(Note: Bidder shall submit duly signed and stamped copy of this Amendment with enclosures along with their offer.)
The terms, conditions and specifications of Bidding Document stand modified to the extent indicated under column MODIFICATIONS/ADDITION/
DELETION”. Corresponding implications of the same, elsewhere in the tender document shall be taken care appropriately. All other terms & conditions,
stipulations and specifications of bidding document shall remain unaltered.
S. PAGE CLAUSE
DOC. NO. / VOL. NO. SUBJECT MODIFICATIONS/ADDITIONS/DELETION
NO. NO. NO.
Technical Compliance MODIFICATION:
format for raw bamboo Revised Technical compliance format for raw bamboo handling
11 to 15 Entire
1. handling package (doc. Revised document package (Rev 1) is attached with the amendment, the same shall be
of 1815 Document
no. B215-000-80-43-TC- considered by bidder for bidding purpose.
4505)
MODIFICATION:
Scope of Work/Supply-
Revised Scope of Work/Supply – Static & Machinery Equipment for raw
Static & Machinery
18 to 25 Entire bamboo handling package (Rev 2) is attached with the amendment,
2. Equipment (doc. no. Revised document
of 1815 Document The same shall be considered by bidder for biding purpose.
B215-000-80-43-SOW-
4505)
Schematic layout for raw MODIFICATION:
bamboo handling 65 of Entire Revised Schematic layout for raw bamboo handling package (Rev D) is
3. Revised document
package (doc. no. B215- 1815 Document attached with the amendment, The same shall be considered by bidder
000-80-43-0001) for bidding purpose.
MODIFICATION:
Overall Plot plan (doc. no. 67 of Entire Revised Overall Plot Plan (Rev D) is attached with the amendment, The
4. Revised document
B215-000-17-44-0001) 1815 Document same shall be considered by bidder for biding purpose.
MODIFICATION:
Job Specification- Static &
69 to Revised Job Specification – Static & Machinery Equipment for raw
Machinery Equipment Entire
5. 155 of Revised document bamboo handling package (Rev 2) is attached with the amendment,
(doc. no. B215-000-80- Document
1815 The same shall be considered by bidder for biding purpose.
43-SP-4505)
DOCUMENT No.
TECHNICAL AMENDMENT NO.1
TO B215-000-80-43-TA-4505-1
NAME OF WORK : RAW BAMBOO HANDLING SYSTEM Rev. 0
BIDDING DOCUMENT NO. : B215-000-80-43-PM-T-4505 Page 3 of 3
DEPARTMENT NAME : STATIC & MACHINERY EQUIPMENT 2
S. PAGE CLAUSE
DOC. NO. / VOL. NO. SUBJECT MODIFICATIONS/ADDITIONS/DELETION
NO. NO. NO.
Datasheet for raw MODIFICATION:
653 to
bamboo handling Entire Revised Datasheet for raw bamboo handling package (Rev 2) is
6. 664 of Revised document
package (doc. no. B215- Document attached with the amendment, The same shall be considered by Bidder
1815
000-80-43-DS-4505) for Biding Purpose.
MODIFICATION:
830 to
Vendor list (doc. no. Entire Revised sub-vendor list for raw bamboo handling package (Rev B) is
7. 906 of Revised document
B215-000-86-41-VL-4505) Document attached with the amendment, The same shall be considered by Bidder
1815
for Biding Purpose.
Utility data for raw ADDITION:
bamboo handling 1816 to Entire Utility data for raw bamboo handling package (Rev 0) is attached with
8. New document
package (doc. no. B215- 1819 Document the amendment, the same shall be considered by Bidder for Biding
79-41-BHP-1001) Purpose.
Enclosure:
1.1 Bidder shall indicate his reply in the space provided in the following format. In case space
provided is not adequate, the reply may be furnished separately under suitably numbered
annexes / attachments duly referred against the comment / query.
1.2 The Compliance Statements / Queries are required to be categorically confirmed / answered
by the Bidder and the completely filled in Technical Compliance Format shall be submitted
together with the Bid.
Annexure-1
FORMAT FOR LETTER OF WAIVER
Annexure-2
Utility Consumption Data *
2 30/05/2019 REVISED & ISSUED WITH TECHNICAL AMENDMENT VMG SM/PD KJH
1.1 GENERAL
1.1.1 The equipment/system supplied shall be complete in every respect, ready for operation. It is
not intent of purchaser to specify every piece of equipment / item, therefore any item not
specifically mentioned in this specification but required as per good engineering practice and
safe and trouble free operation of the system shall be deemed to have been specified by the
purchaser and shall be included in Contractor’s scope of work/supply. Contractor to note
that this is a “Zero deviation” bid. Hence any deviation, what so ever, to the tender
specification is not acceptable. Any exclusion or deviation or ambiguity in the scope
of supply and/or work shall be submitted for clarifications during pre-bid meeting. For
any such discrepancy or deviation identified after award of work, purchaser’s decision
shall be final and binding on the contractor without any price and/or time implications.
1.1.2 Any item / component / facility not specifically mentioned but required as per good
engineering practice within package battery limit for safe, continuous, trouble free operation
of the plant is deemed to have been specified and shall be included in the scope of
Contractor, without any commercial implication to Owner.
1.1.3 Contractor to consider and include site visit (s), as required, to make themselves fully
aware of the space available for raw bamboo handling package and ensure complete
feasibility of the scheme before submission of technical offer as no price implication
whatsoever shall be entertained after award of Contract. Attached layout / scheme is
preliminary in nature and for guidance purpose only, Contractor shall develop layout
/ scheme considering all facilities required making the system complete and
operational.
1.1.4 All the items / packages / facilities shall comply with applicable national and international
codes & standards as well as any statutory regulation in existence particularly for that
items/package/facility.
1.1.5 Before award of job “Contractor” implies “Bidder”.
Sl.
ITEM DESCRIPTION TAG NO. CAPACITY QTY.
No.
Belt Conveyor to Chip Silo 0105-CB-0013 65 TPH (250 l-m3/hr) 1 No.
Belt Conveyor to Process
NOTE: This conveyor (0105-CB-
0014) shall be equipped with VFD 60-175 TPH (300-
for speed control and the set point 0105-CB-0014 1 No.
700 l-m3/hr)
for speed control will come from the
down-stream digester package (by
others).
2.0 Bamboo Chipper complete with
feeding roller system.
NOTE: The size of chips produced 0105-SH-0002/0003 73 TPH 2 Nos.
shall be up to 25 mm (maximum
dimension).
3.0 Chip receiving pocket. 0105-TH-0001 50 m3 1 No.
Discharge screw system for the chip
receiving pocket.
NOTE: The Number of screws may
vary based on contractor’s design. - 73 TPH 1 No.
However, the overall capacity of the
discharge screw/s shall be as
mentioned
4.0 Scalper screen (Disc type)
Complete with the drive system and
0105-SS-0001 73 TPH 1 No.
chute arrangement to route the
rejects to grade.
5.0 Reversible shuttle belt conveyor. 0105-CB-0007 73 TPH 1 No.
6.0 Chip storage area.
NOTE: The storage area shall be - ~ 26400 l-m3 1 No.
covered and shall be of approx.
length 90 m and width 50 m.
7.0 Screw Reclaimers placed below the
chip storage.
NOTE: These screw conveyors
shall be equipped with VFD for 0105-CS-0002/0003 65 TPH 2 Nos.
speed control and the set point for
screw control will come from the
level of the chip feeding silo 0105-
TI-0001.
8.0 Stone separator conveyor
NOTE: This shall be a belt conveyor 0105-CB-0010 65 TPH 1 No.
with adjustable rising angle.
9.0 Cross belt overband magnetic
separator (to be installed on the
0105-SM-0001 - 1 No.
stone separator conveyor 0105-CB-
0010).
10.0 Metal Detector (to be installed on
the stone separator conveyor 0105-
- - 1 No.
CB-0010, after the magnetic
separator 0105-SM-0001).
Sl.
ITEM DESCRIPTION TAG NO. CAPACITY QTY.
No.
11.0 Chip screen with two screen decks
to separate fines and oversize form 0105-SS-0002 65 TPH 1 No.
the feed.
12.0 Shredder to size the oversized
0105-SH-0001 5 TPH 1 No.
material/chips.
13.0 Electronic belt scales on conveyors To suit the
(0105-CB-0005, 0105-CB-0013 & - respective belt 3 Nos.
0105-CB-0014). conveyor capacity
14.0 Chip silo of design capacity 500 m3
receives accepted bamboo chips
through Belt Conveyor 0105-CB-
0013, at the top and have a flat
bottom construction. Also, the silo
would be equipped with a slewing
screw conveyor 0105-CS-0001 at
500 m3
the bottom to reclaim the chips from 0105-TI-0001 1 No.
(useful volume)
the silo. MOC of Chip Silo shall be
SS.
NOTE: Vendor shall propose their
Chip Silo design to meet the slewing
Screw conveyor requirement at the
bottom for downstream flow rate of
(60 - 175 TPH) etc.
15.0 Slewing screw conveyor / reclaimer
below the Chip Silo 0105-TI-0001.
NOTE: This shall be a screw
conveyor equipped with VFD for 60-175 TPH (300-
0105-CS-0001 1 No.
speed control and the set point for 700 l-m3/hr)
screw control will come from the
down-stream digester package (by
others).
16.0 Chutes(s), as applicable - - Lot
17.0 Bins for collecting the reject from the
Scalper screen, stone separator
conveyor, Magnetic separator,
Metal detector, chip screen, etc., for - - Lot
collecting the oversize & fines from
the chip screen and wherever
required.
18.0 Dust suppression system with Dust
Settling Pot. This is to suppress the
2 dust generated in chip storage area.
around Bamboo Chippers 1 & 2 Lot
- -
(0105-SH-0002/ 0003), chip scalper 5 Nos.
screen house, chip storage,
bamboo feed handling shed and
belt conveyor (0105-CB-0012).
19.0 Turbo Ventilator for ventilation of
Chip Storage Area maintaining 10 - - Lot
ACPH.
20.0 Forced ventilation system complete
- - Lot
with fans, filters, duct work etc. for
Sl.
ITEM DESCRIPTION TAG NO. CAPACITY QTY.
No.
ventilations of conveyor pit below
chip storage.
21.0 Material handling facilities viz.
electric wire rope hoist, chain pulley
blocks etc. complete with respective
geared trolleys, monorails etc.
NOTE: Type, quantity and capacity
shall be decided during detailed
engineering based on Material
handling facilities study that shall be By Contractor Lot
carried out by Contractor during
detailed engineering stage based
on the selected equipment size &
weight and guideline of Engineering
Design Basis (Packaged
Equipment) and it shall be approved
by ABRPL/EIL.
22.0 Conveyors with cleaning and drying
system, water sprinkler and
associated system to recycle the
water, forced drying arrangement
with continuous air circulation, drive
arrangement, pulley arrangement,
idlers, take-up arrangement etc., for
conveying of raw bamboo received
from mobile loading equipment.
0105-CB-
Conveyor to Chipper-1 / 2 73 TPH 2 Nos.
0001A/0002A
23.0 Transfer Towers (TT1) covered all TT1 - 1 No.
around with side sheeting.
24.0 Take-up Tower(s), as applicable - - Lot
25.0 Online moisture analyzers on
conveyor (0105-CB-0005 & 0105- - - 2 nos.
CB-0014).
26.0 De-dusting system at all transfer
points and dust generation points
consisting of reverse pulse jet type
bag filter, centrifugal fan, exhaust
duct/stack etc. This is required to
maintain clean dust free
environment around the dust
2 generating areas such as Chipper
house 1 & 2, Chip Scalper screen
- - Lot
house, Oversized chip shredder
machine, Bamboo feed handling
shed, transfer towers, chip silo
(0105-TI-0001), all transfer points
etc. Dust collected in bag filters shall
be transferred to consecutive belt
conveyor of the conveying system.
Additionally there shall be provision
to bring down dust from outlet of all
Sl.
ITEM DESCRIPTION TAG NO. CAPACITY QTY.
No.
dust collection points (such as bag
filters etc.) to ground level and
terminate in closed containers kept
at ground level. Supply of gravity
piping along with necessary closed
containers shall also be in
2
Contractor’s scope.
Additionally following items shall also be considered in the scope of supply of Vendor.
1.2.2 Maintenance platform wherever required, complete with ladder, hand rails etc.
1.2.3 Base Plates/base frames for all equipment including drive unit along with other
appurtenances.
1.2.4 All fixing bolts, nuts & washers as required.
1.2.5 All vibration isolation pads (as applicable) for fixing the drive unit.
1.2.6 First fill of oils, lubricants, chemicals & hydraulic oil (if applicable) and other consumables
and replenishment of any loss of these during erection and commissioning.
1.2.7 Hose stations for Plant Air and Service water in all the buildings / sheds and wherever
required.
1.2.8 Complete Electrical / Instrumentation / Structural / Architecture items and works including
superstructures for the package as per respective specifications.
1.2.9 Painting of all equipment and items as per painting specification attached elsewhere in the
Tender document, suitable for corrosive industrial environment, including final coat in shop
& supply of paint for touch up at site of any damage to paint during transportation & site
installation.
1.2.10 Special tools & tackles, if any (Price to be included in the base price). Special tools and
tackles shall include the following as minimum, over and above Contractor’s
recommendations:
One No. belt vulcaniser suitable for all type of belts provided,
One No. mobile trolley mounted belt changing device suitable for all type of belts
provided.
One no. blade sharpening unit suitable for sharpening Drum chipper blades, shredding
2
machine blades etc.
1.2.11 Mandatory Spares as mentioned below (Price to be included in the base price).
Bamboo Chippers: One (1) complete set of Knives/Blades including fixtures for each
chipper.
Conveyors:
Idler rollers: 5 % (Minimum 10 numbers) of each type and size.
Conveyor Pulley: One (1) number of each type & size.
Bearing & Sleeves: Two (2) numbers of each type & size.
Plummer Block: Two (2) numbers of each type & size.
Electrical / Instrumentation / Structural and other Mandatory spares: As per respective
specifications.
1.2.12 Commissioning spares, as required (Price to be included in the base price). Any and all
spares required during commissioning, over & above quoted spares, shall also be supplied
by Vendor without any time & price implication.
1.2.13 Quotation for recommended spares for two years’ normal operation and maintenance for
complete package including those required for electrical and instrumentation. Itemized price
list to be submitted along with the bid. Owner shall order these spares separately at Owner’s
discretion. The quotation for Two Year spares shall include the following as minimum, over
and above Contractor’s recommendations
5 % Idler rollers of each type and size.
Conveyor pulleys of all types & sizes
HPU filters
2 Sets of Belt repairing kit
Bearings & Sleeves for each types & sizes
1.2.14 Drawings, documents, specification, inspection & test reports, performance test procedures
etc. as defined in document no. B215-000-80-43-VDR-4505.
1.2.15 Any other item not specifically mentioned but required for safe and efficient operation of the
equipment.
Contractor. Training shall include 2 batches of 5 persons in each batch for 5 days per
batch. The training program shall comprise of classroom training and explanation of
details of equipment at site. Also refer Instrumentation Specification for Training of
Package PLC of this plant.
xvi) All statutory clearances and permits from local, statutory and other bodies for the package
/ system, as required/applicable shall be as per GCC/SCC.
2
xvii) Handing over the plant to Owner as per EIL /Owner satisfaction.
1.3.2 Contractor shall provide separate quotation for comprehensive post warranty AMC for
package PLC for first five (5) years of operation and maintenance services (including
all spares as required) for entire Raw Bamboo Handling Package after commissioning
and the same shall be considered for Commercial comparison. Owner shall order this
service separately at Owner’s discretion.
1.3.3 Contractor shall provide separate quotation for comprehensive per month charges for
first six (6) months operation and maintenance services (including all spares &
consumables as required) for entire Raw Bamboo Handling Package after
commissioning and the same shall be considered for Commercial comparison. Owner
shall order this service separately at Owner’s discretion.
1.3.4 3D Modelling of the complete Raw bamboo handling package as per piping
specification attached elsewhere with this tender.(Contractor shall provide separate
quotation for the same, however the cost shall be added to the total cost for
commercial comparison purpose).
2.0 EXCLUSIONS
2.1 Site Grading and Piling Works. However layout, foundation details and load data as required,
for arranging the piling works shall be furnished by the Contractor.
2.2 Mobile loading equipment for raw bamboo and bamboo chips. However Contractor shall
furnish the Quantity, Capacity and other details for such mobile loading equipment, for
arranging the same by Owner.
2.3 Control Room and Substation Building
2.4 All civil foundations. However Contractor shall furnish GA drawings, load data, Base plate,
bolt details etc. within 3 weeks from LOI for design of Foundation & Superstructure (RCC
works) by others. Also refer Structural Scope of Work Doc. No. B215-000-81-41-SOW-4505
attached with this Tender.
2.5 Supply of utilities.
2.6 Fire fighting system network. However, the fire fighting facilities such as piping, sprinklers
etc. to be installed in the Contractor’s supplied equipment/facilities, shall be supported from
Contractor’s supplied structure/facilities. Details of fire fighting facilities would be shared with
the contractor, during detailed engineering. Accordingly, the structures should be adequately
2 designed to take care of the additional loads of the fire fighting facilities without any time and
cost implications to Owner.
3.0 UTILITIES
3.1 Utility connections for Plant air, Service water, Instrument Air are envisaged. If any other
utility is/are required, Contractor shall indicate the same during pre-bid stage.
2
3.2 All the utility lines shall be made available at single point near plant pipe rack. Further
distribution (engineering, procurement, fabrication, erection etc.) up to various users’ location
from the battery limit point, including incorporation of any conversion equipment / facilities as
required, shall be in the scope of the Contractor.
4.0 ABBREVATIONS
ABRPL : Assam Bio Refinery Project Ltd. (Client/Owner)
ACPH : Air Changes per Hour
EIL : Engineers India Ltd. (Consultant)
l-m3 : Loose-Meter3
MOC : Material of Construction
PFD : Process Flow Diagram
SS : Stainless Steel
TPH : Tons per Hour
VFD : Variable Frequency Drive
2 AMC : Annual Maintenance contract
5.0 REFERENCE
This Scope of Work Document shall be read in conjunction with the following documents
along with other document/drawings that are attached or referred in the Tender Document.
a. Job Specification (Static & Machinery Equipment) - Doc. No. B215-000-80-43-SP-4505.
b. Process Flow Diagram of Raw Bamboo Handling Package - Drg. No. 101006030-02021.
c. P&ID of Raw Bamboo Handling Package (Drg. No. 101006030-02101/02102/02103)
d. Layout of Raw Bamboo Handling Package - Drg. No. B215-000-80-43-00001.
e. Engineering Design Basis Packaged Equipment - Doc. No. B215-999-80-43-EDB-1002
f. Scope of Work (Electrical)- Doc. No. B215-000-16-50-SOW-4505
g. Scope of Work (Instrumentation) - Doc. No. B215-000-16-51-SOW-4505
h. Scope of Work (Structure) - Doc. No. B215-000-81-41-SOW-4505
2
i. Job Specification for 3D modelling – Doc. no. B215-000-16-43-SP-0001
2420
2450
2480
2510
2570
1910
1940
1970
2000
2540
2030
2060
2090
2120
2150
2360
2390
2180
2210
2240
2270
2300
2330
E
E
E
E
E
E
E
ABA 1580
RI N
RO
AD
1550
N
R A I L L I N E
6.0
1490
N
1460
N
1430
N
E X I S T I N G
1400
N
1370
CONSTRUCTION YARD N
1340
N
1310 1310
0
N N
2.
6.0
1280 1280
N N
6.0
6.0
1250 1250
N 74.9 N
30.0
0
6.
10.0
166.4
43.8
1220 1220
N 22.2 N
60.2
152.6
1190 1190
N N
9.0
53.0 34.0
97.0
1160 1160
N N
1910
1940
1970
2000
2030
2060
E
2.0
60.0
112.7
112.0
104.0
5.0
97.0
9.0
9.01130
N
1130
N
5.0
270.0
37.0
1100 1100
N 50.0 N
2570
0
9.
E
5 9.0
5.
15.0
14.7 10.0
9.0
1070 1070 1100
7.0
9.0
7.0
N N N
14.0
4.0
CL RCC RECTANGULAR DRAIN PROPOSED ON EXISTING TRAPEZOIDAL DRAIN (NOTE 9)
C OF ROAD (INSIDE NRL REFINERY) 1055
N
21.5
5.5
35.5 0
2.
8.0
17.0
131.0
7.0
18.0
40.0
18.0
18.0
166.0
90.0
30.0
15.0
94.5
2420
2450
2480
2510
2540
2570
2090
2120
2150
2180
2210
2240
2270
2300
2330
2360
2390
E
E
E
Doc. no.
JOB SPECIFICATION
(STATIC & MACHINERY EQUIPMENT) B215-000-80-43-SP-4505
RAW BAMBOO HANDLING PACKAGE Rev.2
Page 1 of 29
JOB SPECIFICATION
(STATIC & MACHINERY
EQUIPMENT)
2 30/05/2019 REVISED & ISSUED WITH TECHNICAL AMENDMENT VMG SM/PD KJH
SASWATA
1 04/02/2019 REVISED & REISSUED FOR BIDS VMG KJH
/PD
SASWATA
0 10/12/2018 ISSUED FOR BIDS VMG KJH
/PD
Rev. Prepared Checked Approved
Date Purpose
No by by by
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
Doc. no.
