / removing of hitch ropes / round link chain siling
to the near side rope / far side rope, the optimisation of unloading cycle are to be obtained.
A dedicated operator cabin shall be provided over the unloading area at the starting point to precisely
control the placement of rake in the unloading stations.
Unloading of alumina from each BTAP wagon is to be connected to compressed air inlet and also
flexible hoses to be connected with one end to wagon discharge points and other end to fixed pipes for
Page 7 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
gravity discharge (for quick unloading and lesser energy consumption) to the air slides placed in an
underground pit (i.e. in between two railway tracks). Unloaded alumina shall be conveyed by air slides
(3 nos.) to pipe conveyor PC-100 partly underground and partly over ground which in turn feed
alumina either to pipe conveyor PC-200 or another pipe conveyor PC-300 through 2-way chutes at
transfer point TP-1 located above ground. Underground tunnel shall have the sump with pumping (1w
+1s) facility to drain out water from the sump. The pipe conveyor (PC-100) shall be provided with
integrated Belt weigh scale of load cell type for metering amount of Alumina conveyed to the silos.
The pipe conveyors PC-200 & PC-300 shall carry same alumina from TP-1 to silo-1&2 and silo-5 &6
respectively through air slides (4 nos.). Two nos. transfer points (TP-2 & TP-3) shall be provided, one
near silo 1 &2 and other transfer point near to silo5 & 6 to convey alumina to silo1& 2 and silo5&6.
One rack and pinion type passenger cum goods lift of capacity 1Ton (16 passengers) with one side
collapsible gate shall be provided near the transfer point (TP-3) of silo 5&6.
Five nos. de-dusting units with measurement system of DP, Inlet pressure, outlet pressure and pulsing
pressure etc. one at unloading area, one at feeding area of pipe conveyor PC-100 from air slide (AS –
300) and three nos. at different transfer houses shall be installed. The dust emission level from the de-
dusting units shall be limited to 10 mg/Nm3.
One new control room, MCC room, Blower room & VVVF room shall be suitably installed. No
disturbance to the existing system while erection and commissioning will be allowed except during
hook-up. During construction and erection, proper care shall be taken for existing equipment at the
interface.
7. MAJOR EQUIPMENTS
Page 8 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
Page 9 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
The above is a list of major equipment only. Any other equipment required to make the system
complete in all respect for its successful and guaranteed operation which is acceptable to
NALCO and DCPL is also deemed to be included under bidder’s scope without any additional
cost to Owner.
Page 10 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
The technical features of major equipment of alumina unloading and transportation system should
address all functional, safety and environmental requirement. All equipment foundation bolts shall
be high tensile (HT) bolts.
A. Mechanical
1. Conveyor Belt
2. Idler incl. Bracket
3. Pulleys
4. Plummer Block
5. Pulley Bearing
6. Discharge Hood
7. Discharge Chute & Liner
8. External Pre-Scrapper
9. External Main Scrapper
10. Int. V Plough Belt Cleaner
11. Drive Motors
12. Input Coupling
13. Gearbox
14. Output Coupling
15. Coupling Guards
16. Drive Base Frame
17. Pulley Frames
18. TU Arrangement
19. Disc Brake
20. Guide Frame
21. Take Up Cage
22. Stringer Frame & Post
23. Deck Plate
24. Skirt Board Assy.
25. Safety & Limit Switches.
26. Suitable no. of stairs, cross-over and platform from ground shall be provided
wherever access is required for regular inspection, Lubrication or operation of
machinery or equipment.
27. Clear walkway on one side of 1200 mm and other side of 600 mm minimum width
shall be provided along the length of pipe conveyor gallery.
28. In an underground tunnel, a clear walkway space of 1000 mm shall be provided
along the length of the conveyor on either side.
29. The pipe conveyor gallery structure shall be of box type with side sittings and also
top covered to avoid rainwater entry.
30. 1500 mm clearance shall be maintained all around drive system for maintenance
purpose.
Page 11 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
31. Maintenance platform & walkway for pipe conveyors shall be of chequered plate
construction
Electrical drive motors for pipe conveyors shall be VVVF drive and for detail description of
VVVF drive, please refer relevant electrical DBR.
A. Design
Duty - Continuous
Cover - Rubber
C. Pulley
Shell - IS 2062
Disc - IS 2062
Hub - IS 2062
Construction - Welded
Page 12 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
Tolerance - IS 919
D. Idler
Machinging - IS 919
Tolerance
Housing
Connection - Welded to Roll Tubes
Page 13 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
E. Skirt Board
F. Deck Plate
Material - IS 2062
Thickness - 3.15 mm
G. Chute Work
H. Technological Structure
Stringer &
Short Post - IS 2062 / Rolled Section
Page 14 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
Construction - Bolted
I. Gear Box
Housing - Fabricated
Lubrication - Splash.