JOB SPECIFICATION
(STATIC & MACHINERY EQUIPMENT) B215-000-80-43-SP-4505
RAW BAMBOO HANDLING PACKAGE Rev.2
Page 2 of 29
1.1 Specific requirements and guidelines pertaining to individual equipment and system are
listed in subsequent sections. However, the following general considerations have to be
kept in view for all items while formulating their specifications and procurement engineering
activities:
1.1.1 Reliability in service (assessed from Contractors’ relevant track record and improved by
incorporating certain minimum design features or requirements in the specifications).
1.1.2 Compliance with applicable national or international codes and standards as well as any
statutory regulation in existence for a specific item.
1.1.3 Ease of operation and maintenance including any necessary measures for ensuring
safety of personnel and equipment as well as a conducive working environment.
1.1.4 Standardization of components, wherever feasible.
1.1.5 Adherence to any limitations of space available for the equipment and its operation /
maintenance.
1.1.6 Equipment shall be designed for the given site condition.
1.1.7 Electrical, Instrumentation and controls wherever applicable for the equipment and
packages shall be engineered as per the respective sections, described in the Tender
Document.
1.2 Specifications forming a part of the Tender Document indicate a minimum standard of
quality for materials, fabrication and/or erection of the proposed equipment. Responsibility
for complete compliance to these specifications shall rest with the Contractor. It will be
Contractor’s responsibility to obtain clarification from Owner’s representative, wherever
necessary, which in all cases shall be final and binding.
1.3 All equipment and materials supplied or installed under these specifications shall be
installed in accordance with sound engineering principles and good fabrication and
construction practice (No omission from these specifications shall relieve the Contractor
from his responsibility).
1.4 All equipment and materials fabricated and installed under these specifications shall
conform to the latest editions of the applicable codes and standards cited in the bid
documents. No omission in the project instructions shall be construed as relieving the
Contractor of his responsibility to ascertain these requirements, to perform work and furnish
material in accordance with the codes specified.
1.5 Contractor shall develop technical specification of equipment taking into consideration the
requirements defined in specifications, data sheets and the requirements attached with bid
package.
1.6 Equipment shall be complete in all respects and any item or feature not covered in the
specification but essential for proper operation shall be included by the Contractor. Also
the plant shall conform in all respects to high standards of engineering design, state of art
technology, and reliability in continuous operation.
1.7 Painting shall comply to the requirement as per specification attached with the bid package.
1.8.1 The equipment and facilities shall be designed to meet the requirements as specified in the
Documents / Drawings enclosed or referred in the Tender for Raw Bamboo Handling
Package. In the event of any conflict noticed by the Contractor, the same shall be brought
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
Doc. no.
JOB SPECIFICATION
(STATIC & MACHINERY EQUIPMENT) B215-000-80-43-SP-4505
RAW BAMBOO HANDLING PACKAGE Rev.2
Page 3 of 29
out during Pre bid Meeting for clarification. For any such discrepancy or deviation identified
after award of work, purchaser’s decision shall be final and binding on the contractor without
any price and/or time implications. The Schematic Layout Drawing (Drg. No. B215-000-80-
43-0001) showing Raw Bamboo Handling Package area and the tentative location of the
facilities like chippers, screens, conveyors, chip storage, silo etc. is attached with this
Tender.
1.8.2 Based on this Schematic layout drawing, contractor shall develop detailed layout drawing of
items in contractor’s scope specifying the outline dimensions including the position of major
facilities under the scope of this requisition along with the bid. Contractor shall also furnish
details of all interface point/battery limit locations during detail engineering.
1.8.3 All the equipment shall be field proven for such an application taking into consideration
normal preventive and running maintenance of the unit and their auxiliaries.
1.8.4 Equipment, electrical and instrumentation related to Raw Bamboo Handling package shall
be suitable to withstand the condition to be encountered, like the abrasiveness of bamboo,
logs & chips and the presence of bamboo dust and foreign material that may be carried
along the raw material such as soil, sand etc.
1.8.5 For drive unit of equipment, shafts shall be driven directly by motor, reducers via a coupling.
Gear mechanism shall be housed in a seal tight casing with oil bath lubrication.
1.8.6 All equipment shall be of proven design. Prototypes or extensive modifications of the basic
designs are unacceptable.
1.8.7 The installation shall be designed with adequate facilities for maintenance and operations.
1.8.8 All equipment/packages shall be sourced from vendors as per Master Vendor list (attached
with the tender). Contractor shall procure equipment from Master Vendor list (attached with
the bid package) within the range specified as per approved enlistment with EIL. Any
additional vendors if proposed by Contractor for any item(s) where no list is provided in the
2
Master Vendor List, the makes/sub vendor of same shall have sufficient Proven Track
Record (PTR) and shall be subject to Client / EIL approval during detail engineering without
any time and price implication to Owner.
1.8.9 Plant shall be laid out and constructed for convenience and safety of operation and
maintenance. All equipment shall be oriented to permit servicing in such a way as to require
a minimum of dismantling.
media. All phases of the process and mechanical design of the facility must be thoroughly
checked to assure that unsatisfactory conditions such as plugging, and/or undesirable
chemical reactions will not occur.
1.9.4 Selection of material for each component of equipment shall be based on the design
pressure, temperature and other conditions of operation and in no case shall be inferior to
the material indicated in the Tender Document.
1.10.1 Layout shall be prepared taking into consideration various factors like requirement of
operability, approach, safety, withdrawal space requirement, maintenance, foundation
requirements etc. for convenient operation.
1.10.2 The facility shall be laid out and constructed for convenience and safety of operation and
maintenance. Similar equipment shall be grouped together as much as possible so as to
best conform to good engineering practice and fulfill accepted standards of process
simplicity, safety, and economy. All equipment shall be oriented to permit servicing in such
a way as to require a minimum of dismantling. In the case, conservation of space shall also
be taken into account.
1.10.3 Contractor shall provide adequate design measures to handle all predictable occurrences
resulting from weather, process upsets, or operational failures, or interruption of utilities. All
such features shall be provided unless exceptions are brought to Owner’s attention and a
specific agreement is reached to forego such measures.
1.10.4 The skid shall be designed and built to ensure that all the equipment along with
accessories, panel and piping are mounted suitably for convenient operation.
1.11 Safety
1.11.1 It is the intent of the Owner that operational hazards be reduced to a minimum. Contractor
shall use sound engineering judgment to complete an installation that will perform the
required function without compromising this aim.
1.11.2 All electrical devices shall meet the requirements for the area classification in which they
are installed.
1.11.3 All controls shall operate in a fail-safe mode.
1.11.4 Piping shall be arranged in a manner so as to avoid tripping or headroom problems. Piping
or tubing of insufficient mechanical strength for standing or hanging shall be protected from
personnel traffic.
1.11.5 All safety requirements and other safety regulations shall be complied with.
1.11.6 Factor of safety to be considered at all levels, i.e. design, installation and operation as per
standard requirement of OSHA, NEMA, IEC, etc.
1.11.7 Noise and vibration shall be minimized. Noise level of the running equipment shall not
exceed 85dBA at 1m distance from source.
2.1 The main codes and standards applicable for equipment or system are indicated in the
respective standard specification.
2.2 The list of applicable EIL standard specifications is as given below. Contractor shall refer
the applicable standard specifications and codes (latest version) referred therein for the
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
Doc. no.
JOB SPECIFICATION
(STATIC & MACHINERY EQUIPMENT) B215-000-80-43-SP-4505
RAW BAMBOO HANDLING PACKAGE Rev.2
Page 5 of 29
item or system and make part of respective equipment specification in compliance with all
such standards
Doc. No. Standard Specification for
6-22-0001 Vibrating Screen
6-36-0002 Ventilation / Pressurisation System
6-47-0001 Belt conveyors
6-47-0002 Screw conveyor
6-61-0014 Electric Wire Rope Hoist
6-61-0015 Chain Pulley Block
6-78-0001 Quality management system requirements from Bidders
6-78-0002 Documentation requirement from contractors
6-78-0003 Documentation requirement from suppliers
7-76-0103 Instructions to Vendor for Site Performance Guarantee Requirements for
Package Units
6-23-0001 Dust Collection system: Bag filter type
6-33-0005 Rotary Valve/ Feeder
2 6-47-0002 Screw conveyor
6-42-0002 Centrifugal Fans
3.1 General
3.1.1 Raw bamboo handling package shall consist of raw bamboo log receiving and handling;
chipping, storage and feeding of chipped bamboo to fractionation process. The raw
bamboo arrives to the bio-refinery in trucks / rail wagons in three forms: round, flattened
and chipped. In all the cases they are coming to the same handling area.
3.1.2 Conveying system shall be capable to transfer the material at the design rate (as
mentioned in the Scope of Work Doc. No. B215-000-80-43-SOW-4505) from Bamboo
receipt up to Chip Silo and further to downstream fractionation section.
3.1.3 Tentative arrangement of the equipment / system associated with raw bamboo handling
package, is indicated in the Overall Layout of Raw Bamboo Handling Package (Drg. No.
B215-000-80-43-00001). The system shall be designed to receive the raw materials at
grade level and to transfer the same to the downstream digester package (Digester
package by others) at about 30 m above the Grade.
3.1.4 Electronic belt scales shall be provided on belt conveyors 0105-CB-0005, 0105-CB-0013 &
0105-CB-0014.
3.1.5 Maintenance facilities viz. electric wire rope hoist, chain pulley blocks etc. complete with
accessories and associated facilities such as Geared trolley, monorail beam etc. shall be
supplied wherever required for maintenance of Contractor’s supplied equipment.
3.1.6 Each shed shall have one no. floor cleaning chute connecting all floors.
3.1.7 Dust collection system shall be provided as per details below:
3.1.7.1 Dry Fog type Dust Suppression System shall be provided at following location to control
dust generation.
2 Chipper house 1 & 2
Chip Scalper Screen house
Bamboo Chip Storage
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
Doc. no.
JOB SPECIFICATION
(STATIC & MACHINERY EQUIPMENT) B215-000-80-43-SP-4505
RAW BAMBOO HANDLING PACKAGE Rev.2
Page 6 of 29
3.2.1 The characteristics / properties of the raw material received at site are as given below:
Material handled Round Bamboo / Bamboo Chips
Length of round bamboo 7 feet (2.1m)
Diameter of round bamboo 3 – 4 inch
Solid Density of round bamboo ~400
(kg/m3)
Chip Size (at the Chip receiving Max. 25 mm
pocket)
Bulk Density (kg/m3) of chips to 200 (for volumetric design) / 250 (for structural /
be considered for system design mechanical design and drive sizing)
Temperature Ambient
Moisture,% <20 (15% has been considered)
Pentosans >21 % on dry matter
Ash <4 % on DM
Acetic acid as acetyl group > 3.7 % on DM
Chip Size (at the Chip receiving Max. 25 mm
pocket)
Angle of Repose of Chip, degree ~30
Angle of Surcharge of Chips, ~25
degree
Chipping capacity is based on working form 2/7 where chipping is working seven days per
week and two 8 hour shifts per day.
3.3.7 Chipper 0105-SH-0002 (0105-SH-0003) is drum type with adequate number of knives. In-
feed system push the bamboo bundle against the cylinder and knives cut the bamboo logs
into the certain length of chips. Chipper shall be designed to produce chips of 25 mm
dimension. A f t e r cutting chips are led to the belt conveyor 0105- CB-0006.
3.4 Chip receiving and handling
3.4.1 Raw material (bamboo) will be received as chips. Chips transported by trucks are fed
directly to the chip receiving pocket 0105-TH-0001 (Approx. 5 m long, 5 m wide and 2m
deep). In the bottom of the chip receiving pocket there is a discharging screw system. The
number of screws may vary from one to three. Discharging screw/s feed chips to a belt
conveyor 0105-CB-0005 which feed them to a scalper screen (0105-SS-0001).
3.4.2 Scalper screen (0105-SS-0001) shall be a disc screen with large opening between discs.
Typically spacing between discs can vary from 40 to 80 millimetres. Purpose of the screen
is to separate large impurities as stones, metal pieces etc. from incoming chip flow.
Accepted chips go through the screen and rejected material is led near the screen into
the pile or to the container.
3.4.3 Chip flow from belt conveyor 0105-CB-0003/0004 from the chippers and accept flow from
scalper screen is led to the belt conveyor 0105-CB-0006. This conveyor conveys the
chips to a shuttle belt conveyor 0105-CB-0007 which feed the chips to the chip storage.
3.4.4 Online moisture analyzer shall be provided near feed section of belt conveyor (0105-CB-
2
0005) to check the moisture content of the chip received in chip receiving pocket.
3.5 Chip storage
3.5.1 The chip storage is longitudinal type and it has a triangle type cover round it. The feeding
shuttle belt conveyor (0150-CB-0007) is located in the top of the cover. Volume of the
storage is 26400 loose-m3 (tentatively 90m long X 50m wide) having approx. 5 days
storage of production.
3.5.2 The shuttle belt conveyors 0105-CB-0007 length is about half of the discharging area
length. This Conveyor shall move above the discharging area and drops the chips down in
one place at a time. When this place is full, conveyor shall move either about 0.5 - 1 meter
forward or back. When half of the storage is full, conveyor changes the rotation direction
and starts to fill the other side of the storage with the same method.
3.5.3 Screw Reclaimers 0105-CS-0002 and 0105-CS-0003 under the storage are discharging
chips to a chip screen feeding belt conveyor system. Typically both screws are working all
the time and both of them are discharging half of the needed amount of chips. The screws
are dimensioned in such a way that each screw can feed the required amount of chips to
the screening. Screws rotating speeds are adjustable and set point to the speed is given
from the level of the chip feeding silo 0105-TI-0001.
3.6 Chip screening
3.6.1 Chips are led from discharging screws via belt conveyors 0105-CB-0008A/B and 0105-CB-
0009 to a stone separator conveyor 0105-CB-0010.
3.6.2 The stone separator conveyor 0105-CB-0010 is a belt conveyor with an adjustable rising
angle. Chip flow from previous conveyor 0105-CB-0009 is fed to the beginning of the stone
separator conveyor. When the angle of the conveyor is suitable, stones and other heavier
pieces will bounce away from the conveyor and chip flow will continue to the screening.
Stone separator conveyor feed the chips to the belt conveyor 0105-CB-0011. This conveyor
feeds the chip flow to the chip screen 0105-SS-0002.
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
Doc. no.
JOB SPECIFICATION
(STATIC & MACHINERY EQUIPMENT) B215-000-80-43-SP-4505
RAW BAMBOO HANDLING PACKAGE Rev.2
Page 9 of 29
3.6.3 Cross belt Overband Magnetic Separator (0105-SM-0001) shall be provided on stone
separator conveyor 0105-CB-0010 for separation of metallic particles from chip.
3.6.4 Metal detector (Tag No. By Contractor) shall be provided on the stone separator conveyor,
downstream of the Magnetic Separator. This Metal Detector will give an alarm on detecting
metal so that the operator can stop the conveyor and remove metal manually.
3.6.5 In a gyratory chip screen (0105-SS-0002) there is a shaft in the middle of the screen. It
gives the box a freely vibrating circular motion on the horizontal plane. Typical amplitude is
50-60 mm. The chips are fed in a continuous flow to a feeding trough at the top of the
screen. From the trough the chips fall to upper deck. Oversize chips remain on the upper
deck and fall into the overflow trough at the discharge end to conveyor. Oversized chips
are fed to the shredder 0105-SH-0001 continuously by conveyor 0105-CB-0012A.
Shredder's rotating blades cut the oversized chips smaller. The processed chips are fed
back to screening (0105-SS-0002) by conveyor 0105-CB-0012B. Transfer of Oversized
chip from Chip screen to shredder shall be continuous with bypass provision.
3.6.6 Accepted chips are discharged over the edge of the middle screening decks to
2 conveyor 0105-CB-0013. Dust passes through all decks and collects on the bottom plate of
the screen.for removal by conveyor 0105-CB-0007 to a separate dustbin near the
screen house. The dustbin can be loaded to a truck.
3.6.7 Dust collected on the bottom plate of the screen shall be handled in either of the following
ways
a) Dust shall be transferred to consecutive conveyor (0105-CB-0013) and returned back
2 to conveying system.
b) Dust shall be collected in closed bin by dust belt conveyor (0105-CB-0012) then
transferred by truck.
Contractor shall provide both the above arrangements along with bin for dust collection.
chip pile. Typically both screws are working all the time and both of them are discharging
half of the needed amount of chips. They shall be operated from main Control Room. The
operation of Screw reclaimer shall be PLC based and shall have provision to operate on
automatic as well as manual mode. The screws are dimensioned in such a way that each
screw can feed the required amount of chips to the screening. The reclaim rate shall be
variable by means of an operational variable speed screw drive. Screws rotating speeds
are adjustable and set point to the speed is given from the level of the chip feeding silo
0105-TI-0001.
4.4.2 Each of screw reclaimer shall be moving on rail such that the reclaimer can transfer chip
from chip storage into the belt conveyor (0105-CB-0008A/B). The travel speed adjusts
automatically in relation to the degree of chip packing, increasing in loose material and
decreasing to break up hard packed material. Being longitudinal type chip storage
(tentatively 90m long X 50m wide) the screw reclaimer shall be designed to retrieve chip
from any point of chip storage. Type of screw reclaimer shall be selected meeting the
above requirement.
4.4.3 The screw reclaimer shall be stable during the operations with the shuttle belt conveyor
feeding in different positions of chip storage and belt conveyor (0105-CB-0008A/B)
conveying chip to downstream conveyor (0105-CB-0009).
4.4.4 The Screw reclaimer shall feed in to the reclaiming hopper through which the chips would
be transferred to the downstream belt conveyor.
4.4.5 The Screw reclaimers shall be operated from the control desk in the Main Control Room.
The control system shall be so designed that it shall be possible to carry out the reclaiming
operation either automatically or manually, in an interlocked manner from the control desk.
In automatic mode of control, the different drives of the equipment shall start automatically
in successive sequence, while in manual interlocked mode of operation, the drives can be
started and stopped by pressing their respective start and stop push buttons in a
sequentially interlocked manner. Separate PLCs will control its local operation with
simultaneous communication with Plant DCS for start permissive, alarm reporting, trip
indications etc.
Necessary provisions shall be made to interlock the reversible shuttle conveyor and the
screw reclaimers with the incoming and outgoing conveyors. It shall be possible to start
the incoming conveyor only when there is a “running” feedback from reversible shuttle
conveyor (in the event of stacking/filling operation). In the event of reclaiming operation,
the interlock shall be provided to start the screw reclaimers only when there is a “running”
feedback from outgoing conveyor.
4.5 Hydraulic Power Unit
Following specifications shall be considered for Hydraulic power Units, wherever
applicable in the system/package.
4.5.1 The hydraulic power unit shall be of proven design, heavy industrial duty type and suitable
for electrical area classification specified elsewhere in the bid document.
4.5.2 Hydraulic power unit shall consist of two (2) installed positive displacement pumps with
their electric motors arranged for mutual sparing. Each pump shall be designed for 100%
capacity. Valves, piping and interlocks shall be provided to permit operation of equipment
fed by the hydraulic power unit with any of the two (2) pumps.
4.5.3 The hydraulic power unit shall be delivered completely preassembled and skid mounted,
with bulkhead tubing connections, flanged piping connections and electrical junction boxes
at limit of base plate.
4.5.4 Reservoir shall be stainless steel construction. Reservoir shall be furnished with an
electrical heating coil for heating the oil prior to start-up in cold weather. Electric heater
shall be flanged type.
4.5.5 Filter shall be provided with differential pressure switch/transmitter across all filters.
4.5.6 Contractor shall provide satisfactory PTR for selected HPU vendor for the similar service.
4.6 Belt Conveyors
4.6.1 Belt conveyors shall be designed as per EIL standard specification No. 6-47-0001.
(However CEMA is also acceptable for Belt conveyor sizing and Power calculation) and
other Indian / International standards referred therein. The list and brief parameters of the
belt conveyors considered within the scope of this package shall be as per the Scope of
Work and Data sheets attached with the Tender document.
4.6.2 The following requirements are over and above the same specified in EIL standard
specification No. 6-47-0001 and other Indian / International standards referred therein.
However, in case of any conflict between the specifications, the most stringent one shall be
followed.
4.6.3 Walkways of minimum 1000mm one side and 750mm on other side shall be provided for
every conveyor. Covered gallery shall be provided all along the belt conveyors. All
walkways shall be provided with chequered plates. All transfer tower floors shall be
provided with chequered plates of suitable strength. Toe guards shall be provided on
walkways inside galleries on both sides of walkways.
4.6.4 Resistance due to impact pad/ slider bed, if applicable, shall be calculated according to
latest edition of “Belt Conveyors for Bulk Materials” published by CEMA. However friction
factor from impact pad / slider bed shall be considered as minimum 0.8.
4.6.5 Peripheral Force required on Drive Pulley and kW rating of Motor shall be calculated in
accordance with IS: 11592, to which any pullout resistance due to column height of
material in the hopper above the skirt plates shall be added.
Motors shall be sized to be non-overloading over the entire capacity range.
4.6.6 Slopes of conveyors, wherever applicable, shall not exceed 15 degree depending on the
lump size and other governing factors. The conveyors shall be horizontal at the feed point
as far as possible.
Only in case of inevitable circumstances, Conveyor angle above 15 degree may be
accepted subject to Client/EIL review. In such cases, the decision of Owner/EIL shall be
final and binding on the contractor without any cost and time implications. However, in
such cases, the feeding zone shall not be at more than 15 degree slope.
4.6.7 Suitable hold back devices for preventing running back of the conveyor belt in case
conveyor being stopped in loaded condition due to power failure or during normal
operational delays shall be provided to give positive protection. The hold back shall
instantaneously engage without shock and be capable of protecting equipment and
personnel. It shall be released instantly when power resumes or delay is removed. Hold
back devices shall be integral with gear box.
4.6.8 All over-ground and overhead conveyors shall be located in suitably enclosed bridge
structure. The conveyor bridge shall have permanently colour coated steel sheeting covers
on roof and both sides, properly screwed or locked to steel structure as required.
4.6.9 Top and bottom cover thicknesses shall be 6mm and 3mm (minimum) respectively.
4.6.10 The idler rolls shall be made from ERW tubes of nominal 4.5mm thickness, finished on the
outside with edges rounded to prevent the damage of the belt.
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
Doc. no.
JOB SPECIFICATION
(STATIC & MACHINERY EQUIPMENT) B215-000-80-43-SP-4505
RAW BAMBOO HANDLING PACKAGE Rev.2
Page 13 of 29
4.6.11 Carrying idler frames shall be designed to prevent any accumulation of material, which
shall hinder free rotation of the idlers. The frames shall not have any protruding parts liable
to damage the belt.
4.6.12 All transition idlers shall be of three drop-in type, in-line identical and interchangeable rolls
with fabricated bracket.
4.6.13 Impact idler rolls wherever provided shall consist of atleast six (6) numbers of closely
spaced resilient natural rubber discs having thickness not less than 25mm and durometer
hardness of 55 to 65 shore, scale “A”.
4.6.14 Impact idlers shall be able to withstand the heavy impact of material loaded onto the belt
conveyor. These idler sets shall be provided at all the loading points and the spacing shall
not exceed 500mm.
4.6.15 All return idlers shall be of flat type.
4.6.16 The spacing of the return idlers shall be based on belt sag, which shall not exceed 2%.
However, the maximum spacing shall not be more than 3000 mm in any case.
4.6.17 The training idler shall be pivot mounted on self aligning swiveling base having dust proof
lubrication.
4.6.18 Two (2) Nos. guide rollers at each end shall be provided to maintain proper alignment of
belt. These assemblies shall be provided at every 10 m spacing. Return training idlers shall
be provided at every 30m spacing.
4.6.19 All drive pulleys shall be provided with 20mm diamond groove rubber lagging. All non-drive
pulleys shall be lagged with minimum 10 mm plain natural rubber.
4.6.20 The minimum shaft diameter at bearing shall not be less than 50mm. Shafts shall not
protrude from the pillow blocks where required and in such cases end cover shall be
provided for the pillow block. The pulley shaft shall be designed such that deflection of
shaft does not exceed 1 mm per metre length of shaft between bearing centres. The
diameter of shaft at bearing shall be standardized to minimize the types of bearings. All
bearings used in the conveyor pulleys shall be selected one size higher than the required
size by calculation.
4.6.21 All pulley assemblies shall be tested by X-ray or ultrasonic test methods for detection of
cracks.
4.6.22 Two stage external belt cleaners comprising of primary and secondary belt cleaners shall
be provided immediately after the discharge pulley on the return belt side.
4.6.23 External two-stage belt cleaning system shall consist of external primary and secondary
scrapers of suitable design to clean the belt on its return run before the carrying belt side
comes in contact with any snub and bend pulley in all belt conveyors.
4.6.24 External primary and secondary scrapers shall be of multiple sprung blade type. It shall be
mounted such that the blades are inclined against the direction of belt travel with minimum
tracking. Individual blades shall be bolted to a sprung element and shall be made of
suitable wear resistant material.
4.6.25 One No. V-Type internal scraper shall be provided before the return side of the belt enters
the lapping zone of the tail pulley.
4.6.26 The V- angle of the plow shall not be less than 60° and the apex shall point out towards the
discharge end of the conveyor. This scraper shall be provided with necessary stoppers to
prevent the metal strips holding the rubber blades coming into contact with belt due to wear
of the rubber blades.
4.6.27 The minimum slope of the chute shall be 65 deg with horizontal plane and all chutes shall
be designed such that build-up of materials does not take place in the chute. Minimum
valley angle of 60 deg shall be provided with respect to the horizontal plane. All head snub
pulleys shall be taken inside the chutes.
4.6.28 For all discharge chutes, SAILHARD/SAILMA/TISCRAL liners of minimum 12mm thickness
shall be used. Chute plate thickness shall be minimum 10mm.
4.6.29 The discharge hoods shall be constructed from plates of thickness not less than 6 mm.
4.6.30 The construction of chutes shall be in convenient sections with flanged joints so that the
same can be erected and dismantled easily. All flange joints and bolt holes shall be
properly sealed with suitable gasket of minimum 3mm to prevent leakage of dust and air.
4.6.31 Loading zones of all conveyors shall be provided with skirt boards.
4.6.32 Skirt board shall be fabricated from suitably lined (SAILHARD/SAILMA/TISCRAL liners of
minimum 12mm thickness shall be used) carbon steel plates of minimum 10mm thick.
4.6.33 Rubber curtain shall be provided at the end of the skirt board to minimize generation of
dust.
4.6.34 Skirt boards shall be provided with bolted type cover plates of minimum 3.15mm thickness.
4.6.35 If gravity take up is provided, the take-up tower shall be fabricated from structural steel with
necessary rope sheaves. The tower shall be provided with suitable safety cage for a height
of 2.5 mtr form ground level made of expanded metal sheets. All the necessary
maintenance platform, access Staircase from ground level etc. shall be provided.
4.6.36 The bottom of the gravity take up tower shall be provided with a sand pit so that if the
counterweight falls due to breakage of belt/rope, it shall transfer the impact to the sand
cushion.
4.6.37 If required, the idler brackets at the concave/convex curve shall be provided with the
required shims to ensure a smooth curve of the belt line.
4.6.38 All bearings shall be of antifriction type.
4.6.39 The drive assembly shall consist of the drive motor, Fluid or pin bush coupling (as
applicable), reduction gear box with integral hold back (if required), flexible coupling and
brake, if necessary, as per requirement. The drive units shall be selected based on design
conveyor capacity.
4.6.40 The gear reducer housing shall be of cast steel or welded steel construction, of modular
design, totally enclosed, stress relieved and machined to form rigid, oil tight and dust proof
enclosure for the gears and the bearings. The cover shall be split type at shaft center-line
so that top half can be removed for inspection and repair without disturbing the bottom half.
The gear reducer shall have oil filling cap, breath vents, a visible oil level indicator,
dipsticks and easily accessible drain plug.
4.6.41 The gear box assembly shall be designed for minimum operating L10 life of 50000 hours.
4.6.42 All the bearing installations shall have standard Plummer blocks. Plummer blocks shall be
sourced from approved bearing manufacturer only.
4.6.43 All welded steel construction common base frame shall be provided for the complete drive
assembly (i.e. motor, reducer and couplings).
4.6.44 Brakes shall be provided in belt conveyors where stopping distance is to be regulated, i.e.
the requirement of brake shall be governed by coasting time considerations.
4.6.45 Brake shall be of robust design and each brake shall be able to stop the drive motor in
adverse conditions in the event of power failure. Brake for conveyors shall be Electro
Hydraulic thruster type.
4.6.46 Fluid coupling shall be used as high speed coupling whenever the motor rating exceeds 30
kW. In case fluid coupling is used, selection of fluid coupling should be on the motor rating
as per manufacturer's recommendation. Further service factor is not required to be
considered.
4.7 Belt Scales
4.7.1 Suitable electronic type belt scales shall be provided in the conveyor system, based on the
belt width of the relevant conveyors.
4.7.2 The belt scale shall be complete in all respects with weigh frame, machined idlers, speed
sensor, hermetically sealed and temperature compensated load cell and all necessary
screened and control cables from the field to the weighing panel located in the Main
Control Room.
4.7.3 The belt scales shall be provided with auto correction facility to set right any deviation from
actual rate of conveying over the pre-set /rated capacity. The accuracy of weighment shall
be ±0.5% or better on the actual conveying rate.
4.7.4 It shall be possible to know the instantaneous as well as totalized rate of flow of material
over a period of time in the weighing panel.
4.8 Online Electromagnetic Separator
4.8.1 The electromagnetic separator complete with tramp iron box, tramp chute, access ladders,
handrails and all necessary electrics shall be hung from two nos. of monorail beams by
suitable fixtures and held by an electric hoist of adequate capacity.
4.8.2 The electro-magnet shall be suitable to lift tramp iron pieces of weight upto a maximum of
25 kg, with an operating height of 400mm, from the bottom of the maximum burden depth
of material being conveyed by the conveyor.
4.8.3 The magnet shall be of bolted construction and provided with non-magnetic faceplate. The
electromagnet shall be fabricated from high permeable mild steel and shall be totally
enclosed, dust-proof and of bolted type for easy maintenance. The magnet shall be air-
cooled and the magnet coil shall be made of copper with “H” Class of Insulation. Provision
for ease of access to the electromagnet shall be ensured. There shall be a fixed platform
with necessary access ladders and handrail.
4.8.4 The design of the electromagnetic separator shall be such that tramp metal pieces do not
fall back onto the material stream being conveyed. Contractor shall note that the
electromagnetic separator shall be energized once the belt conveyor starts at no-load and
will remain so continuously till power to the conveyor is cut-off.
4.8.5 The portion of the conveyor technological structure and discharge chute coming in the field
of the electromagnet shall be made of non-magnetic material.
4.9 Reversible Shuttle Belt Conveyor
4.9.1 The reversible belt conveyor shall be designed to include all items and accessories as in
normal belt conveyors detailed in this specification along with necessary reversing drive
arrangement. However, online direction change of belt conveyor is not permitted. Direction
of belt conveyor shall be decided by selecting source and destination point of chip storage
by operator after stopping of related conveying system.
4.9.2 The belt conveyor shall be complete in all respects with necessary belting, impact idlers,
head/drive, tail pulleys, screw take-up arrangement at the tail pulley, drive unit consisting of
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
Doc. no.
JOB SPECIFICATION
(STATIC & MACHINERY EQUIPMENT) B215-000-80-43-SP-4505
RAW BAMBOO HANDLING PACKAGE Rev.2
Page 16 of 29
geared motor and flexible coupling, internal and external scrapers, all required
technological structures like frames, short posts, stringer channels, tie angles and bracings,
safety devices like pull cord, belt sway and zero speed switch.
4.9.3 All belting shall be with oil resistant cover grade. The belt shall have a minimum factor of
safety as recommended by the belt manufacturer. The maximum working tension of the
belt shall not exceed 80 % of allowable working tension for the belt.
4.9.4 Contractor to ensure that the full column height of the material on top of belt conveyor shall
be considered while performing the drive power calculation.
4.9.5 Peripheral Force required on Drive Pulley and kW rating of Motor shall be calculated in
accordance with IS: 11592, to which any pullout resistance due to column height of
material in the hopper above the skirt plates shall be added.
4.9.6 Motor kW rating shall be suitable to restart the belt conveyor under fully loaded condition.
Motors shall be sized to be non-overloading over the entire capacity range.
4.9.7 All mechanical components shall generally be similar to the belt conveyors and shall
conform to the General considerations for belt conveyors given in this document.
4.10 Handling Facilities
4.11 Lubrication Facilities
4.11.1 The Contractor shall include in his offer, all necessary lubrication systems required for the
equipment and furnish the relevant details.
4.11.2 The Contractor shall furnish a schedule giving all the information such as component
requiring lubrication, quantity per fill, frequency of changing the lubricants, type of
lubricants etc. along with schematic lubrication arrangement, post order.
4.12 Dust Suppression System
Dust suppression system shall be provided as per specification attached elsewhere in the
bid package.
4.13 Drainage Requirement
Contractor shall design and do detail engineering of Drainage system however, its
construction at site shall be by Others. Drainage system (By OTHERS) shall be provided
2 for bamboo receiving pocket, Chipper House 1 & 2, chip storage area, bamboo feed
handling area to collect the drain water from respective area and shall be sent to settling
chamber. All chip fines collected through the drain shall settle in the settling chamber and
the clear water to be routed back to the designated point at package battery limit.
Contractor shall provide suitable arrangement to dispose the settled chip fines. All the
collecting drain as well as the settling chamber shall be covered so as to avoid any rain
water going into the drain/ settling chamber. Also refer structural specification attached
elsewhere in the bid package.
4.14 Ventilation System
4.14.1 Forced Ventilation with axial fan with louver shutter & bird Screen and associated duct
work to match air-flow rate based on 20 air changes/ hour shall be provided for the
conveyor pit under the Bamboo chip storage shed (Tentative Pit Dimensions: 90m Long X
3m Wide X 2.5m Deep).
4.15 Material Handling Equipment/Facility
4.15.1 Type, quantity and capacity of Material Handling Equipment shall be decided during
detailed engineering based on Material handling facilities study that shall be carried out by
Contractor based on Engineering Design Basis/Philosophy, taking in to account the
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
Doc. no.
JOB SPECIFICATION
(STATIC & MACHINERY EQUIPMENT) B215-000-80-43-SP-4505
RAW BAMBOO HANDLING PACKAGE Rev.2
Page 17 of 29
selected equipment size & weight and the same shall be submitted to ABRPL/EIL for
approval.
For site testing of material handling equipment, purchaser shall provide the test load. The
contractor shall make his own arrangements for shifting of test loads available at various
locations inside the plant, to the erection place where load testing will be carried out for the
material handling equipment.
4.15.2 There shall be adequate number of pendant operated electric hoists / CP Block
(considering minimum pulling effort) as necessary for handling and maintenance of all
equipment. The hoists shall be suitable for operation from the respective platforms.
4.15.3 Up to 16 MT capacity Electric Wire Rope Hoist shall be as per IS 3938. For capacity above
16 MT, Electric hoist shall be manufacturer's standard based on satisfactory Proven Track
Record.
4.15.4 The capacity of the Electric Hoist / Chain Pulley Block shall be decided based on heaviest
equipment to be handled during maintenance plus design margin of 10 % as a minimum.
4.15.5 The minimum capacity of chain pulley blocks with monorail shall be weight of the largest
components to be handled plus design margin of 10 % as a minimum. Wherever two chain
pulley blocks are required, each of 75% capacity of the total weight shall be provided.
4.15.6 For handling counter-weights of conveyors, geared trolley mounted chain pulley blocks are
to be considered irrespective of the weight and lift.
4.15.7 Electrically operated Hoist with trolley will be generally provided for handling equipment /
component weighing 5 MT or above and / or lift more than 5m or where frequency of
maintenance/operation is relatively high.
4.15.8 Chain pulley blocks of standard capacities shall be provided. CP Blocks shall be of
detachable type suitable for mounting on trolleys of same rating/capacities.
4.15.9 All Chain Pulley Blocks shall be spark resistant construction irrespective of hazardous area
classifications.
4.15.10 As a minimum, following sheds/areas shall be provided with Electric Hoists for
maintenance purpose.
Bamboo receiving pocket
Chipper House 1 & 2
Chip Scalper Screen house
Bamboo Chip Storage
Bamboo Feed Handling Shed
2 Transfer Tower
2 De-dusting system shall be provided as per EIL specification for Dust collection system –
Bag filter type (6-23-0001).
inspection procedure shall include checking the major dimension and verification of
materials of construction (through mill test reports etc. which shall be made available by the
vendor of all major components). Vendor shall furnish (with the equipment) material
certification for major components. Minimum requirement shall be as per ITP attached with
the bid package.
5.2 After assembly of each unit, it shall be subjected to tests as per the manufacturer’s
standard test procedure. This should include a functional test of the smooth running of the
equipment. The functional test may be witnessed by Owner/EIL at Vendor’s shop.
Contractor shall furnish necessary notice for witnessing shop tests to Owner/EIL in due
course. If dismantling is required for improvement of performance in the tests, the initial test
shall not be acceptable and the final test must be done after corrections are made.
5.3 Acceptance of shop tests shall not constitute a waiver of requirements to meet the field
performance under the specific operating conditions nor shall inspection by purchaser or
his representative relieve the Contractor of his responsibilities in any way.
5.4 Generally Tests shall be conducted as per relevant standards as applicable for each and
every equipment/item.
5.5 Contractor shall submit Quality Assurance (QA) procedure before commencement of
fabrication for review. Approved QA procedure shall form the basis for equipment
inspection
5.6 Contractor to also comply with the Inspection and testing as per clauses mentioned in the
Standard Specification for equipment attached with the bid package.
6.2.7 Contractor shall demonstrate re-starting of conveyors under loaded belt conditions for load
not exceeding the rated load.
6.2.8 Commissioning certificate shall be issued as soon as the unit establishes cumulative 48
hours of trouble free operation on load. For calculating cumulative 48 hours of operation,
2
uninterrupted operation of minimum 6 hours per shift shall be considered.
6.2.9 Preliminary operational period of two (2) months after commissioning shall be considered
as the stabilization period. Once the system is stabilized and attains a minimum of 15 days
of trouble free operation, supplier shall submit notice for PG test. Submission of all as-built
documents and drawings and liquidation of all check list points shall be considered as a
pre-requisite for serving notice for PG test.
6.2.10 Once the notice is served, PG test shall be conducted at a mutually agreed time within six
(6) months from the date of serving notice for PG test.
6.2.11 Capacity shall be determined based on the electronic weigh scale readings duly calibrated
prior to the PG test. Measuring tolerance shall be as per the accuracy limit of the
instrument.
6.2.12 Duration of the test shall be a continuous period of 6 hours/day for 4 consecutive days.
During the PG test, system shall be operated at rated capacity. Acceptance of the system
shall be based on its capability to handle chip at its rated capacity for duration of 6 hours
(continuous) without any spillage or undue vibration & noise.
6.2.13 If the system fails to achieve PG parameters, Contractor shall carry out necessary
modification at his own cost till the rated capacity is achieved within mutually agreed time
period in consultation with ABRPL/Consultant from the date of failure of PG test and a
second PG test shall be organized.
Manufacturer) which shall include minimum spares as listed in Cl. 1.2.13 of Scope of
Supply / Work for Raw Bamboo Handling Package (Doc. No. B215-000-80-43-SW-4505)
with recommended quantities and itemised prices.
Recommended spares and their quantities should take into account related factors of
equipment reliability, effect of equipment downtime upon production or safety, cost of parts
and availability of vendor's service facilities around the proposed location of equipment.
8.4 Special Tools and Tackles
Contractor shall provide One (1) set of new and unused special tools and tackles as
required, for day to day operation and maintenance of the offered equipment / system.
These Special tools and tackles shall be supplied, as per OEM (Original Equipment
Manufacturer) recommendation, along with the main equipment and shall include minimum
Special Tools & Tackles as listed in Cl. 1.2.10 of Scope of Supply / Work for Raw Bamboo
Handling Package (Doc. No – B215-000-80-43-SW-4505).
Contractor shall include the cost of the special tools and tackles in his quoted Lump
Sum/base price of package.
8.5 Proper coding and referencing of spare parts shall be done so that later identification with
appropriate equipment is facilitated.
8.6 Commissioning spares, Mandatory Spares and Special tools and tackles shall be
separately packed with separate packing list. Packing case shall be clearly marked as
Commissioning spares / Mandatory Spares / Special tools and tackles
ANNEXURE-1
(JOB SPECIFICATIONS FOR SILO)
1. This specification covers general requirement for the design, engineering, materials,
fabrication, workmanship, inspection, testing, supply, and erection at site of Silo in accordance
with this specification & Codes listed in the bid document.
2. The requirements outlined in this specification & its attachments are minimum and shall be
carried out for quality assurance and for job records. However these shall not prohibit the
Contractor from offering the best available technology & additional requirements based on his
experience of supply of such equipment. This specification shall not be considered limiting & it
shall be Contractor's responsibility to comply with all the requirements of the package on to
which it is annexed. CODES FOR SILOS (as applicable):
The Indian & International Codes applicable to the design and construction of the Storage
Facility Silos shall be as follows:
2.1 Design Specifications:
IS – 9178 : Criteria for design of Steel Bins for storage of Bulk Materials*
Part I : General Requirements and Assessment of Loads
Part II : Design Criteria
Part III : Bins Designed for Mass Flow and Funnel Flow
* (Bulk density of chip in the IS shall be read as 250 kg/ cubic meter with compaction
factor of about 5% (five per cent)).
IS – 1893 for seismic loads
IS - 875 for wind loads
SS EN 1993-4-1:2011: Design of Steel Structures-Silos
2.2 Construction Specifications:
In case of any conflict or inconsistency in the provisions of the applicable Indian Standards
or codes and International Standards or codes, the Indian Standards or codes shall apply.