Mechanical Rating - Should be greater than equal to at least 1.25 times on Motor Rating
Or 1.5 times on Drive Pulley Shaft Power.
Thermal Rating - shall be at least equal to the motor rating.
Cooling Type - Natural Cooling.
Type - Resilient
Type - Geared
Protection - IP 65
Contact - 2 NO + 2 NC
Reset - Manual
Page 15 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
Location - 50 m C/C
Protection - IP 65
Contact - 2 NO + 2 NC
Reset - Manual
N. Speed Monitor
Operating Distance- 15 mm
Protection - IP 67
Contact Rating - 5A
Diameter - 3 mm
Page 16 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
Eye Hook
Diameter - 35 mm
Construction - 6 mm Rod
8.02 AIR SLIDE
Page 17 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
8.04 FAN
The fans shall be capable of withstanding the stresses which may be experienced during normal
operation and during over speed testing. All fans shall be suitable for outdoor installation.
All the fan units shall be reasonably noise and vibration free in operation and hence of reasonably
low speed. The noise level shall be limited to 80 db at 1.5M radius.
Operating pressure of fan shall not exceed 93% of Peak pressure of fan performance curve.
Fan static efficiency – min. 80%
Drive – Directly coupled and motor
Fan performance testing shall be as per BS : 848, Class ‘A’ latest revision.
Anti-vibration pads to be provided for fan installed above ground level
Inspection doors with fly nuts and gasket of suitable size shall be provided on the scroll for easy
access to fan internals for inspection, Cleaning and for in-situ rotor balancing.
Fan casing shall be provided with clean out doors and drain plugs, as required
Inlet Boxes are to be provided as required and casing shall be stiffened to resist vibrations and
distortions.
Motorised inlet damper has to be provided for fans with motor rating above 11 kW.
The fan and the drive motor shall be rated for continuous operation.
The starting torque characteristic of the motor shall be suitable for the duty desired.
All centrifugal fans may have adequate arrangement for vibration isolation of minimum 70%
efficiency as the case may be.
The centrifugal fans shall have flat backward inclined / backward curved blades. They shall be
single inlet and shall be of single width type. For design purpose outdoor temp. shall be taken as
50 deg.C.
The fans shall be of robust construction. The thickness of the casing and impeller shall be as given
below:
Casing – 8 mm.
Inlet box – 6 mm.
Blades – 8 mm (min.).
Page 18 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
Fan should be designed for adequate duty keeping a margin in approximately 15% on pressure
ratings. Operating speed of the centrifugal fan shall not preferably be more than 1500 rpm and
velocity of outlet shall not exceed 15 m/sec.
The following materials shall be used for the construction of various parts:
Page 19 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
The bearing make shall be of SKF / FAG / TIMKEN. The supplier shall provide authenticity
certificate for genuineness of bearings. Spurious bearings shall be rejected.
Bearings shall be provided with suitable lubrication system with adequate cooling
arrangement to maintain the bearing & lubricant temperature within permissible limits.
Grease lubrication system shall be preferred. For oil lubrication system, maximum
permissible oil temperature during operating condition shall be limited to 90 deg.C / 40 deg.C
above ambient temperature. Drain plug shall be provided in bearing housing.
8.06.01 GENERAL
Not more than 8 dust sources shall be connected to a single dust filter.
The maximum air to cloth ratio shall be 1.15:1 / air permeability shall be 1.15 m3/m2/min
for general de-dusting.
Pulse jet type bag filter shall be provided with suitably reinforced bag/man-catcher screens.
8.06.02 BAGS
Filter cloth for dry gas application up to 135 °C: Needle felt made of high quality Polyester
fibres (for air and alumina dust).
For standardization of bags (e.g., diameter of 140/160 mm) most filters shall be matched in
such a way that only one size (i.e. diameter, length) and filter bag type is used for similar
applications.
Maximum number of bags per row: 16 bags
Bag cages shall be provided with longitudinal wires:
To 12 for filter cloth diameter < 160 mm.
Bag cages shall be of single piece design and shall be corrosion-resistant
(galvanized, stainless steel or epoxy coated), depending on application.
Page 20 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
Inclined vent ducts for up and downwards dust-laden air flow shall have an
inclination of at least 60 degrees measured from horizontal.
A conveying velocity of 18-25 m/Sec shall be maintained at all points in the
ductwork between dust collection hood and dust collection plant to ensure flow of
air without settling of dust. Hinged cleaning hatches shall be provided on the
ducting near the bends & interconnection of ducts. Measuring ports shall be
provided on the ducting near each suction point and on ducting before & after the
centrifugal fan to measure the flow rate and pressure. Platform with ladder shall be
provided for approach to cleaning hatches & measuring ports.