In the absence of any specific provision in this Agreement, the following standards shall
apply in order of priority:
(i) Bureau of Indian Standards (BIS)
(ii) Relevant Standards or codes as applicable in the United States of America or the
European Union or Singapore such as
AISC - American Institute of Steel Construction
AISI - American Iron and Steel Institute
ASABE - American Society of Agricultural & Biological Engineers
ASCE - American Society of Civil Engineers
ASTM - American Society for Testing and Materials
ICC - International Code Council
OSHA - Occupational Safety and Health Administration
(iii)Any other specifications/standards/codes proposed by the Concessionaire and reviewed
by the Independent Expert.
The latest version of the specified codes and standards which were notified/
published at least 60 (sixty) days prior to the Bid Date in respect of this
Agreement shall apply.
In case of any inconsistency or conflict between the provisions of this
Agreement and the applicable BIS Standards or Codes, the provisions of this
Agreement shall apply.
The Storage Facility, including its systems and equipment, shall conform to
Applicable Laws, Applicable Permits, provisions of this Agreement and Good
Industry Practice.
3. DEVIATIONS
Deviations are not acceptable to Bid. However, deviation with intent to improve upon the
equipment life or performance may be discussed and settled in pre-bid stage and it shall be
Client/EIL’s prerogative to accept them or not. Post Bid deviation is not allowed.
For successful Contractor any deviation at the execution stage, which becomes unavoidable,
shall be submitted for Client/EIL approval and Contractor shall not proceed with such
deviation till acceptance of deviation by Client/EIL Time taken/delay, if any, in processing of
deviation permit or its rejection shall be solely to Contractor’s account. Client /EIL decision in
this regard shall be firm and binding on the Contractor.
4. DESIGN
The following loading conditions & effects shall be considered while designing the various
components of a Silo & Silo walls, compression ring, curb angle stiffeners & bottom cone etc.
4.1 Pressure Loading
Pressure exerted by the stored chip on Silo walls shall be considered.
4.2 Dead Load/Superimposed Loads
a. Dead load of silo, structure and any equipment mounted on it such as temperature
cables etc.
b. Superimposed loads due to material handling equipment (such as screw reclaimer),
ladders and platforms etc.
c. Horizontal load/pressure acting on the side walls, vertical load/pressure acting on
cross sectional area & frictional load/pressure on the side walls at every point of
shell and cone caused due to stored product during all conditions shall be calculated
& considered for design.
4.3 Operating Loads
Due consideration shall be given to the following while designing the silo for operating
conditions:
a. Normal filling and emptying.
b. Homogenization/Recirculation
c. Arching of stored product
d. Discharge devices such as Screw reclaimer etc. & Load exerted by temperature
Cables during emptying of chip.
4.4 Combination of loads:
During design of silo, worst combination of loads & effects shall be considered. Analysis of
stress shall be carried out in erection, operation and testing conditions. Wind and seismic
loads need not be considered acting simultaneously. Other loadings from direct & indirect
sources shall be considered, which may be present & required to be considered for structural
safety of the silo.
shall be designed with appropriate mechanisms to enable easy access to and reading of the
scaled ruler for verification of the volume of chip stored in a Silo at any point of time.
9. ACCESSORIES REQUIRED FOR OPERATION & MAINTENANCE OF SILO
The Silo shall be provided with following accessories required for easy operation and
maintenance
Approach step ladder system installed in spiral around silo (2 ft Min. width)
A straight Step Roof Ladder covering all roof platforms (2 ft Min. width)
Internal ladder Accessible from roof to enter in to Silo
3 full Platforms shall be provided on roof (starting of roof, mid of roof & peak of roof). A
minimum 6 feet diameter platform shall be provided on peak platform. Platforms shall
be provided with Handrails.
Roof manhole, Shell Manhole on the first ring of silo
Vents with flap gates
Floor screen of silos shall be of flat design for easy clean out of chips.
Roof panels to have corrugated profile so that the overlapping panels do not have any
gap in between.
10. DOCUMENTATION
Design calculations, stress analysis, FEA (if required) and mechanical engineering data
sheets/fabrication drawings shall be submitted for CLIENT/EIL review. Contractor shall also
furnish additionally generated data for detailed design and design formulas used along with
references for review. Comments, if any, shall be complied with. Review of documents shall
not relieve the Contractor/ Vendor of his responsibilities to supply equipment as per
requisition.
Vendor to provide loading data for design of foundation and technological structure &
calculation thereof.
Master document index with submission date must be submitted within 15 days after award of
contract. Following order of submission of document must be adhered to:
a) Master document index with schedule of submissions.
b) Mechanical design calculations & FEA (if required).
c) Mechanical engineering data sheets.
d) Detailed drawings/documents.
Mechanical Engineering Data sheets/Fabrication drawings
Mechanical engineering datasheets/fabrication drawings shall include the following as a
minimum:
a) Design Data
b) Complete dimensions; size, location & orientation of Accessories & supports etc.
c) Material of construction of all components along with their sizes and thickness.
d) Any specific feature, requirements relating to the equipment.
Silo Vendor documents must be reviewed & approved by Contractor before submission.
Unchecked document without revision clearly marked shall not be reviewed. Successive
review of the same document shall apply only with respect to comments on the previous
submission. All documents shall be legible & of good quality. Illegible documents shall be
returned without review & any delay in review of such documents shall be to Contractor’s
account.
11. INSPECTION
For the equipment stage wise & final inspection shall be by a reputed third party
inspection agency. Inspection shall be carried out only after drawings are approved by
EIL.
Contractor shall carry out various tests as per applicable codes/standards. Any or all
test shall be witnessed by CLIENT/EIL.
Silos shall be subjected to inspection by CLIENT/EIL or third party who shall have
access to inspect the equipment at any stage during manufacture. During inspection,
material certificates, shop test data, certificates for bought out components and other
relevant information shall be furnished and testing done as required so as to ascertain
that the specifications and quality is complied with.
Inspection test plan shall comply with all requirements specified or enclosed herein. It
must specify various stages of inspection. Any comments by CLIENT/EIL shall be
complied with without time & cost implication.
Silo Roof & Shell shall be checked for water leak proof by Hydrant @ 5 kg/cm2.
12. GUARANTEES
Contractor shall guarantee the sizing, mechanical design, materials, workmanship, and
performance of complete silos including all components, sub-assemblies, bought outs
etc.
Contractor shall guarantee that all the materials used in the equipment are new and
have been submitted to regular acceptance procedure & are free from any defect
regarding quality, form and appearance and compliance to various technical
requirements of this specification.
ANNEXURE-2
2 (UTILITY SPECIFICATION AT CONTRACTOR BATTERY LIMIT)
Refer Utility condition for Raw bamboo handling package, attached elsewhere in the tender.
ANNEXURE-3
[PIPING MATERIAL SPECIFICATION (PMS)]
Client : ABRPL
Abbreviations:
PE : Plain End
BE : Bevel End
SW : Socket Weld
BW : Butt Weld
CONTENTS
1 A1A 150 1.5 CARBON STEEL AMMONIA, STEAM & CONDENSATE (NON
IBR); UTILITIES- INST AIR(BEYOND A3A IN
OFFSITES), PLANT AIR, NITROGEN,WATER -
BEYOND A3A
2 A2A 150 1.5 IBR CARBON STEEL STEAM (IBR), BOILER FEED WATER (IBR) &
SERVICE CONDENSATE (IBR)
7 B2A 300 1.5 IBR CARBON STEEL STEAM, BOILER FEED WATER &
SERVICE CONDENSATE - ALL IBR
8 D2A 600 1.5 IBR CARBON STEEL STEAM (IBR), BOILER FEED WATER (IBR)
SERVICE
Package : IPMCS
Report No. : 50
Package : IPMCS
Report No. : 50
SERVICE
AMMONIA, STEAM & CONDENSATE (NON IBR); UTILITIES- INST AIR(BEYOND A3A IN OFFSITES), PLANT AIR,
NITROGEN,WATER - BEYOND A3A
NOTES
1 NDT REQUIREMENTS AS PER EIL STANDARD 6-44-0016.
5 FOR PERMANENT 'T' TYPE BW STRAINERS,REFER EIL'STD 7-44-0303 & 7-44-0304; AND FOR TEMPORARY
STRAINERS,REFER EIL'STD 7-44-0300; FOR SPACER AND BLIND REFER EIL'STD 7-44-0162.
7 FOR RESTRICTION ON USE OF BALL,PLUG & BUTTERFLY VALVES,REFER GENERAL NOTES.
36 THIS IS A PRESSURE BALANCED PLUG VALVES WHICH SHALL BE USED ONLY IF SPECIFIED IN P&ID.
92 GATE VALVES OF SIZE 26" AND ABOVE SHALL BE IN ACCORDANCE WITH B-16.34 AND FLANGE ENDS SHALL BE IN
ACCORDANCE WITH ASME B16.47 SERIES B.
SPECIAL NOTES
ON LINES >= 2.0" AS PER P&ID OR 0.75". REFER EIL STD. 7-44-0351, D4
ON LINES >= 2.0" AS PER P&ID OR 0.75". REFER EIL STD 7-44-0351, V4
PRESS.CONN 0.75" SW NIPPLE WITH VALVE TO SPEC AS PER EIL STD 7-44-0354
Package : IPMCS
Report No. : 50 A1A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 7 of 58
84.00 84.00
80.00 80.00
76.00 76.00
72.00 72.00
70.00 70.00
68.00 68.00
66.00 66.00
64.00 64.00
62.00 62.00
60.00 60.00
58.00 58.00
56.00 56.00
54.00 54.00
52.00 52.00
50.00 50.00
48.00 T 48.00
46.00 T R 46.00
44.00 T R R 44.00
42.00 T R R R 42.00
40.00 T R R R R 40.00
38.00 T R R R R R 38.00
36.00 T R R R R R R 36.00
34.00 T R R R R R R R 34.00
32.00 T R R R R R R R R 32.00
30.00 T R R R R R R R R R 30.00
28.00 T R R R R R R R R R R 28.00
26.00 T R R R R R R R R R R R 26.00
24.00 T R R R R R R R R R R R R 24.00
22.00 22.00
20.00 T R R R R R R R R R R R R R 20.00
18.00 T P R R R R R R R R R R R R R 18.00
16.00 T P P R R R R R R R R R R R R R 16.00
14.00 T P P P R R R R R R R R R R R R R 14.00
12.00 T P P P P R R R R R R R R R R R R R 12.00
10.00 T P P P P P R R R R R R R R R R R R R 10.00
8.00 T P P P P P P R R R R R R R R R R R R R 8.00
6.00 T P P P P P P P R R R R R R R R R R R R R 6.00
5.00 5.00
4.00 T R R R R R R R R R R R R R R R R R R R R R 4.00
3.50 3.50
3.00 T R R R R R R R R R R R R R R R R R R R R R R 3.00
2.50 2.50
2.00 T R R R R R R R R R R R R R R R R R R R R R R R 2.00
1.50 T T H H H H H H H H H H H H H H H H H H H H H H H 1.50
1.25 1.25
1.00 T T H H H H H H H H H H H H H H H H H H H H H H H H 1.00
0.75 T T T H H H H H H H H H H H H H H H H H H H H H H H H 0.75
0.50 T T T T H H H H H H H H H H H H H H H H H H H H H H H H 0.50
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
26.00
28.00
30.00
32.00
34.00
36.00
38.00
40.00
42.00
44.00
46.00
48.00
1.00
1.25
1.50
2.00
2.50
3.00
3.50
4.00
5.00
6.00
8.00
.50
.75
CODE DESCRIPTION
F SADDLE FUSED JT T TEES J THREADOLET
H H. COUPLING W WELDOLETS
S SOCKOLETS L SWEEPOLET
Package : IPMCS
Report No. : 50 A1A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 8 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
PIP PIPE 1 1.5 XS B-36.10 ASTM A 106 GR.B PE, SEAMLESS PI21977Z0
PIP PIPE 3 14 STD B-36.10 ASTM A 106 GR.B BE, SEAMLESS PI21917Z0
NIP NIPPLE 1 1.5 M B-36.10 ASTM A 106 GR.B PBE, SEAMLESS PN21967Z0
Flange Group
FLG FLNG.WN .5 24 M B-16.5 ASTM A 105 150, RF/125AARH FWC0127Z0
Package
Report No.
: IPMCS
: 50
A1A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 9 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
A1A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 10 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Valves Group
GAV VLV.GATE .25 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 51001ZZZ0
15761 105,TRIM- 16.11, SHT NO.- 51001
STELLITED,STEM-
13%CR.STEEL
GAV VLV.GATE 2 42 API 600/ ISO BODY-ASTM A 216 FLGD, 150, B-16.5, 51301ZZZ0 92
10434 GR.WCB,TRIM- RF/125AARH, SHT
13% CR.STEEL NO.- 51301
GLV VLV.GLOBE .25 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 52001ZZZ0
15761 105,TRIM- 16.11, SHT NO.- 52001
STELLITED,STEM-
13%CR STEEL
GLV VLV.GLOBE 2 16 BS-1873 BODY-ASTM A 216 FLGD, 150, B-16.5, 52301ZZZ0
GR.WCB,TRIM- RF/125AARH, SHT
13% CR.STEEL NO.- 52301
CHV VLV.CHECK .25 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 53001ZZZ0
15761 105,TRIM- 16.11, SHT NO.- 53001
STELLITED
CHV VLV.CHECK 2 24 BS 1868 BODY-ASTM A 216 FLGD, 150, B-16.5, 53301ZZZ0
GR.WCB,TRIM- RF/125AARH, SHT
13% CR.STEEL NO.- 53301
BLV VLV.BALL .5 16 BS EN ISO BODY-ASTM A 105 FLGD, 150, B-16.5, 54301ZZZ0
17292 /A RF/125AARH, SHT
216GR.WCB,TRIM- NO.- 54301
BODY SEAT-
RPTFE
PLV VLV.PLUG .5 24 BS-5353 BODY-ASTM A 105 FLGD, 150, B-16.5, 55301ZZZ0
/A RF/125AARH, SHT
216GR.WCB,TRIM- NO.- 55301
PLUG-HARDENED
PLV/1 VLV.PLUG .5 36 BS-5353 BODY-ASTM A 105 FLGD, 150, B-16.5, 55315ZZZ0 36
/A RF/125AARH, SHT
216GR.WCB,TRIM- NO.- 55315
PLUG-HARDENED
BFV VLV.BTRFLY 3 24 BS EN 593 BODY-ASTM A 216 WAFL, 150, B-16.5, 56301ZZZ0
GR.WCB,TRIM- WAF/125AARH, SHT
13% CR.STEEL NO.- 56301
BFV VLV.BTRFLY 26 48 BS EN 593 BODY-ASTM A 216 FLGD, 150, B-16.47 B, 56315ZZZ0
GR.WCB,TRIM- RF/125AARH, SHT
13% CR.STEEL NO.- 56315
Bolt Group
BOS BOLT.STUD .5 48 B-18.2 BOLT:A193 GR.B7, BS40404Z0
NUT:A194 GR.2H
Gasket Group
GAS GASKET .5 24 B-16.20- SP.WND SPIRAL, 150 GK66272Z0
ANSI B16.5 SS316+GRAFIL+ I
RING
Package
Report No.
: IPMCS
: 50
A1A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 11 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
A1A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 12 of 58
SERVICE
STEAM (IBR), BOILER FEED WATER (IBR) & CONDENSATE (IBR)
NOTES
1 NDT REQUIREMENTS AS PER EIL STANDARD 6-44-0016.
5 FOR PERMANENT 'T' TYPE BW STRAINERS,REFER EIL'STD 7-44-0303 & 7-44-0304; AND FOR TEMPORARY
STRAINERS,REFER EIL'STD 7-44-0300; FOR SPACER AND BLIND REFER EIL'STD 7-44-0162.
7 FOR RESTRICTION ON USE OF BALL,PLUG & BUTTERFLY VALVES,REFER GENERAL NOTES.
8 ALL PIPES,FITTINGS,VALVES,FLANGES,TRAPS AND STRAINERS SHALL BE TESTED AND TEST CERTIFICATE IN FORM
III A FOR PIPE AND FORM III C FOR OTHERS SHALL BE REQD. DULY COUNTERSIGNED BY IBR AUTHORITY OR ITS
APPROVED REPRESENTATIVE.
9 CARBON CONTENT SHALL NOT EXCEED 0.25% FOR ALL PIPES,FITTINGS FLANGES ETC. THAT MAY REQUIRE
WELDING. MOREOVER,FOR FLANGES THE SULPHUR AND PHOSPHOROUS SHALL ALSO BE LIMITED TO 0.05% EACH.
92 GATE VALVES OF SIZE 26" AND ABOVE SHALL BE IN ACCORDANCE WITH B-16.34 AND FLANGE ENDS SHALL BE IN
ACCORDANCE WITH ASME B16.47 SERIES B.
SPECIAL NOTES
ON LINES >= 2.0" AS PER P&ID OR 0.75". REFER EIL STD. 7-44-0351, D4
ON LINES >= 2.0" AS PER P&ID OR 0.75". REFER EIL STD 7-44-0351, V4
PRESS.CONN 0.75" SW NIPPLE WITH VALVE TO SPEC AS PER EIL STD 7-44-0354
Package : IPMCS
Report No. : 50 A2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 13 of 58
84.00 84.00
80.00 80.00
76.00 76.00
72.00 72.00
70.00 70.00
68.00 68.00
66.00 66.00
64.00 64.00
62.00 62.00
60.00 60.00
58.00 58.00
56.00 56.00
54.00 54.00
52.00 52.00
50.00 50.00
48.00 48.00
46.00 46.00
44.00 44.00
42.00 42.00
40.00 40.00
38.00 38.00
36.00 T 36.00
34.00 T R 34.00
32.00 T R R 32.00
30.00 T R R R 30.00
28.00 T R R R R 28.00
26.00 T R R R R R 26.00
24.00 T R R R R R R 24.00
22.00 22.00
20.00 T R R R R R R R 20.00
18.00 T P R R R R R R R 18.00
16.00 T P P R R R R R R R 16.00
14.00 T P P P R R R R R R R 14.00
12.00 T P P P P R R R R R R R 12.00
10.00 T P P P P P R R R R R R R 10.00
8.00 T P P P P P P R R R R R R R 8.00
6.00 T P P P P P P P R R R R R R R 6.00
5.00 5.00
4.00 T P P P P P P P P R R R R R R R 4.00
3.50 3.50
3.00 T P P P P P P P P P R R R R R R R 3.00
2.50 2.50
2.00 T P P P P P P P P P P R R R R R R R 2.00
1.50 T T H H H H H H H H H H H H H H H H H 1.50
1.25 1.25
1.00 T T H H H H H H H H H H H H H H H H H H 1.00
0.75 T T T H H H H H H H H H H H H H H H H H H 0.75
0.50 T T T T H H H H H H H H H H H H H H H H H H 0.50
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
26.00
28.00
30.00
32.00
34.00
36.00
1.00
1.25
1.50
2.00
2.50
3.00
3.50
4.00
5.00
6.00
8.00
.50
.75
CODE DESCRIPTION
F SADDLE FUSED JT T TEES J THREADOLET
H H. COUPLING W WELDOLETS
S SOCKOLETS L SWEEPOLET
Package : IPMCS
Report No. : 50 A2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 14 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
PIP PIPE 1 1.5 XS B-36.10 ASTM A 106 GR.B PE, SEAMLESS PI21977Z1
PIP PIPE 3 14 STD B-36.10 ASTM A 106 GR.B BE, SEAMLESS PI21917Z1
NIP NIPPLE 1 1.5 M B-36.10 ASTM A 106 GR.B PBE, SEAMLESS PN21967Z1
Flange Group
FLG FLNG.WN .5 1.5 M B-16.5 ASTM A 105 150, RF/125AARH FWC0127Z1
Package
Report No.
: IPMCS
: 50
A2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 15 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
A2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 16 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Valves Group
GAV VLV.GATE .5 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 51002ZZZ1
15761 105,TRIM- 16.11, SHT NO.- 51002
STELLITED,STEM-
13%CR STEEL
GAV VLV.GATE 2 36 API 600/ ISO BODY-ASTM A 216 FLGD, 150, B-16.5, 51302ZZZ1 92
10434 GR.WCB,TRIM- RF/125AARH, SHT
13% CR STEEL NO.- 51302
GLV VLV.GLOBE .5 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 52002ZZZ1
15761 105,TRIM- 16.11, SHT NO.- 52002
STELLITED,STEM-
13%CR.STEEL
GLV VLV.GLOBE 2 16 BS-1873 BODY-ASTM A 216 FLGD, 150, B-16.5, 52302ZZZ1
GR.WCB,TRIM- RF/125AARH, SHT
13% CR STEEL NO.- 52302
CHV VLV.CHECK .5 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 53002ZZZ1
15761 105,TRIM- 16.11, SHT NO.- 53002
STELLITED
CHV VLV.CHECK 2 24 BS-1868 BODY-ASTM A 216 FLGD, 150, B-16.5, 53302ZZZ1
GR.WCB,TRIM- RF/125AARH, SHT
13% CR STEEL NO.- 53302
BLV VLV.BALL .5 1.5 BS EN ISO BODY-ASTM A 105 FLGD, 150, B-16.5, 54302ZZZ1
17292 /A RF/125AARH, SHT
216GR.WCB,TRIM- NO.- 54302
BODY SEAT-PEEK
G3V VLV.PISTON .5 1 MNF'STD BODY-ASTM A 216 SW, 300, 3000, B- 64402ZZZ1
GR.WCB,TRIM- 16.11, SHT NO.- 64402
13% CR.STEEL
Bolt Group
BOS BOLT.STUD .5 36 B-18.2 BOLT:A193 GR.B7, BS40404Z0
NUT:A194 GR.2H
Gasket Group
GAS GASKET .5 24 B-16.20- SP.WND SPIRAL, 150 GK66272Z0
ANSI B16.5 SS316+GRAFIL+ I
RING
GAS GASKET 26 36 B-16.20- SP.WND SPIRAL, 150 GK56272Z0
ANSI SS316+GRAFIL+ I
B16.47B RING
Trap/Strainer Group
TRP TRAP.STEAM .5 1.5 MNF'STD B:A105;T:13%CR;S: FLGD, THRMDNMC, TR3065531
SS304 150,RF/125AARH
TSR STRNR.TEMP 1.5 24 EIL'STD B:A516GR.70;INT:S CONETYPE, ST16831Z1
S304 150,FF/125AARH
PSR STRNR.PERM .5 1.5 MNF'STD B:A105;INT:SS304 SW, Y-TYPE, 800 SP303D511
Package
Report No.
: IPMCS
: 50
A2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 17 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
A2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 18 of 58
SERVICE
NON CORROSIVE UTILITIES (ABOVE GROUND) CATEGORY "D" FLUID - COOLING WATER, INSTRUMENT AIR(2" & ABOVE),
PLANT AIR, INERT GAS, CARBON DI OXIDE (DRY), NITROGEN, CONDENSATE & BOILER FEED SUCTION (NON IBR). THIS
CLASS DOES NOT COVER UNDERGROUND PIPING AND THE FIRE WATER SERVICE. FOR SIZES ABOVE 30",
TEMPERATURE AND PRESSURE RATINGS SHALL BE 70 DEG.C & 10.0 KG/CM2G RESPECTIVELY.
NOTES
1 NDT REQUIREMENTS AS PER EIL STANDARD SPECIFICATION 6-44-0016.
6 FOR FABRICATED REDUCERS,REFER EIL'STD 7-44-0485 & 7-44-0487. FOR MITRES, REFER EIL'STD 7-44-0033.
18 FOR SIZES ABOVE 30", TEMPERATURE AND PRESSURE RATINGS SHALL BE 70 DEG.C & 10KG/CM2G RESPECTIVELY.
31 USE BUTTERFLY VALVES INSTEAD OF GATE VALVES FROM 10" ONWARDS IN WATER SERVICE AND UPTO 70 DEG C.
DESIGN PRESSURE FOR BUTTERFLY VALVES IS LIMITED UPTO 10 BAR.
32 CORROSION ALLOWANCE HAS BEEN ADJUSTED TO SELECT OPTIMUM SCH. REFER GENERAL NOTES TO PMS.
65 FORGINGS ARE ACCEPTABLE IN LIEU OF PLATE MATERIAL FOR BLIND FLANGES AND SPACER & BLINDS.
76 FOR PERMANENT BW STRAINERS,REFER EIL'STD 7-44-0303 & 7-44-0304; AND FOR TEMPORARY STRAINERS,REFER
EIL'STD 7-44-0300.
77 FOR SIZES > 24", SPACER & BLIND SHALL BE AS PER EIL'STD 7-44-0164.
79 BLIND FLANGES SPECIFIED TO MANUFACTURER'S STANDARD AND CAPS TO ASME SEC VIII SHALL BE DESIGNED
FOR 70 DEG.C AND 10.0 KG/CM2G. BLIND FLANGES TO SUIT 150#, FF, 125AARH, AWWA C207 CL.D FLANGES.
86 BUTTERFLY VALVES FOR THE SPEC ARE PN10 RATED WITH A MAXIMUM PRESSURE OF 10.2 KG/CM2G.
97 USE 5 PIECES 90 DEG MITRE FOR SIZE(S) 16 - 18, 24, 38; 6 PIECES 90 DEG MITRE FOR SIZE(S) 20, 26, 32, 40, 46 - 50, 54 -
58, 64- 66, 72-74 ; 7 PIECES 90 DEG MITRE FOR SIZE(S) 28, 30, 34, 36, 42, 44, 52, 60, 62, 68, 70, 76 - 80; 45 DEG MITRE
REQUIRES ONE PIECE LESS
Package : IPMCS
Report No. : 50 A39A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 19 of 58
SPECIAL NOTES
ON LINES >= 2.0" 0.75" OR AS PER P&ID. REFER EIL STD. 7-44-351, D4
ON LINES >= 2.0" 0.75" OR AS PER P&ID. REFER EIL STD 7-44-351, V1
PRESS.CONN 0.75" SW, SH HVY NIPPLE WITH GATE VALVE TO SPEC AS PER EIL STD
7-44-354
Package : IPMCS
Report No. : 50
84.00
80.00
76.00
72.00
70.00
68.00
66.00 T
64.00 T R
62.00 T R R
60.00 T R R R
58.00 T R R R R
56.00 T R R R R R
54.00 T R R R R R R
52.00 T R R R R R R R
50.00 T R R R R R R R R
48.00 T R R R R R R R R R
46.00 T R R R R R R R R R R
44.00 T R R R R R R R R R R R
BRANCH PIPE ( SIZE IN INCHES)
42.00 T R R R R R R R R R R R R
40.00 T R R R R R R R R R R R R R
38.00 T R R R R R R R R R R R R R R
36.00 T R R R R R R R R R R R R R R R
34.00 T R R R R R R R R R R R R R R R R
32.00 T R R P R R R R R R R R R R R R R R
30.00 T R R R R R R R R R R R R R R R R R R
28.00 T R R R R P R R R R R R R R R R R R R R
26.00 T R R R R R P R R R R R R R R R R R R R R
24.00 T R R R R R R P R R R R R R R R R R R R R R
22.00
20.00 T P R R R R R R P R R R R R R R R R R R R R R
18.00 T R P R R R R R R P R R R R R R R R R R R R R R
16.00 T P R P R R R R R R P R R R R R R R R R R R R R R
14.00 T P P P P P R R P R R P P R R P R R R P R R R R R R
12.00 T P P P P P P R R P R R P P R R P R R R P R R R R R R
10.00 T P P P P P P P R R P R R P P R R P P R R P R R R R R R
8.00 T P P P P P P P P R R P R R P P R R P P R R P R R R R R R
6.00 T P P P P P P P P P R R P R R P P R R P R R R P R R R R R R
5.00
4.00 T P P P P P P P P P P R R P R R P P R R P R R R P R R R R R R
3.50
3.00 T P P P P P P P P P P P R R P R R P P R R P P R R P R R R R R R
2.50
2.00 T P P P P P P P P P P P P P R P P P P P P R P P P R P P R R R P R
1.50 T T H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H
1.25
1.00 T T H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H
0.75 T T T H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H
0.50 T T T T H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
26.00
28.00
30.00
32.00
34.00
36.00
38.00
40.00
42.00
44.00
46.00
48.00
50.00
52.00
54.00
56.00
58.00
60.00
62.00
64.00
66.00
1.00
1.25
1.50
2.00
2.50
3.00
3.50
4.00
5.00
6.00
8.00
.50
.75
CODE DESCRIPTION
F SADDLE FUSED JT T TEES J THREADOLET
H H. COUPLING W WELDOLETS
S SOCKOLETS L SWEEPOLET
Package : IPMCS
Report No. : 50 A39A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 21 of 58
84.00
80.00
76.00
T 72.00
T R 70.00
T R R 68.00
R R R 66.00
R R R 64.00
R R R 62.00
R R R 60.00
R R R 58.00
R R R 56.00
R R R 54.00
R R R 52.00
R R R 50.00
R R R 48.00
R R R 46.00
R R R 44.00
BRANCH PIPE (SIZE IN INCHES)
R R R 42.00
R R R 40.00
R R R 38.00
R R R 36.00
R R R 34.00
R R R 32.00
R R R 30.00
R R R 28.00
R R R 26.00
R R R 24.00
22.00
R R R 20.00
R R R 18.00
R R R 16.00
R R R 14.00
R R R 12.00
R R R 10.00
R R R 8.00
R R R 6.00
5.00
R R R 4.00
3.50
R R R 3.00
2.50
R R P 2.00
H H H 1.50
1.25
H H H 1.00
H H H 0.75
H H H 0.50
68.00
70.00
72.00
Package : IPMCS
Report No. : 50 A39A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 22 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
PIP PIPE 1 1.5 XS B-36.10 ASTM A 106 GR.B PE, SEAMLESS PI21977Z0
PIP PIPE 3 14 STD B-36.10 ASTM A 106 GR.B BE, SEAMLESS PI21917Z0
NIP NIPPLE .5 .75 M B-36.10 ASTM A 106 GR.B PBE, SEAMLESS PN21967Z0
NIP NIPPLE 1 1.5 M B-36.10 ASTM A 106 GR.B PBE, SEAMLESS PN21967Z0
Flange Group
FLG FLNG.SW .5 1.5 M B-16.5 ASTM A 105 150, RF/125AARH FSC0127Z0
Package
Report No.
: IPMCS
: 50
A39A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 23 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
A39A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 24 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
A39A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 25 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Valves Group
GAV VLV.GATE .25 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 51001ZZZ0
15761 105,TRIM- 16.11, SHT NO.- 51001
STELLITED,STEM-
13%CR.STEEL
GAV VLV.GATE 2 24 API 600/ ISO BODY-ASTM A 216 FLGD, 150, B-16.5, 51321ZZZ0
10434 GR.WCB,TRIM- RF/125AARH, SHT
13% CR.STEEL NO.- 51321
GLV VLV.GLOBE .25 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 52001ZZZ0
15761 105,TRIM- 16.11, SHT NO.- 52001
STELLITED,STEM-
13%CR STEEL
GLV VLV.GLOBE 2 16 BS-1873 BODY-ASTM A 216 FLGD, 150, B-16.5, 52321ZZZ0
GR.WCB,TRIM- RF/125AARH, SHT
13% CR.STEEL NO.- 52321
CHV VLV.CHECK .25 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 53001ZZZ0
15761 105,TRIM- 16.11, SHT NO.- 53001
STELLITED
CHV VLV.CHECK 2 24 BS 1868 BODY-ASTM A 216 FLGD, 150, B-16.5, 53321ZZZ0
GR.WCB,TRIM- RF/125AARH, SHT
13% CR.STEEL NO.- 53321
CHV VLV.CHECK 26 48 API-594 BODY-ASTM A 105 FLGD, 150, 53316ZZZ0
/A AWWAC207,
216GR.WCB,TRIM- FF/125AARH, SHT
13% CR.STEEL NO.- 53316
BLV VLV.BALL .5 16 BS EN ISO BODY-ASTM A 105 FLGD, 150, B-16.5, 54321ZZZ0
17292 /A RF/125AARH, SHT
216GR.WCB,TRIM- NO.- 54321
BODY SEAT-
RPTFE
BFV VLV.BTRFLY 3 24 BS EN 593 BODY-ASTM A 216 WAFL, 150, B-16.5, 56321ZZZ0
GR.WCB,TRIM- WAF/125AARH, SHT
13% CR.STEEL NO.- 56321
BFV VLV.BTRFLY 26 48 BS EN 593 BODY-ASTM A 216 FLGD, 150, 56316ZZZ0
GR.WCB,TRIM- AWWAC207,
13% CR.STEEL FF/125AARH, SHT
NO.- 56316
Bolt Group
BOS BOLT.STUD 18 80 B-18.2 BOLT:A193 GR.B7, BS40404Z0
NUT:A194 GR.2H
BOM BOLT.M/C .5 16 B-18.2 BOLT:A307 GR.B, BM41418Z0
NUT:A563 GR.B
Gasket Group
GAS GASKET .5 24 B-16.21- NONASBESTOS RING, 150, 2 MM GKBAX52Z0
ANSI B16.5 BS7531 GR X
Package
Report No.
: IPMCS
: 50
A39A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 26 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
A39A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 27 of 58
SERVICE
NON CORROSIVE UTILITIES (ABOVE GROUND) CATEGORY "D" FLUID - COOLING WATER, INSTRUMENT AIR(2" & ABOVE-
IN OFFISTES), PLANT AIR, INERT GAS, CARBON DI OXIDE (DRY), NITROGEN, CONDENSATE & BOILER FEED SUCTION
(NON IBR). THIS CLASS DOES NOT COVER UNDERGROUND PIPING AND THE FIRE WATER SERVICE. FOR SIZES ABOVE
30", TEMPERATURE AND PRESSURE RATINGS SHALL BE 70 DEG.C & 7.0 KG/CM2G RESPECTIVELY.
NOTES
1 NDT REQUIREMENTS AS PER EIL STANDARD 6-44-0016.
6 FOR FABRICATED REDUCERS,REFER EIL'STD 7-44-0485 & 7-44-0487. FOR MITRES, REFER EIL'STD 7-44-0033.
10 USE 5 PIECES 90 DEG MITRE FOR SIZE(S) 16 - 18, 24, 32 - 40, 44 - 50, 54 - 60, 64-70; 6 PIECES 90 DEG MITRE FOR SIZE(S)
20, 26, 42, 52, 62, 72 - 76 ; 7 PIECES 90 DEG MITRE FOR SIZE(S) 28, 30, 80; 45 DEG MITRE REQUIRES ONE PIECE LESS
31 USE BUTTERFLY VALVES INSTEAD OF GATE VALVES FROM 10" ONWARDS IN WATER SERVICE AND UPTO 70 DEG C.
DESIGN PRESSURE FOR BUTTERFLY VALVES IS LIMITED UPTO 10 BAR.
32 CORROSION ALLOWANCE HAS BEEN ADJUSTED TO SELECT OPTIMUM SCH. REFER GENERAL NOTES TO PMS.
65 FORGINGS ARE ACCEPTABLE IN LIEU OF PLATE MATERIAL FOR BLIND FLANGES AND SPACER & BLINDS.
76 FOR PERMANENT BW STRAINERS,REFER EIL'STD 7-44-0303 & 7-44-0304; AND FOR TEMPORARY STRAINERS,REFER
EIL'STD 7-44-0300.
77 FOR SIZES > 24", SPACER & BLIND SHALL BE DESIGNED BY THE MANUFACTURER AS PER ASME B31.3.
86 BUTTERFLY VALVES FOR THE SPEC ARE PN10 RATED WITH A MAXIMUM PRESSURE OF 10.2 KG/CM2G.
98 FOR SIZES ABOVE 30", TEMPERATURE AND PRESSURE RATINGS SHALL BE 70 DEG.C & 7.0 KG/CM2G RESPECTIVELY.
99 BLIND FLANGES AND SPACER & BLINDS SPECIFIED TO MANUFACTURER'S STANDARD SHALL BE DESIGNED FOR 70
DEG.C AND 7.0 KG/CM2G TO SUIT 150#, FF, 125AARH, AWWA C207 CL.D FLANGES.
SPECIAL NOTES
ON LINES >= 2.0" 0.75" OR AS PER P&ID. REFER EIL STD. 7-44-351, D4
ON LINES >= 2.0" 0.75" OR AS PER P&ID. REFER EIL STD 7-44-351, V1
PRESS.CONN 0.75" SW, SH HVY NIPPLE WITH GATE VALVE TO SPEC AS PER EIL STD
7-44-354
Package : IPMCS
Report No. : 50 A3A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 28 of 58
84.00
80.00
76.00
72.00
70.00
68.00
66.00 T
64.00 T P
62.00 T P P
60.00 T P P P
58.00 T P P P P
56.00 T P P P P
54.00 T P P P P P
52.00 T P P P P P P
50.00 T P P P P P P P
48.00 T P P P P P P P P
46.00 T P P P P P P P P P
44.00 T P P P P P P P P P P
BRANCH PIPE ( SIZE IN INCHES)
42.00 T P P P P P P P P P P P
40.00 T P P P P P P P P P P P P
38.00 T P P P P P P P P P P P P P
36.00 T P P P P P P P P P P P P P P
34.00 T P P P P P P P P P P P P P P P
32.00 T P P P P P P P P P P P P P P P P
30.00 T P P P P P P P P P P P P P P P P P
28.00 T R P P P P P P P P P P P P P P P P P
26.00 T R R P P P P P P P P P P P P P P P P P
24.00 T R R R P P P P P P P P P P P P P P P P P
22.00
20.00 T P R R R P P P P P P P P P P P P P P P P P
18.00 T R P R R R P P P P P P P P P P P P P P P P P
16.00 T P R P R R R P P P P P P P P P P P P P P P P P
14.00 T P P P P P R R P P P P P P P P P P P P P P P P P
12.00 T P P P P P P R R P P P P P P P P P P P P P P P P P
10.00 T P P P P P P P R R P P P P P P P P P P P P P P P P P
8.00 T P P P P P P P P R R P P P P P P P P P P P P P P P P P
6.00 T P P P P P P P P P R R P P P P P P P P P P P P P P P P P
5.00
4.00 T P P P P P P P P P P R R P P P P P P P P P P P P P P P P P
3.50
3.00 T P P P P P P P P P P P R R P P P P P P P P P P P P P P P P P
2.50
2.00 T P P P P P P P P P P P P P R P P P P P P P P P P P P P P P P P
1.50 T T H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H
1.25
1.00 T T H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H
0.75 T T T H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H
0.50 T T T T H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
26.00
28.00
30.00
32.00
34.00
36.00
38.00
40.00
42.00
44.00
46.00
48.00
50.00
52.00
54.00
56.00
58.00
60.00
62.00
64.00
66.00
1.00
1.25
1.50
2.00
2.50
3.00
3.50
4.00
5.00
6.00
8.00
.50
.75
CODE DESCRIPTION
F SADDLE FUSED JT T TEES J THREADOLET
H H. COUPLING W WELDOLETS
S SOCKOLETS L SWEEPOLET
Package : IPMCS
Report No. : 50 A3A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 29 of 58
84.00
80.00
76.00
T 72.00
T P 70.00
T P P 68.00
P P P 66.00
P P P 64.00
P P P 62.00
P P P 60.00
P P P 58.00
P P P 56.00
P P P 54.00
P P P 52.00
P P P 50.00
P P P 48.00
P P P 46.00
P P P 44.00
BRANCH PIPE (SIZE IN INCHES)
P P P 42.00
P P P 40.00
P P P 38.00
P P P 36.00
P P P 34.00
P P P 32.00
P P P 30.00
P P P 28.00
P P P 26.00
P P P 24.00
22.00
P P P 20.00
P P P 18.00
P P P 16.00
P P P 14.00
P P P 12.00
P P P 10.00
P P P 8.00
P P P 6.00
5.00
P P P 4.00
3.50
P P P 3.00
2.50
P P P 2.00
H H H 1.50
1.25
H H H 1.00
H H H 0.75
H H H 0.50
68.00
70.00
72.00
Package : IPMCS
Report No. : 50 A3A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 30 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
PIP PIPE 1 1.5 XS B-36.10 ASTM A 106 GR.B PE, SEAMLESS PI21977Z0
PIP PIPE 3 14 STD B-36.10 ASTM A 106 GR.B BE, SEAMLESS PI21917Z0
NIP NIPPLE .5 .75 M B-36.10 ASTM A 106 GR.B PBE, SEAMLESS PN21967Z0
NIP NIPPLE 1 1.5 M B-36.10 ASTM A 106 GR.B PBE, SEAMLESS PN21967Z0
Flange Group
FLG FLNG.SW .5 1.5 M B-16.5 ASTM A 105 150, RF/125AARH FSC0127Z0
Package
Report No.
: IPMCS
: 50
A3A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 31 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
A3A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 32 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Valves Group
GAV VLV.GATE .25 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 51001ZZZ0
15761 105,TRIM- 16.11, SHT NO.- 51001
STELLITED,STEM-
13%CR.STEEL
GAV VLV.GATE 2 24 API 600/ ISO BODY-ASTM A 216 FLGD, 150, B-16.5, 51321ZZZ0
10434 GR.WCB,TRIM- RF/125AARH, SHT
13% CR.STEEL NO.- 51321
GLV VLV.GLOBE .25 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 52001ZZZ0
15761 105,TRIM- 16.11, SHT NO.- 52001
STELLITED,STEM-
13%CR STEEL
GLV VLV.GLOBE 2 16 BS-1873 BODY-ASTM A 216 FLGD, 150, B-16.5, 52321ZZZ0
GR.WCB,TRIM- RF/125AARH, SHT
13% CR.STEEL NO.- 52321
CHV VLV.CHECK .25 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 53001ZZZ0
15761 105,TRIM- 16.11, SHT NO.- 53001
STELLITED
CHV VLV.CHECK 2 24 BS 1868 BODY-ASTM A 216 FLGD, 150, B-16.5, 53321ZZZ0
GR.WCB,TRIM- RF/125AARH, SHT
13% CR.STEEL NO.- 53321
CHV VLV.CHECK 26 48 API-594 BODY-ASTM A 105 FLGD, 150, 53316ZZZ0
/A AWWAC207,
216GR.WCB,TRIM- FF/125AARH, SHT
13% CR.STEEL NO.- 53316
Package
Report No.