8.07 AIRLOCKS
RAL casing should be casting of IS 4896 Grade II.
Spring loaded tips to be provided on rotor vanes for continuous sealing.
Tip blade shall be of replaceable and adjustable type.
RAL size : min. 300 x 300 mm
RAL speed not more than 20 rpm.
Motor shall be suitable for 100% filling of RAL at compact density. Minimum 1.1 kW /
1500 rpm motor to be considered.
Rope winch system for wagon hauling shall be as per vendor’s standards.
Page 21 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
Stack height for Dust collector system shall be as per latest pollution control norms.
Motor name plate rating at 50ºC shall have at least 15% margin over the input power
requirement of the driven equipment at duty point except for package type screw compressor
where service factor motor are used as per manufacturers standard.
The system shall be capable of operating continuously round the clock throughout the
year. The installation must be designed so that it can always be serviced without having a
complete shutdown.
Alumina unloading and transportation system shall be laid out and constructed for
convenience and safety of operation and maintenance. All equipment shall be oriented to
permit servicing in such a way as to require a minimum of dismantling.
All equipment and materials (mechanical, piping, electrical, instrumentation, controls,
civil, architectural etc) shall be sourced from manufacturers acceptable to DCPL and
NALCO.
All electrical installations including the hoists in open area shall be provided with rain
protection hood.
Maintenance platforms/access walkways shall be provided at one end beam for each
electric monorail hoist.
All the equipment shall be field proven for such an operation taking into consideration
normal preventive and running maintenance of the unit and their auxiliaries.
All equipment, controls and structure shall be designed for installation in carbon and
alumina dust charged atmosphere of aluminium smelter area and seismic condition of
site.
All equipment shall be proven design. Prototypes or extensive modifications of the basic
designs are unacceptable.
The installation shall be designed with adequate facilities for maintenance & operations.
The design, fabrication, painting, supplies and testing shall conform to relevant
international codes and standards, Indian codes and standards, wherever applicable, shall
take precedence over those of other nationalities. Only latest editions including addenda
shall be referred to.
Design, fabrication & operation of the plant shall be based on the following:
a) Indian factory act
b) Indian explosive act
c) Petroleum & Carbide of calcium manual
d) Fire protection manual of fire sectional committee, Insurance Association Of India
e) Regulations laid down by explosive directorate and electrical inspectorate
f) Regulations of Director general of civil aviation for all stacks
Page 22 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
Page 23 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
The outdoor electrical /Instrumentation installations like local cabinet of motors and other
instruments shall be provided with rain protection shed.
Total system lighting arrangement shall be preferably 70 Watts HPSV (High Pressure
Sodium Vapour) with glass fitting.
Pull chord/Belt sway switches and other switches as mentioned in P&ID shall be
provided considering system tripping.
In the control room there shall be Audible buzzer and Indication light during Alarm/Trip
of the any equipment /system.
Elbow installed on alumina pipes must be designed to resist abrasion. The inside pipe
shall be lined with an abrasion proof medium. Elbow radius must not be less than 1
meter.
The fluidization cloth for air slide shall be of fabric quality from reputed vendor.
Pressurized ventilation system shall be provided in the blower room.
Pipe conveyor
Equipment Number : PC-100/200/300
Capacity : 1000 TPH
Accuracy : ± 5%
Air slides
Equipment Number : AS-100/200
Average Capacity : 480 TPH
Design Capacity : 500 TPH
Air slides
Equipment Number : AS-300/400/401/500/501
Design Capacity : 1000 TPH
Dust Emission
Equipment Number : DC-100/200/300/400
Type : Bag Filter type
Location : As per site condition
Function : Filter the air loaded with alumina dust
before venting it to the atmosphere.
Dust Load : Approx. 25 gms/Nm³
Dust Emission to : 10 mg / Nm3 (desirable)
atmosphere
Page 24 of 25
DESIGN BASIS REPORT Alumina Unloading and
PROCESS & MECHANICAL Transportation System
DOC. NO. 14L08-000-DBR-M-001
One make up water line (existing 200-WT-35-2305-A34) will be tapped from existing line at
the Co-ordinate N= (-) 1153.28M, E = (-) 2581.83M
8” Fire Hydrant (U /G Line) shall be available from existing line at the co-ordinate
N= (-) 939.874M, E = (-) 2343.605M
8” / 12” compressed air line shall be tapped from the existing line at the co-ordinate
N= (-) 1258.68M, E = (-) 2581.83M
The compressed air line for bag filters near silo-6 and silo-2 shall be tapped from the nearest
existing compressed air line.
Drinking water supply line for proposed shall be tapped from existing system near RP area.
Page 25 of 25