: IPMCS
: 50
A3A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 33 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
A3A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 34 of 58
SERVICE
DEMINERALISED WATER (OUTSIDE DM PLANT BATTERY LIMITS), POLISHED WATER, POLISHED CONDENSATE,
INSTRUMENT AIR(WITHIN UNITS ICLUDING OFFSITE PACKAGES) - CATEGORY 'D'
NOTES
1 NDT REQUIREMENTS AS PER EIL STANDARD 6-44-0016.
5 FOR PERMANENT 'T' TYPE BW STRAINERS,REFER EIL'STD 7-44-0303 & 7-44-0304; AND FOR TEMPORARY
STRAINERS,REFER EIL'STD 7-44-0300; FOR SPACER AND BLIND REFER EIL'STD 7-44-0162.
7 FOR RESTRICTION ON USE OF BALL,PLUG & BUTTERFLY VALVES,REFER GENERAL NOTES.
21 NO FIELD HYDROSTATIC TESTING IS PERMITTED IN INSTRUMENT AIR SERVICE.
SPECIAL NOTES
ON LINES >= 2.0" AS PER P&ID. OR 0.75". REFER EIL STD. 7-44-0351, D3
ON LINES >= 2.0" AS PER P&ID. OR 0.75". REFER EIL STD 7-44-0351, V1
PRESS.CONN 0.75" SW NIPPLE WITH VALVE TO SPEC AS PER EIL STD 7-44-0354
Package : IPMCS
Report No. : 50 A3K
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 35 of 58
84.00 84.00
80.00 80.00
76.00 76.00
72.00 72.00
70.00 70.00
68.00 68.00
66.00 66.00
64.00 64.00
62.00 62.00
60.00 60.00
58.00 58.00
56.00 56.00
54.00 54.00
52.00 52.00
50.00 50.00
48.00 48.00
46.00 46.00
44.00 44.00
BRANCH PIPE (SIZE IN INCHES)
BRANCH PIPE ( SIZE IN INCHES)
42.00 42.00
40.00 40.00
38.00 38.00
36.00 36.00
34.00 34.00
32.00 32.00
30.00 30.00
28.00 28.00
26.00 26.00
24.00 24.00
22.00 22.00
20.00 20.00
18.00 18.00
16.00 16.00
14.00 T 14.00
12.00 T P 12.00
10.00 T P P 10.00
8.00 T P P P 8.00
6.00 T P P P P 6.00
5.00 5.00
4.00 T P P P P P 4.00
3.50 3.50
3.00 T P P P P P P 3.00
2.50 2.50
2.00 T P P P P P P P 2.00
1.50 T T H H H H H H H 1.50
1.25 1.25
1.00 T T H H H H H H H H 1.00
0.75 T T T H H H H H H H H 0.75
0.50 T T T T H H H H H H H H 0.50
10.00
12.00
14.00
1.00
1.25
1.50
2.00
2.50
3.00
3.50
4.00
5.00
6.00
8.00
.50
.75
CODE DESCRIPTION
F SADDLE FUSED JT T TEES J THREADOLET
H H. COUPLING W WELDOLETS
S SOCKOLETS L SWEEPOLET
Package : IPMCS
Report No. : 50 A3K
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 36 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
PIP PIPE 1 1.5 40S B-36.19 ASTM A 312 TP304 PE, SEAMLESS PI33577Z0
PIP PIPE 2 2 40S B-36.19 ASTM A 312 TP304 BE, SEAMLESS PI33517Z0
PIP PIPE 3 8 10S B-36.19 ASTM A 312 TP304 BE, SEAMLESS PI33517Z0
PIP PIPE 10 14 10S B-36.19 ASTM A 358 TP304 BE, E.FS.W PI35513Z0
CL.1
NIP NIPPLE .5 .75 M B-36.19 ASTM A 312 TP304 PBE, SEAMLESS PN33567Z0
NIP NIPPLE 1 1.5 M B-36.19 ASTM A 312 TP304 PBE, SEAMLESS PN33567Z0
Flange Group
FLG FLNG.WN .5 14 M B-16.5 ASTM A 182 150, RF/125AARH FWC4127Z0
GR.F304
FLB FLNG.BLIND .5 14 B-16.5 ASTM A 182 150, RF/125AARH FBC4127Z0
GR.F304
FEF FLNG.FIG.8 .5 8 ASME- ASTM A 182 150, FF/125AARH FGK4121Z0
B16.48 GR.F304
FEF SPCR&BLND 10 14 ASME- ASTM A 182 150, FF/125AARH FCK4121Z0
B16.48 GR.F304
Fitting Group
ELB90 ELBOW.90 .5 1.5 B-16.11 ASTM A 182 SW, 3000 WA642D2Z0
GR.F304
ELB90 ELBOW.90 2 8 M B-16.9 ASTM A 403 BW, 1.5D WAG874Z10
GR.WP304-S
ELB90 ELBOW.90 10 14 M B-16.9 ASTM A 403 BW, 1.5D WAG894Z10
GR.WP304-WX
ELB45 ELBOW.45 .5 1.5 B-16.11 ASTM A 182 SW, 3000 WB642D2Z0
GR.F304
ELB45 ELBOW.45 2 8 M B-16.9 ASTM A 403 BW, 1.5D WBG874Z10
GR.WP304-S
ELB45 ELBOW.45 10 14 M B-16.9 ASTM A 403 BW, 1.5D WBG894Z10
GR.WP304-WX
TEQ T.EQUAL .5 1.5 B-16.11 ASTM A 182 SW, 3000 WE642D2Z0
GR.F304
TEQ T.EQUAL 2 8 M B-16.9 ASTM A 403 BW WEG874ZZ0
GR.WP304-S
TEQ T.EQUAL 10 14 M B-16.9 ASTM A 403 BW WEG894ZZ0
GR.WP304-WX
TRED T.RED .5 1.5 B-16.11 ASTM A 182 SW, 3000 WR642D2Z0
GR.F304
TRED T.RED 2 8 M, M B-16.9 ASTM A 403 BW WRG874ZZ0
GR.WP304-S
Package
Report No.
: IPMCS
: 50
A3K
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 37 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
A3K
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 38 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
A3K
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 39 of 58
SERVICE
UTILITIES -MP CONDENSATE, INSTRUMENT AIR(OFFSITES), PLANT AIR, NITROGEN, AMMONIA GAS ETC. ABOVE CLASS
'A1A'.
NOTES
1 NDT REQUIREMENTS AS PER EIL STANDARD 6-44-0016.
3 USE PIPE OF CLASS 22 INSTEAD OF CLASS 12 IF PIPE THICKNESS EXCEEDS 25.00 MM.
5 FOR PERMANENT 'T' TYPE BW STRAINERS,REFER EIL'STD 7-44-0303 & 7-44-0304; AND FOR TEMPORARY
STRAINERS,REFER EIL'STD 7-44-0300; FOR SPACER AND BLIND REFER EIL'STD 7-44-0162.
7 FOR RESTRICTION ON USE OF BALL,PLUG & BUTTERFLY VALVES,REFER GENERAL NOTES.
32 CORROSION ALLOWANCE HAS BEEN ADJUSTED TO SELECT OPTIMUM SCH. REFER GENERAL NOTES TO PMS.
SPECIAL NOTES
ON LINES >= 2.0" AS PER P&ID OR 0.75". REFER EIL STD. 7-44-0351, D4
ON LINES >= 2.0" AS PER P&ID OR 0.75". REFER EIL STD 7-44-0351, V4
PRESS.CONN 0.75" SW NIPPLE WITH VALVE TO SPEC AS PER EIL STD 7-44-0354
Package : IPMCS
Report No. : 50 B1A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 40 of 58
84.00 84.00
80.00 80.00
76.00 76.00
72.00 72.00
70.00 70.00
68.00 68.00
66.00 66.00
64.00 64.00
62.00 62.00
60.00 60.00
58.00 58.00
56.00 56.00
54.00 54.00
52.00 52.00
50.00 50.00
48.00 48.00
46.00 46.00
44.00 44.00
42.00 42.00
40.00 40.00
38.00 38.00
36.00 36.00
34.00 34.00
32.00 32.00
30.00 30.00
28.00 28.00
26.00 26.00
24.00 T 24.00
22.00 22.00
20.00 T R 20.00
18.00 T R R 18.00
16.00 T R R R 16.00
14.00 T R R R R 14.00
12.00 T R R R R R 12.00
10.00 T R R R R R R 10.00
8.00 T R R R R R R R 8.00
6.00 T R R R R R R R R 6.00
5.00 5.00
4.00 T R R R R R R R R R 4.00
3.50 3.50
3.00 T P R R R R R R R R R 3.00
2.50 2.50
2.00 T P P R R R R R R R R R 2.00
1.50 T T H H H H H H H H H H H 1.50
1.25 1.25
1.00 T T H H H H H H H H H H H H 1.00
0.75 T T T H H H H H H H H H H H H 0.75
0.50 T T T T H H H H H H H H H H H H 0.50
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
1.00
1.25
1.50
2.00
2.50
3.00
3.50
4.00
5.00
6.00
8.00
.50
.75
CODE DESCRIPTION
F SADDLE FUSED JT T TEES J THREADOLET
H H. COUPLING W WELDOLETS
S SOCKOLETS L SWEEPOLET
Package : IPMCS
Report No. : 50 B1A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 41 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
PIP PIPE 1 1.5 XS B-36.10 ASTM A 106 GR.B PE, SEAMLESS PI21977Z0
PIP PIPE 3 14 STD B-36.10 ASTM A 106 GR.B BE, SEAMLESS PI21917Z0
NIP NIPPLE 1 1.5 M B-36.10 ASTM A 106 GR.B PBE, SEAMLESS PN21967Z0
Flange Group
FLG FLNG.SW .5 1.5 M B-16.5 ASTM A 105 300, RF/125AARH FSC0147Z0
Package
Report No.
: IPMCS
: 50
B1A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 42 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Valves Group
GAV VLV.GATE .25 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 51001ZZZ0
15761 105,TRIM- 16.11, SHT NO.- 51001
Package
Report No.
: IPMCS
: 50
B1A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 43 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
B1A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 44 of 58
SERVICE
STEAM, BOILER FEED WATER & CONDENSATE - ALL IBR
NOTES
1 NDT REQUIREMENTS AS PER EIL STANDARD 6-44-0016.
3 USE PIPE OF CLASS 22 INSTEAD OF CLASS 12 IF PIPE THICKNESS EXCEEDS 25.00 MM.
5 FOR PERMANENT 'T' TYPE BW STRAINERS,REFER EIL'STD 7-44-0303 & 7-44-0304; AND FOR TEMPORARY
STRAINERS,REFER EIL'STD 7-44-0300; FOR SPACER AND BLIND REFER EIL'STD 7-44-0162.
8 ALL PIPES,FITTINGS,VALVES,FLANGES,TRAPS AND STRAINERS SHALL BE TESTED AND TEST CERTIFICATE IN FORM
III A FOR PIPE AND FORM III C FOR OTHERS SHALL BE REQD. DULY COUNTERSIGNED BY IBR AUTHORITY OR ITS
APPROVED REPRESENTATIVE.
9 CARBON CONTENT SHALL NOT EXCEED 0.25% FOR ALL PIPES,FITTINGS FLANGES ETC. THAT MAY REQUIRE
WELDING. MOREOVER,FOR FLANGES THE SULPHUR AND PHOSPHOROUS SHALL ALSO BE LIMITED TO 0.05% EACH.
32 CORROSION ALLOWANCE HAS BEEN ADJUSTED TO SELECT OPTIMUM SCH. REFER GENERAL NOTES TO PMS.
SPECIAL NOTES
ON LINES >= 2.0" AS PER P&ID OR 0.75". REFER EIL STD. 7-44-0351, D4
ON LINES >= 2.0" AS PER P&ID OR 0.75". REFER EIL STD 7-44-0351, V4
PRESS.CONN 0.75" SW NIPPLE WITH VALVE TO SPEC AS PER EIL STD 7-44-0354
Package : IPMCS
Report No. : 50 B2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 45 of 58
84.00 84.00
80.00 80.00
76.00 76.00
72.00 72.00
70.00 70.00
68.00 68.00
66.00 66.00
64.00 64.00
62.00 62.00
60.00 60.00
58.00 58.00
56.00 56.00
54.00 54.00
52.00 52.00
50.00 50.00
48.00 48.00
46.00 46.00
44.00 44.00
42.00 42.00
40.00 40.00
38.00 38.00
36.00 36.00
34.00 34.00
32.00 32.00
30.00 30.00
28.00 28.00
26.00 26.00
24.00 T 24.00
22.00 22.00
20.00 T R 20.00
18.00 T R R 18.00
16.00 T R R R 16.00
14.00 T R R R R 14.00
12.00 T R R R R R 12.00
10.00 T R R R R R R 10.00
8.00 T R R R R R R R 8.00
6.00 T R R R R R R R R 6.00
5.00 5.00
4.00 T R R R R R R R R R 4.00
3.50 3.50
3.00 T R R R R R R R R R R 3.00
2.50 2.50
2.00 T P P R R R R R R R R R 2.00
1.50 T T H H H H H H H H H H H 1.50
1.25 1.25
1.00 T T H H H H H H H H H H H H 1.00
0.75 T T T H H H H H H H H H H H H 0.75
0.50 T T T T H H H H H H H H H H H H 0.50
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
1.00
1.25
1.50
2.00
2.50
3.00
3.50
4.00
5.00
6.00
8.00
.50
.75
CODE DESCRIPTION
F SADDLE FUSED JT T TEES J THREADOLET
H H. COUPLING W WELDOLETS
S SOCKOLETS L SWEEPOLET
Package : IPMCS
Report No. : 50 B2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 46 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
PIP PIPE 1 1.5 XS B-36.10 ASTM A 106 GR.B PE, SEAMLESS PI21977Z1
PIP PIPE 3 14 STD B-36.10 ASTM A 106 GR.B BE, SEAMLESS PI21917Z1
NIP NIPPLE 1 1.5 M B-36.10 ASTM A 106 GR.B PBE, SEAMLESS PN21967Z1
Flange Group
FLG FLNG.SW .5 1.5 M B-16.5 ASTM A 105 300, RF/125AARH FSC0147Z1
Package
Report No.
: IPMCS
: 50
B2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 47 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Valves Group
GAV VLV.GATE .5 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 51002ZZZ1
15761 105,TRIM- 16.11, SHT NO.- 51002
Package
Report No.
: IPMCS
: 50
B2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 48 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
B2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 49 of 58
SERVICE
STEAM (IBR), BOILER FEED WATER (IBR)
NOTES
1 NDT REQUIREMENTS AS PER EIL STANDARD 6-44-0016.
3 USE PIPE OF CLASS 22 INSTEAD OF CLASS 12 IF PIPE THICKNESS EXCEEDS 25.00 MM.
5 FOR PERMANENT 'T' TYPE BW STRAINERS,REFER EIL'STD 7-44-0303 & 7-44-0304; AND FOR TEMPORARY
STRAINERS,REFER EIL'STD 7-44-0300; FOR SPACER AND BLIND REFER EIL'STD 7-44-0162.
8 ALL PIPES,FITTINGS,VALVES,FLANGES,TRAPS AND STRAINERS SHALL BE TESTED AND TEST CERTIFICATE IN FORM
III A FOR PIPE AND FORM III C FOR OTHERS SHALL BE REQD. DULY COUNTERSIGNED BY IBR AUTHORITY OR ITS
APPROVED REPRESENTATIVE.
9 CARBON CONTENT SHALL NOT EXCEED 0.25% FOR ALL PIPES,FITTINGS FLANGES ETC. THAT MAY REQUIRE
WELDING. MOREOVER,FOR FLANGES THE SULPHUR AND PHOSPHOROUS SHALL ALSO BE LIMITED TO 0.05% EACH.
SPECIAL NOTES
ON LINES >= 2.0" AS PER P&ID OR 0.75". REFER EIL STD. 7-44-0351, D4
ON LINES >= 2.0" AS PER P&ID OR 0.75". REFER EIL STD 7-44-0351, V4
PRESS.CONN 0.75" SW NIPPLE WITH VALVE TO SPEC AS PER EIL STD 7-44-0354
Package : IPMCS
Report No. : 50 D2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 50 of 58
84.00 84.00
80.00 80.00
76.00 76.00
72.00 72.00
70.00 70.00
68.00 68.00
66.00 66.00
64.00 64.00
62.00 62.00
60.00 60.00
58.00 58.00
56.00 56.00
54.00 54.00
52.00 52.00
50.00 50.00
48.00 48.00
46.00 46.00
44.00 44.00
BRANCH PIPE (SIZE IN INCHES)
BRANCH PIPE ( SIZE IN INCHES)
42.00 42.00
40.00 40.00
38.00 38.00
36.00 36.00
34.00 34.00
32.00 32.00
30.00 30.00
28.00 28.00
26.00 26.00
24.00 24.00
22.00 22.00
20.00 20.00
18.00 18.00
16.00 16.00
14.00 14.00
12.00 T 12.00
10.00 T R 10.00
8.00 T R R 8.00
6.00 T R R R 6.00
5.00 5.00
4.00 T R R R R 4.00
3.50 3.50
3.00 T R R R R R 3.00
2.50 2.50
2.00 T R R R R R R 2.00
1.50 T T H H H H H H 1.50
1.25 1.25
1.00 T T H H H H H H H 1.00
0.75 T T T H H H H H H H 0.75
0.50 T T T T H H H H H H H 0.50
10.00
12.00
1.00
1.25
1.50
2.00
2.50
3.00
3.50
4.00
5.00
6.00
8.00
.50
.75
CODE DESCRIPTION
F SADDLE FUSED JT T TEES J THREADOLET
H H. COUPLING W WELDOLETS
S SOCKOLETS L SWEEPOLET
Package : IPMCS
Report No. : 50 D2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 51 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
PIP PIPE 1 1.5 XS B-36.10 ASTM A 106 GR.B PE, SEAMLESS PI21977Z1
PIP PIPE 3 3 STD B-36.10 ASTM A 106 GR.B BE, SEAMLESS PI21917Z1
PIP PIPE 10 12 S80 B-36.10 ASTM A 106 GR.B BE, SEAMLESS PI21917Z1
NIP NIPPLE .5 .75 M B-36.10 ASTM A 106 GR.B PBE, SEAMLESS PN21967Z1
NIP NIPPLE 1 1.5 M B-36.10 ASTM A 106 GR.B PBE, SEAMLESS PN21967Z1
Flange Group
FLG FLNG.SW .5 1.5 M B-16.5 ASTM A 105 600, RF/125AARH FSC0167Z1
Package
Report No.
: IPMCS
: 50
D2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 52 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Valves Group
GAV VLV.GATE .5 1.5 API 602/ ISO BODY-ASTM A SW, 800, 3000, B- 51002ZZZ1
15761 105,TRIM- 16.11, SHT NO.- 51002
Package
Report No.
: IPMCS
: 50
D2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 53 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
D2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 54 of 58
SERVICE
POTABLE WATER (ABOVE GROUND ONLY),
FIRE WATER-SPRINKLER SYSTEM AFTER ORIFICE, BURIED INSTRUMENT AIR LINE TO DELUGE VALVE
NOTES
1 NDT REQUIREMENTS AS PER EIL STANDARD 6-44-0016.
19 THREADED JOINTS SHALL BE MADE WITH 1" WIDTH PTFE JOINING TAPE.
20 SURFACES WHERE GALVANISING HAS BEEN BURNT OFF SHALL BE WIRE BRUSHED AND COLD GALVANISED WITH
ZINC COATING COMPOUND.
21 NO FIELD HYDROSTATIC TESTING IS PERMITTED IN INSTRUMENT AIR SERVICE.
SPECIAL NOTES
ON LINES >= 2.0" AS PER P&ID OR 0.75". REFER EIL STD. 7-44-0351, D3
ON LINES >= 2.0" AS PER P&ID OR 0.75". REFER EIL STD 7-44-0351, V3
PRESS.CONN 0.75" SCRD NIPPLE WITH VALVE TO SPEC AS PER EIL STD 7-44-0354
Package : IPMCS
Report No. : 50 J2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 55 of 58
84.00 84.00
80.00 80.00
76.00 76.00
72.00 72.00
70.00 70.00
68.00 68.00
66.00 66.00
64.00 64.00
62.00 62.00
60.00 60.00
58.00 58.00
56.00 56.00
54.00 54.00
52.00 52.00
50.00 50.00
48.00 48.00
46.00 46.00
44.00 44.00
BRANCH PIPE (SIZE IN INCHES)
BRANCH PIPE ( SIZE IN INCHES)
42.00 42.00
40.00 40.00
38.00 38.00
36.00 36.00
34.00 34.00
32.00 32.00
30.00 30.00
28.00 28.00
26.00 26.00
24.00 24.00
22.00 22.00
20.00 20.00
18.00 18.00
16.00 16.00
14.00 14.00
12.00 T 12.00
10.00 T P 10.00
8.00 T P P 8.00
6.00 T P P P 6.00
5.00 5.00
4.00 T T P P P 4.00
3.50 3.50
3.00 T T T P P P 3.00
2.50 2.50
2.00 T T T P P P P 2.00
1.50 T T T T H H H H 1.50
1.25 1.25
1.00 T T T T T H H H H 1.00
0.75 T T T T H H H H H H 0.75
0.50 T T T T T H H H H H H 0.50
10.00
12.00
1.00
1.25
1.50
2.00
2.50
3.00
3.50
4.00
5.00
6.00
8.00
.50
.75
CODE DESCRIPTION
F SADDLE FUSED JT T TEES J THREADOLET
H H. COUPLING W WELDOLETS
S SOCKOLETS L SWEEPOLET
Package : IPMCS
Report No. : 50 J2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 56 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
J2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 57 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
J2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
B215-6-44-0005 Rev. A
SPECIFICATION
Page 58 of 58
Note :(The shaded portion of PMS body shows Field Fabricated Items)
Package
Report No.
: IPMCS
: 50
J2A
Template No. 5-0000-0001-T2 Rev. Copyright EIL- All rights reserved
JOB SPECIFICATION No.
PIPING MATERIAL
SPECIFICATION EXTRACTS B215-6-44-0005-A2 Rev. A
Page 1 of 7
Client : ABRPL
Abbreviations:
CONTENTS
INDEX OF SPECIFICATIONS
A1A REV A , A2A REV A , A39A REV A , A3A REV A ,
A3K REV A , B1A REV A , B2A REV A , D2A REV A ,
J2A REV A
Package : IPMCS
Report No. : 56
PIPING MATERIAL CLASS : A1A REV : A GASKET MATERIAL : SP.WND SS316+GRAFIL+ I RING
PIPE MATERIAL : ASTM A 672 GR.B60 CL.12 FROM 16.000 TO 48.000
CORROSION ALLOWANCE : 01.50 MM
PIPE MATERIAL : ASTM A 106 GR.B FROM 00.500 TO 14.000
ANSI RATING : 150
Temp (deg. C) - 29.0 38.0 93.0 149.0 204.0 260.0 316.0 343.0 371.0
Press (Kg/sq. cm g) 20.03 20.03 18.28 16.17 14.06 11.95 9.84 8.78 7.73
Temp (deg. C) 0.0 38.0 93.0 149.0 204.0 260.0 280.0 300.0 371.0
Press (Kg/sq. cm g) 20.03 20.03 18.28 16.17 14.06 11.95 11.19 10.44 7.73
Package : IPMCS
Report No. : 56
Temp (deg. C) - 29.0 38.0 93.0 149.0 204.0 260.0 316.0 343.0 371.0 399.0 427.0
Press (Kg/sq. cm g) 52.02 52.02 47.80 46.05 44.64 42.53 40.07 38.66 37.26 35.50 28.82
Temp (deg. C) 0.0 38.0 93.0 149.0 204.0 260.0 316.0 343.0 371.0 399.0 427.0
Press (Kg/sq. cm g) 52.02 52.02 47.80 46.05 44.64 42.53 40.07 38.66 37.26 35.50 28.82
Temp (deg. C) 0.0 38.0 93.0 149.0 204.0 260.0 316.0 343.0 371.0 399.0 427.0
Press (Kg/sq. cm g) 104.05 104.05 95.60 92.09 88.92 84.71 79.79 77.33 74.52 71.35 58.00
Package : IPMCS
Report No. : 56
Package : IPMCS
Report No. : 56
Note:
1. Contractor to fill in the data sheet completely and submit for approval. Contractor may
furnish their own standard data sheet also for better understanding of their equipment,
including the minimum information mentioned/ sought in this data sheet.
2. Contractor shall also furnish the standard Vendor Data Sheet for the various Bought out
items.
1. BAMBOO CHIPPER(0105-SH-0002/0003)
Nos. of Chipper : 2
Type of chipper : Drum type
Capacity of Chipper : 73 TPH
Round Bamboo Size (Length X Diameter) : 2.1m (L) x 3 to 4 inch diameter
Chip Size : ≤ 25mm
MANUFACTURER’S DATA
General
Make :
Material Infeed Section :
Rotor Diameter :
No of knives :
Overall Dimension(LXWXH) :
Weight :
Motor Make :
Type :
KW @ rpm :
Frame size :
Qty. :
Reducer Make :
Type :
Reduction ratio :
Ratio :
Service factor :
Reducer Make :
Type :
Reduction ratio :
Ratio :
Service factor :
4. CHIP STORAGE
Stockpile Details
No. of stockpiles : One, Longitudinal type
Length : 90m (approx.)
Width : 50m (approx.)
Height : 12m (approx.)
Angle of Repose : 350 (Approx.)
No. of days of storage : 5
Storage Capacity : 26400 loose-m3
Chip Storage Shed detail
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
DATASHEET Doc. No.
FOR B215-000-80-43-DS-4505
RAW BAMBOO HANDLING PACKAGE Rev.2
(STATIC & MACHINERY EQUIPMENT) Page 4 of 14
Brakes
- Location :
- Type :
- Make :
- Braking torque :
e) Centralised Automatic Lubrication System
- Type :
- Make :
- Points lubricated (Contractor to specify) :
2
6. BELT CONVEYOR DATA
Sl.
Belt Conveyor no.
No.
0105- 0105- 0105-
Parameters CB- CB- 0105- 0105- 0105- CB- 0105-
0001/00 0003/000 CB- CB- CB- 0008A/ CB- 0105-CB-
02 4 0005 0006 0007 0008B 0009 0010
1. Rated Capacity, TPH 73 73 73 73 73 65 65 65
2. Design capacity, TPH 73 73 73 73 73 65 65 65
3. Belt Width, mm (minimum)
4. Trough Angle, degree 35
5. Carrying idlers diameter
(mm); 3-roll troughed type
6. Return idlers
type/diameter (mm)
7. Conveyor length, m
8. Approx conveyor lift , m
9. Approx belt speed, m/sec 2 2 2 2 2 2 2
10. Belt Type
11. Cover Grade
12. Top/Bottom cover
Thickness, mm (min)
13. Take up arrangement
MANUFACTURER’S DATA
Belt make :
Belt width (mm) :
Belt type :
Belt speed (m/sec.) :
No. of plies :
Allowable working tension :
Belt rating :
Top and bottom cover thickness, mm :
Cover Grade :
Belt factor of safety :
Total Belt length :
Type of Belt splicing :
Total Belt weight :
d) Conveyor Details
i) Motor
-Make :
-KW & RPM :
ii) Reducer
-Make :
-Type :
-Nominal ratio :
-Holdback : required
v) Brakes
- Location :
- Type :
- Make :
- Braking torque :
Capacity : 65 TPH
Required Granulometry of
Screened output : 25mm
Screen Efficiency :
MANUFACTURER’S DATA
Make/Model No.:
Type of Screen:
Size:
Size of Aperture:
Inclination:
Guaranteed Capacity , TPH:
Type of Mounting:
Screen Motion:
Total Screening Area, m²:
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
DATASHEET Doc. No.
FOR B215-000-80-43-DS-4505
RAW BAMBOO HANDLING PACKAGE Rev.2
(STATIC & MACHINERY EQUIPMENT) Page 8 of 14
Construction features
Screen Panel
- Type:
- Material:
Screen Frame
- Construction:
- Liner Plates Details:
- Feed Plate Details:
Vibrator
- Type:
- Frequency of Vibration:
- Amplitude of vibration:
Deck
- Type:
- Opening:
- Length:
- Fixing Detail:
Details of Lubrication:
Drive System
- Motor : make/KW
- V-belt : make/section/no.
Bearings
- Type/make
- Size
- Design load
- Design life
8. SHREDDER (0105-SH-0001)
Capacity : 10 TPH
Required Granulometry of
Screened output : 25mm
Screen Efficiency :
MANUFACTURER’S DATA
Deck
- Type:
- Opening:
- Length:
- Fixing Detail:
Details of Lubrication:
Drive System
- Motor : make/KW
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
DATASHEET Doc. No.
FOR B215-000-80-43-DS-4505
RAW BAMBOO HANDLING PACKAGE Rev.2
(STATIC & MACHINERY EQUIPMENT) Page 9 of 14
- V-belt : make/section/no.
Bearings
- Type/make
- Size
- Design load
- Design life
Silo Capacities
Silo Volume 500 CuM
Capacity without compaction factor MT
Capacity with 5% compaction factor MT
Design Considerations
Silo Design Standard IS
Seismic Zone Zone V
Wind load 180 KMPH
Model/Make :
Gauss strength of magnet :
Operating height considered :
Construction :
MOC of magnet coil :
Class of insulation :
Type of cooling considered :
Maximum size and weight of :
material that can be lifted
Discharge chute MOC & plate
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
DATASHEET Doc. No.
FOR B215-000-80-43-DS-4505
RAW BAMBOO HANDLING PACKAGE Rev.2
(STATIC & MACHINERY EQUIPMENT) Page 11 of 14
thickness :
Quantity :
Make/Model No. :
No. of machined idlers :
No. of load cells :
Type of load cells :
Accuracy of weighment : ±0.5%
Weighing range :
Weigh frame fixing centers, mm :
Location : 0105-CB-0005, 0105-CB-0013 & 0105-CB-0014
Belt width, mm :
Belt speed, m/sec :
Trough angle :
Machined idler spacing, mm :
Note 1: Contractor shall allot tag no. for each bag filters. Quantity and capacity of de dusting system (i.e. Bag filter) shall be
decided during detailed engineering based on study that shall be carried out by Contractor based on requirement specified in
Job specification, EIL Standard 6-23-0001 and the same shall be submitted to ABRPL/EIL for approval.
OPERATING PARAMETERS
1 Capacity: Lift:
2 Location: Lift speed, M/min.:
3 Lift creep speed, M/Min.: Traverse speed, M/Min.:
4 Beam size: Length of travel:
5 Operating Floor level: Elevation of Bottom of monorail where Hoist to
be mounted :
6 Area Classification: Duty Class: M2
7 CONSTRUCTION FEATURES
8 Make: Model:
10 MATERIAL OF CONSTRUCTION
11 Drum: Wheels:
12 Trolley: Hook:
13 Sheave: Rope:
20 Hoisting: Lowering:
Abbreviations:
Members: : Mr P. Bhattacharjee
Mr Sanjay Mazumdar
Mr P.P Pandey
Mr Nalin Kumar
Mr Tarun Kumar
Mr Anukul Mandal
Mr Shishupal Choudhary
Mr R R Srivastava
Mr J S Duggal
Mr KC Paikar
Mr A Natarajan
Mr K V K Naidu (Projects)
CONTENTS
1.0 GENERAL 4
2.0 CODES AND STANDARDS 4
3.0 TECHNICAL REQUIREMENT 4
4.0 INSPECTION AND TESTING 6
5.0 PROTECTION AND PAINTING 7
6.0 PACKAGING AND IDENTIFICATION 7
7.0 SPARE PARTS 7
1.0 GENERAL
This specification outlines the minimum requirements under which the manufacturer shall
design, manufacture, test and supply the Dust Collection System: Bag filter type, complete
with all accessories.
2.1 Latest editions of the following codes and standards shall govern:
IS-2494 (Part-1) V-Belts — Endless V-Belts for Industrial Purposes (General
Purpose-Specification
IS: 2494 (Part 2) V-Belts — Endless V-Belts for Industrial Purposes (Fire Resistant
and Antistatic V-Belts-Specification)
IS-3142 Pulleys- V-Grooved Pulleys for Endless V-Belts Sections Z,A, B,
C, D and E and Endless Wedge Belts Sections SPZ, SPA, SPB
and SPC-Specification
2.2 Other international standards may also be acceptable subject to their being equivalent or
superior to those listed above, with prior approval of Purchaser.
2.3 For provisions not covered by the above codes & standards, applicable good engineering
practices and norms of the industry shall be applicable.
2.4 National Laws and statutory provisions together with any local bylaws for the state wherein
package is required to be installed shall be complied with.
3.1 Duty
3.1.1 Dust collection system shall be suitable for 24 hours/day continuous operation. The system
shall be suitable for maintaining clean and dust-free environment around the dust generating
areas.
3.1.2 The dust collection system shall be provided with PLC based control to interlock and
monitor different control parameters, when specified.
3.1.3 Design of dust collection system shall be as per ACGIH norms.
3.1.4 Balancing dampers shall be provided in each branch for balancing purpose.
3.6.4 Minimum thickness of carbon steel ducts shall be 3 mm. They shall be made from CS sheets
conforming to IS:1079. Dust collection hoods shall be suitably stiffened.
3.6.5 Air tight access openings or clean-outs shall be provided at regular intervals to suit layout.
3.6.6 All duct work shall be complete with supports. Support spacing shall be selected according
to the duct diameter.
3.6.7 Smooth pipe bends of radius not less than 5 times the diameter shall be provided. Miter
bends are acceptable for duct diameter of 250 mm and above. Miter bends shall be made of
minimum 5 sections.
3.6.8 All branches shall enter the main duct at an angle of preferably 22Y2°, but in any case not
exceeding 45°.
3.6.9 Exhaust stack shall be provided with the bird protection screen and suitable rain protection
cowl. Stack shall be self-supporting type unless otherwise specified.
3.6.10 Height of stack shall be 3 meters (minimum) above highest elevation of plant building and
shall conform to local statutory requirement.
3.6.11 Suction hoods at various collection points and dampers shall be provided along with the
duct.
3.6.12 Pressure tappings shall be provided in the duct at suitable locations.
4.1 Equipment shall be subjected to stagewise expediting, inspection and testing at vendor's/
sub-vendor's works by Purchaser/its authorised inspection agency. Vendor shall submit
Quality Assurance (QA) plans before commencement of fabrication. Approved QA plans
shall form basis for equipment inspection.
4.2 Testing at Works
4.2.1 Vendor shall perform tests and inspection necessary to ensure that the material and
workmanship conform to the requirement of this specification.
4.2.2 Vendor shall furnish test certificates to show that the equipment meets the performance
requirements. Manufacturer's test certificates shall be furnished for all bought out items
4.2.3 Fittings, valves, instruments and other accessories like filters etc. shall be duly tested and
manufacturer's test certificates shall be produced. Hydrostatic/pneumatic testing for valve
body strength, tightness of seat and tightness of back sealing shall also be carried.
4.2.4 All Positive Displacement Blowers and Centrifugal Blowers shall be performance tested at
manufacturer's shop in accordance with applicable codes and standards.
4.2.5 Any or all the tests, at Purchaser's option, shall be witnessed by Purchaser/its authorised
inspection agency. However, such inspection shall be regarded as check-up and shall in no
way absolve the vendor of his responsibility.
4.3 Any or all the tests, at Purchaser's option, shall be witnessed by Purchaser/ its authorised
inspection agency. However, such inspection shall be regarded as check-up and shall in no
way absolve the vendor of his responsibility.
4.4 Performance Testing and Guarantees
4.4.1 A field performance test shall be conducted by the vendor to demonstrate the guaranteed
performance after commissioning in accordance with test procedure and report to be
prepared as per EIL Std. No. 7-76-0103.
The procedure of performance testing shall be submitted for Purchaser's review and shall be
mutually agreed between the Purchaser and the vendor.
4.4.2 The following shall be guaranteed and demonstrated during the performance testing:
Format No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reserved
STANDARD SPECIFICATION STANDARD SPECIFICATION No.
15iland ENGINEERS FOR
idOireg
INIVI ?WOW 4513,10.1)
J INDIA LIMITED
IA Govt of tndia Undertaking) DUST COLLECTION SYSTEM:
6-23-0001 Rev. 4
BAG FILTER TYPE Page 7 of 7
5.1 Surface preparation and painting shall be done as per Project specific painting Specification.
5.2 Stainless steel surfaces, both inside and outside, shall be pickled and passivated.
53 Machined and bearing surfaces shall be protected with varnish or thick coat of grease.
6.1 All packaging shall be done in such a manner as to reduce the volume. The equipment may
be dismantled into major components, suitable for shipment and shall be properly packed to
provide adequate protection during shipment. All assemblies shall be properly match
marked for site erection.
6.2 Attachments, spare parts of the equipment and small items shall be packed separately in
wooden-cases. Each item shall be appropriately tagged with identification of main
equipment, item denomination and reference number of the respective assembly drawing.
6.3 Detailed packing list in water-proof envelope shall be inserted in the package together with
equipment.
6.4 Each equipment shall have an identification plate giving salient equipment data, make, year
of manufacture, equipment number, name of manufacturer etc.
6.5 Vendor shall furnish procedure for prolonged storage of supplied equipment/ material at site.
7.1 Vendor shall submit list of spare parts with recommended quantities and itemised prices for
first two years of operation of the equipment. Proper coding and referencing of spare parts
shall be done so that later identification with appropriate equipment is facilitated.
7.2 Recommended spares and their quantities should take into account related factors of
equipment reliability, effect of equipment downtime upon production or safety, cost of parts
and availability of vendor's service facilities around the proposed location of equipment.
73 Vendor shall also submit a list of commissioning spares with quantities. The commissioning
spares shall be sufficient for trouble free commissioning of the system at site. Any
commissioning spares required during commissioning, over and above, the commissioning
spares supplied, shall be made available by the vendor without any cost and time implication
to Purchaser. If for any reason, during commissioning, vendor needs to utilise spares from 2
years' operational spares, the same shall be replenished by vendor within a reasonable time
without any cost implication to Purchaser. Any unused commissioning spares shall be
handed over to owner.
Aik)
Abbreviations:
Members: : Mr P. Bhattacharjee
Mr Sanjay Mazumdar
Mr P.P Pandey
Mr Nalin Kumar
Mr Tarun Kumar
Mr Anukul Mandal
Mr Shishupal Choudhary
Mr R R Srivastava
Mr J S Duggal
Mr KC Paikar
Mr A Natarajan
Mr K V K Naidu (Projects)
CONTENTS
1.0 GENERAL 4
2.0 CODES AND STANDARDS 4
3.0 TECHNICAL REQUIREMENT 4
4.0 INSPECTION AND TESTING 5
5.0 PROTECTION AND PAINTING 5
6.0 PACKAGING AND IDENTIFICATION 6
7.0 SPARE PARTS 6
1.0 GENERAL
This specification outlines the minimum requirements under which the manufacturer shall
design, manufacture, test and supply the Rotary Valve, complete with all accessories.
2.1 Latest editions of the, following codes and standards shall govern:
2.2 Other international standards may also be acceptable subject to their being equivalent or
superior to those listed above, with prior approval of Purchaser.
2.3 For provisions not covered by the above codes & standards, applicable good engineering
practices and norms of the industry shall be applicable.
2.4 National Laws and statutory provisions together with any local bylaws for the state wherein
package is required to be installed shall be complied with.
3.1 The rotary valve shall be designed to prevent jamming, smearing, shearing or degradation of
the product.
3.2 The housing shall be cast and the rotor may be fabricated from material as specified in the
data sheet. Material of construction of parts coming in contact with the product handled
shall be as specified in the data sheet.
3.3 The rotary valve shall be provided with flanged inlet and outlets. Circular flanges shall be
sized and drilled as per ASME B 16.5, 150 lb rating, unless otherwise specified.
3.4 If required, purging with compressed air/ inert gas shall be provided to flush the area
between the seal ring and end plate to keep it free of product dust.
3.5 If required, adjustable strips shall be provided on the tips of rotor blades, to adjust
clearance between the rotor and the housing. The wear strip shall be decided based on wear
behavior and may be made from Teflon or carbides.
3.6 The vendor shall indicate the quantity of leakage and a curve showing the leakage for
various differential pressures.
3.7 The stuffing boxes shall be provided in the end covers for shaft sealing and shall be purged
with air/inert gas as specified in data sheet.
3.8 The rotary valve shall have a fixed speed drive unless otherwise specified. The speed shall
be selected by the vendor and the same shall not be more than 80% of the maximum
recommended speed indicated by the manufacturer. In case of variable capacity requirement
the rotary valve speed may be varied through variable frequency drive motor.
3.9 For rotor volume selection, considered volumetric efficiency shall not exceed 75%. While
deciding the capacity, vendor shall take into account the actual aerated/ fluidized bulk
density. Sizing shall be based on maximum capacity and minimum bulk density to be
handled.
3.10 Rotary valve bearings shall be mounted externally and shall be sealed to avoid any contact
of lubricants with the process material. Only antifriction bearings shall be used.
3.11 The drive shall consist of a motor with primary reduction unit and secondary chain reducer
if required. The chain reduction unit shall be completely covered and lubricated. The drive
51gar Viaa
-g INDIA LIMITED FOR 6-33-0005 Rev. 4
2:120,12 0,13,R0,1) IA Gout of India Undettakmg)
ROTARY VALVE FEEDER Page 5 of 6
frame may be supported on the rotary valve body. Chain guard shall be of non sparking
material for hazardous area application.
3.12 Drive motor shall be selected for starting the rotary feeder in fully loaded condition.
3.13 A suitable size vent nozzle shall be provided to release the air/gas.
3.14 Zero speed (no motion) switch shall be provided with each rotary valve.
4.1 Equipment shall be subjected to stagewise expediting, inspection and testing at vendor's/
sub-vendor's works by Purchaser/its authorised inspection agency. Vendor shall submit
Quality Assurance (QA) plans before commencement of fabrication. Approved QA plans
shall form basis for equipment inspection.
4.2 Testing at Works
4.2.1 Vendor shall perform tests and inspection necessary to ensure that the material and
workmanship conform to the requirement of this specification.
4.2.2 Inspection and testing at vendor's works shall include but not limited to the following:
i) Dimensional checkup
ii) Material test reports of materials, castings, forgings etc.
iii) No load and leakage test of Rotary Valve.
Any or all the tests, at Purchaser's option, shall be witnessed by Purchaser/its authorised
inspection agency. However, such inspection shall be regarded as check-up and shall in no
way absolve the vendor of his responsibility.
4.4 Performance Testing and Guarantees
4.4.1 A field performance test shall be conducted by the vendor to demonstrate the guaranteed
performance after commissioning in accordance with test procedure to be prepared as per
EIL Std. No. 7-76-0103.
The procedure of performance testing shall be submitted for Purchaser's review and shall be
mutually agreed between the Purchaser and the vendor.
4.4.2 Capacity of feeder shall be guaranteed and demonstrated during the performance testing at
site
4.4.3 All parts of the rotary valve shall operate satisfactorily with no undue friction, vibration,
noise or display of any other unfavourable characteristics during the performance test.
4.4.4 All equipment and component parts shall be guaranteed by the vendor against defective
material and design for a period as specified in Purchaser's general purchase conditions.
4.4.5 If any defect occurs during the guaranteed period the Vendor shall make all necessary
alterations, repairs and replacement at their own cost.
4.4.6 Necessary instruments for the performance testing shall be arranged by the vendor, and shall
be tested and calibrated before undertaking the performance test.
5.1 Surface preparation and painting shall be done as per vendor's standard suitable for highly
corrosive industrial environment, unless otherwise specified elsewhere in the Material/
Purchase Requisition.
5.2 Stainless steel surfaces, both inside and outside, shall be pickled and passivated.
5.3 Machined and bearing surfaces shall be protected with varnish or thick coat of grease.
6.1 All packaging shall be done in such a manner as to reduce the volume. The equipment may
be dismantled into major components, suitable for shipment and shall be properly packed to
provide adequate protection during shipment. All assemblies shall be properly match
marked for site erection.
6.2 Attachments, spare parts of the equipment and small items shall be packed separately in
wooden-cases. Each item shall be appropriately tagged with identification of main
equipment, item denomination and reference number of the respective assembly drawing.
6.3 Detailed packing list in water-proof envelope shall be inserted in the package together with
equipment.
6.4 Each equipment shall have an identification plate giving salient equipment data, make, year
of manufacture, equipment number, name of manufacturer etc.
6.5 Vendor shall furnish procedure for prolonged storage of supplied equipment/ material at site.
7.1 Vendor shall submit list of spare parts with recommended quantities and itemised prices for
first two years of operation of the equipment. Proper coding and referencing of spare parts
shall be done so that later identification with appropriate equipment is facilitated.
7.2 Recommended spares and their quantities should take into account related factors of
equipment reliability, effect of equipment downtime upon production or safety, cost of parts
and availability of vendor's service facilities around the proposed location of equipment.
7.3 Vendor shall also submit a list of commissioning spares with quantities. The commissioning
spares shall be sufficient for trouble free commissioning of the system at site. Any
commissioning spares required during commissioning, over and above, the commissioning
spares supplied, shall be made available by the vendor without any cost and time implication
to Purchaser. If for any reason, during commissioning, vendor needs to utilise spares from 2
years' operational spares, the same shall be replenished by vendor within a reasonable time
without any cost implication to Purchaser.
Weq-ZR
`MK iiiich
Abbreviations:
CONTENTS
1.0 GENERAL 4
2.0 CODES AND STANDARDS 4
3.0 TECHNICAL REQUIREMENT 4
4.0 INSPECTION AND TESTING 6
5.0 PROTECTION AND PAINTING 7
6.0 PACKAGING AND IDENTIFICATION 7
7.0 SPARE PARTS 7
1.0 GENERAL
This specification outlines the minimum requirements for the design, manufacture, test and
supply of the screw conveyor and its accessories suitable for transporting loose, free-flowing
materials and also for mixing and blending operations in various industrial plants as specified
herein-after.
2.1 This standard is based on the following Indian/international Standards, and the standards
referred therein, which shall be deemed to be part of this standard:
2.2 Other international standards may also be acceptable subject to their being equivalent or
superior with prior approval of purchaser.
2.3 For provisions not covered by the above codes & standards, applicable good engineering
practices and norms of the industry shall be applicable.
Technical requirements of Screw Conveyor shall be as per Codes and Standards referred in
Clause 2.1 above. Screw Conveyor drive power calculation shall be based on ISO - 7119.
However, following additional requirements to above Standards shall be considered.
i) Screw conveyors shall be suitable for continuous duty at full load conditions. Also
conveyors shall be able to start in fully loaded condition.
ii) The speed of the screw conveyor shall depend on the capacity, characteristics of load
to be conveyed and diameter of screw. CEMA - 350 shall be followed for selection /
sizing of screw conveyors.
iii) Conveyor screw flight shall be made from steel plate normally (stamped at individual
pieces in case of sectional flight) formed into a helix, welded to the pipe or shaft and
butt welded together. The pipe carefully selected for adequate torsional strength and
resistance to excessive deflection, shall have internal collars at each end. These collars
shall be permanently inserted and shall have appropriate inside diameters to accept
couplings, driving shafts or end-shafts.
iv) The screw shall be made in maximum 6 m sections, fastened to each other so that the
removal and replacement is possible without disturbing the other sections.
v) The screw shall have smooth flight surface in order to reduce friction and power
consumption.
vi) For special applications, requiring resistance to corrosion and/or involving moderate
to extreme heat, stainless steel screws shall be used.
vii) Screw conveyor trough or U trough shall be fabricated from steel plate, angle or
stainless steel plate depending on the application, with suitable stiffeners.
viii) The troughs shall be jacketed type if required for cooling or heating the conveyed
material. Jacketed troughs shall be designed, constructed and tested in accordance
with ASME code, Section VIII, Div 1 and section IX.
ix) The trough length shall be single or in parts connected together by leak-proof flanged
connections, to obtain the required length. Trough and cover shall be quick opening
type, if specified in the data sheet.
x) The trough shall be supported on saddles. In case the trough is made of different sec-
tions, then the supports shall be provided for each section which allows removal of the
trough sections or screw without disturbing trough alignment.
xi) Trough end seals shall be used for protection for or against the material being handled.
xii) Intermediate discharge spouts, if required, shall be provided with suitable gate.
xiii) Cover
a) The covers shall be clamped or bolted to the trough flanges.
b) For leak-proof covers, the connection between cover and trough shall be with
gaskets.
c) The cover shall be removable type for inspection of full screw and shall be
provided with necessary dust-tight, easily openable inspection doors at
approximately 2 m spacing.
d) Cover shall have joints located at the hangers. Any intermediate joint, if required,
shall be provided with suitable bolted cover strip with gasket.
xiv) Hanger
a) Number of hangers shall be minimised by selecting larger diameter shaft as far as
feasible.
b) The design of hanger shall permit free passage of material.
c) Hangers shall be fixed or sliding type, hung from top of the trough and shall house
the intermediate bearings.
d) Hanger frame shall be made of rigid steel fabricated construction housing to
accommodate bearing.
e) The mounting holes shall be slotted to facilitate assembly and alignment.
0 Location of hanger shall be away from feed chute.
xv) Bearing
a) Bearings shall be bronze or babbitted or teflon bushing or antifriction type.
b) The intermediate bearings shall be split type to facilitate assembly.
c) All the bearing shall be properly sealed.
d) Discharge end bearings shall be thrust bearing to take up axial force so that shaft
and couplings are in tension.
e) The intermediate bearing width shall be short so as to have small gap of screw
flight to accommodate it.
f) Bearing shall have Lio life of minimum 40000 hrs.
xvi) Drive
a) Solid shaft shall be used at all bearing locations.
b) The drive of conveyor shall be through reduction gear/sprocket and chain or V-
be It.
c) Service factor shall be minimum 1.5 for drive.
d) The drive shall be usually installed on the discharge end of the conveyor.
xvii) Coupling
a) Shaft couplings shall be required for connecting adjoining lengths of conveyor
screws. The bare portion of the shaft coupling shall be used as a shaft for the
hanger.
b) Close tolerances on diameter and jig drilled bolt holes shall ensure
interchangability and ease of assembly.
xviii) Hazardous Area Requirement
a) Any mechanism where two non-lubricated parts are likely to rub against each
other, one of them shall be of nonferrous material like Aluminium Bronze / High
Tensile Brass or Stainless Steel.
b) All electrical components/equipments shall meet the requirements of respective
area classification.
c) Coupling guards shall be non-sparking type.
4.4.4 All equipment and component parts shall be guaranteed by the vendor against defective
material and design for a period as specified in Purchaser's general purchase conditions.
4.4.5 If any defect occurs during the guaranteed period the Vendor shall make all necessary
alterations, repairs and replacement at their own cost.
4.4.6 Necessary instruments for the performance testing shall be arranged by the vendor, and shall
be tested and calibrated before undertaking the performance test.
5.1 Surface preparation and painting shall be as per vendor's standard suitable for highly
corrosive industrial environment, unless otherwise specified elsewhere in the
Material/Purchase Requisition.
5.2 Stainless steel surfaces, both inside and outside, shall be pickled and passivated.
5.3 Machined and bearing surfaces shall be protected with varnish or thick coat of grease.
6.1 All packaging shall be done in such a manner as to reduce the volume. The equipment may
be dismantled into major components, suitable for shipment and shall be properly packed to
provide adequate protection during shipment. All assemblies shall be properly match
marked for site erection.
6.2 Attachments, spare parts of the equipment and small items shall be packed separately in
wooden-cases. Each item shall be appropriately tagged with identification of main
equipment, item denomination and reference number of the respective assembly drawing.
6.3 Detailed packing list in water-proof envelope shall be inserted in the package together with
equipment.
6.4 Each equipment shall have an identification plate giving salient equipment data, make, year
of manufacture, equipment number, name of manufacturer etc.
6.5 Vendor shall furnish procedure for prolonged storage of supplied equipment/ material at site.
7.1 Vendor shall submit list of spare parts with recommended quantities and itemised prices for
first two years of operation of the equipment. Proper coding and referencing of spare parts
shall be done so that later identification with appropriate equipment is facilitated.
7.2 Recommended spares and their quantities should take into account related factors of
equipment reliability, effect of equipment downtime upon production or safety, cost of parts
and availability of vendor's service facilities around the proposed location of equipment.
7.3 Vendor shall also submit a list of commissioning spares with quantities. The commissioning
spares shall be sufficient for trouble free commissioning of the system at site. Any
commissioning spares required during commissioning, over and above, the commissioning
spares supplied, shall be made available by the vendor without any cost and time implication
to purchaser. If for any reason, during commissioning, vendor needs to utilise spares from 2
years' operation spares, the same shall be replenished by vendor within a reasonable time
without any cost implication to purchaser.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved
Doc. No.
SUB VENDOR LIST
RAW BAMBOO B215-000-86-41-VL-4505
Rev. B
HANDLING PACKAGE
Page 2 of 3
GENERAL NOTES
1.0 CONTRACTOR shall necessarily procure all the material / equipment forming
permanent part of the unit / plant from OWNER / EIL approved vendors only. This
shall include sub-ordered items / components also. The “Approved Vendors” shall be
item specific.
2.0 OWNER / EIL approved vendor list for the various items is enclosed in this section.
3.0 CONTRACTOR may procure material from any of OWNER / EIL approved vendors.
However, current validity, holiday status and range of approval as per EIL enlistment
letter, workload, stability and solvency need to be verified by the CONTRACTOR with
vendor before placement of order. CONTRACTOR is also required to ensure that
equipment qualification criteria, specified elsewhere in the bid document, are also
simultaneously met.
4.0 Vendors on OWNER / EIL holiday list shall not be considered for ordering.
CONTRACTOR shall comply with this requirement without any time or cost
implication to the OWNER. If a vendor is put on OWNER / EIL’s holiday list
subsequent to CONTRACTOR placing an order, it shall be CONTRACTOR’s
responsibility to ensure quality work and timely supply from the vendor.
5.0 For items not covered in the above list, the CONTRACTOR shall approach OWNER /
EIL for that list or the vendors list shall be approved by OWNER / EIL prior to
placement or order by CONTRACTOR. CONTRACTOR shall list down the proposed
suppliers / vendors for such items and submit the same for OWNER / EIL’s review /
approval along with necessary documents / credentials. “Approval status” documents
/ credentials to be furnished by the vendors in such cases shall solely be the
responsibility of the CONTRACTOR. OWNER / EIL’s decision on above shall be final
and non-negotiable. Acceptance or non-acceptance of a particular proposed vendor
due to any reasons whatsoever shall not be a cause of schedule and cost implication.
7.0 At any stage of the project, if it comes to the notice of OWNER / EIL that
CONTRACTOR has procured material / equipment, intentionally or unintentionally
whatsoever, from an unapproved vendor and / or items not falling in approved range
of vendor(s), the same shall be rejected fort with and CONTRACTOR shall be liable
to replace such material / plant / machinery without any schedule and cost implication
to the OWNER.
8.0 List of vendors appearing anywhere else in the contract document in case of
duplication of the items at two or more places shall not be considered by
CONTRACTOR and shall be superseded by the vendor list enclosed herewith. And if
in this vendor list also, items seems to be duplicated / repeated then CONTRACTOR
shall get clarified the issue by OWNER / EIL before proceeding ahead for
procurement activity.
9.0 It is understood that should the name of vendor be changed due to change in their
company or corporate shareholding. OWNER may accept such vendors under its
new name with prior approval.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved
Doc. No.
SUB VENDOR LIST
RAW BAMBOO B215-000-86-41-VL-4505
Rev. B
HANDLING PACKAGE
Page 3 of 3
Any such approval shall however, not absolve the CONTRACTOR from any of his
obligations under the contract; neither shall any such approval signify nominations or
instruction to use such a vendor. All approved vendors are deemed to have been
freely chosen by the CONTRACTOR at his own risk.
Any additional vendors if Proposed by bidders for any item(s), the makes/Sub vendor
of same shall have sufficient Proven Track Record (PTR) and shall be subject to
Client/EIL approval during details engineering without any time and price
implidation to owner
Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved
Suppliers List for Bio Refinery Date :05/12/2018 14:32:50
Page 1 of 32
057057054051
057057054051
On Holiday
1 G183 GRIP ENGINEERS PVT.LTD INDIA Ground-9 (Bid Withdrawal - after unpriced
BO)
2 I572 INGERSOLL RAND COMPANY (USA) UNITED STATES DORMANT (NOT TO BE
CONSIDERED)
057057054051
On Holiday
1 T038 TRACTEL TIRFOR (I) PVT LTD INDIA Ground 14 ( Rejected in Shop Survey)
057057054051
067051052052
057057054051
057057054051
On Holiday
1 R203 RALLISON ELECTRICALS PVT. LTD. INDIA Ground-13 (Negative networth or Financial
constraints)
2 R203 RALLISON ELECTRICALS PVT. LTD. INDIA HOLD ENQ/PO/BO- FIN.CONST/NEG.
NET WORTH
3 R203 RALLISON ELECTRICALS PVT. LTD. INDIA HOLIDAY-FINANCIAL CRISIS/NEG.
NET WORTH
057057054051
057057054051
On Holiday
1 C032 CONTINENTAL VALVE LTD INDIA Ground-15 (Poor Performance)
2 M700 METSO FLOW CONTROL OY FINLAND Ground-23 (Banned by Clients)
On Holiday
1 C032 CONTINENTAL VALVE LTD INDIA Ground-15 (Poor Performance)
2 M700 METSO FLOW CONTROL OY FINLAND Ground-23 (Banned by Clients)
3 W092 WEIR BDK VALVES-A UNIT OF WEIR INDIA PVT INDIA IOCL CONSENT REQUIRED FOR IOCL
ORDERS
057057054051
On Holiday
1 M700 METSO FLOW CONTROL OY FINLAND Ground-23 (Banned by Clients)
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
On Holiday
1 S825 SIMTRONICS SAS (FORM. S812) FRANCE DORMANT (NOT TO BE
CONSIDERED)
057057054051
On Holiday
1 G600 GE FANUC AUTOMATION NORTH AMERICA INC. UNITED STATES DORMANT (NOT TO BE
CONSIDERED)
057057054051
On Holiday
1 B709 BRITISH ROTOTHERM CO.LTD UNITED DORMANT (NOT TO BE
KINGDOM CONSIDERED)
2 N577 NAGANO KEIKI SEISAKUSHO LTD JAPAN DORMANT (NOT TO BE
057057054051 CONSIDERED)
3 D5231 DRESSER INC. UNITED STATES DORMANT (NOT TO BE
CONSIDERED)
On Holiday
1 N577 NAGANO KEIKI SEISAKUSHO LTD JAPAN DORMANT (NOT TO BE
CONSIDERED)
2 S799 SOLARTRON ISA UNITED DORMANT (NOT TO BE
KINGDOM CONSIDERED)
3 D5231 DRESSER INC. UNITED STATES DORMANT (NOT TO BE
CONSIDERED)
057057054051
057057054051
On Holiday
1 L009 LEVCON INSTRUMENTS PVT LTD INDIA Ground-13 (Negative networth or Financial
constraints)
2 A221 ASIAN INDUSTRIAL VALVES & INSTRUMENTS INDIA Ground-15 (Poor Performance)
3 P562 PENBERTHY INC UNITED STATES DORMANT (NOT TO BE
CONSIDERED)
4 P651 PHOENIX SYSTEMLEMENTE UND MESSTECHNIK GERMANY DORMANT (NOT TO BE
CONSIDERED)
057057054051
On Holiday
1 K530 KSR KUEBLER NIVEAUMESS-TECHNIK AG GERMANY DORMANT (NOT TO BE
CONSIDERED)
2 L009 LEVCON INSTRUMENTS PVT LTD INDIA Ground-13 (Negative networth or Financial
constraints)
057057054051
On Holiday
1 D5231 DRESSER INC.
057057054051 UNITED STATES DORMANT (NOT TO BE
CONSIDERED)
2 N577 NAGANO KEIKI SEISAKUSHO LTD JAPAN DORMANT (NOT TO BE
CONSIDERED)
3 B501 BETA BV NETHERLANDS DORMANT (NOT TO BE
CONSIDERED)
057057054051
On Holiday
1 K048 KERALA STATE ELECT DEV CORP LTD (AROOR) INDIA Ground-13 (Negative networth or Financial
constraints)
2 K048 KERALA STATE ELECT DEV CORP LTD (AROOR) INDIA HOLIDAY FOR IOCL PROJECTS
Note: Vendor may procure material from any of the listed vendors. However current validity and
057057054051
range of approval as per EIL enlistment letter, workload, stability and solvency need to be verified
by the vendor before placement of order.
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
057057054051
Note: Vendor may procure material from any of the listed vendors. However current validity and
range of approval as per EIL enlistment letter, workload, stability and solvency need to be verified by
the vendor before placement of order.
057057054051
UTILITY DATA
FOR
OF
BIOREFINERY PROJECT
Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved
Utility Data for Document No.
Raw Bamboo Handling Package of
Bio Refinery Project B215-79-41-BHP-1001 Rev 0
ABRPL, Numaligarh, Assam Page 2 of 4
TABLE OF CONTENTS
1.0 INTRODUCTION 3
Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved
Utility Data for Document No.
Raw Bamboo Handling Package of
Bio Refinery Project B215-79-41-BHP-1001 Rev 0
ABRPL, Numaligarh, Assam Page 3 of 4
1.0 INTRODUCTION
Assam Bio Refinery Pvt. Ltd.(ABRPL) plans to set up a bio-refinery at Numaligarh for
production of fuel grade Ethanol from Bamboo. Assam Bio refinery Pvt Ltd is a joint venture
company promoted by M/s Fortum 3 B.V , M/s Chempolis Oy, Finland and Numaligarh
Refinery Ltd (NRL).
Engineers India Limited (EIL) has been retained by ABRPL to provide EPCM services for Bio
Refinery Project. This document presented here intends to provide the utility data for Raw
Bamboo Handling package of Bio Refinery project of ABRPL in Numaligarh, Assam.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved
Utility Data for Document No.
Raw Bamboo Handling Package of
Bio Refinery Project B215-79-41-BHP-1001 Rev 0
ABRPL, Numaligarh, Assam Page 4 of 4
Utility pressure and temperature levels, as made available at battery limits of vendor package,
as indicated.
Utility conditions at vednor’s B/L (All B/L pressures are as measured at grade)
Notes:
1. Service water shall be brought from existing NRL refinery to the Bamboo Handling
package, hence these will be available at min pressure condition only to the Bamboo
Handling section.
2. Plant air & Instrument air shall be normally taken from CHP plant however If plant air &
instrument air are not available from CHP plant in such scenario these utilities (i.e. IA &
PA) shall be taken from NRL existing refinery and in that case these shall be available at
minimum pressure condition only as specified above.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL – All rights reserved