This presentation will give you an overview of what’s required for Asphalt
documentation. It includes links to forms, contacts, guidelines, and
procedures. A special thanks to the Asphalt Task Team for their input.
1
ASPHALT CONSTRUCTION
INFORMATION
• Please contact Richard R. Massey for any
corrections, changes or comments at the
following e-mail address:
richard.massey@dot.state.fl.us
2
Table of Contents
I. Section 1 – Contact List and Phone Numbers
A. Technical Advisory Committee Member List
B. List of Asphalt Producers with Approved QC Programs
C. Plant Listings by Contractor
D. Plant Listings by District
E. Local District and Resident Contact List
II. Section 2 – General Project Management Information
A. Standard Specifications for Road and Bridge Construction
B. Asphalt Pre-Paving Conference Agenda
C. State Construction Office Memorandums
D. The Matrix
E. CQR Instructions
TABLE OF CONTENTS 3
Table of Contents (cont.)
II. Section 2 – General Project Management Information
F. LIMS Instructions
G. CPAM –Construction Project Administration Manual
H. Materials Manual
I. Flexible Pavement Design Manual
J. Preparation and Documentation Manual – Chapter 9
K. Review and Administration Manual – Chapter 9
L. Value Added Asphalt Flowchart
III. Section 3 – Forms and Instructions
A. Asphalt Plant – Worksheet (675-030-25)
B. Asphalt Plant – Daily Report of Quality Control (675-030-18)
C. Asphalt Plant – Verification Report (675-030-19)
TABLE OF CONTENTS 4
Table of Contents (cont.)
III. Section 3 – Forms and Instructions
D. Asphalt Roadway – Daily Report of Quality Control (675-030-20)
E. Asphalt Roadway – Verification Report (675-030-21)
F. Asphalt Plant – Pay Factor Worksheets (675-030-22)
G. Asphalt Independent Verification Report (675-030-17)
H. Asphalt Resolution Report (675-030-22)
I. Cross Slope Measurement Data Form (700-010-98)
J. Roadway – As-Built Pavement Data (700-050-12)
K. Pavement Smoothness Measurement Data Form
( Laser Profiler)
L. Straightedge Test Report
IV. Section 4 – Lot Submittal Package and Instructions
TABLE OF CONTENTS 5
Table of Contents (cont.)
TABLE OF CONTENTS 6
Table of Contents (cont.)
VI. Miscellaneous Information
C. IA Checklist
1. FM 5-509 Rolling Straightedge
2. AASHTO TP4 – 97 Gyratory Compaction
3. FM 1 – T030 Mechanical Analysis of Extracted Aggregate
4. FM 1 – T166 Bulk Specific Gravity
5. FM 1 – T168 Sampling Bituminous Paving Materials
6. FM 1 – T209 Maximum Specific Gravity of Bituminous
Paving Materials
7. FM 5 – 563 Asphalt Content by Ignition Oven
D. Specification 334 Flowchart
E. Engineering Analysis Report (EAR) Flowchart and Guidelines
TABLE OF CONTENTS 7
Section 1 – Contact Lists
SECTION 1 A 8
Section 1 – Contact Lists (cont.)
Asphalt Producers
SECTION 1 B 9
Section 1 – Contact Lists (cont.)
Contractors Plants
SECTION 1 C 10
Section 1 – Contact Lists (cont.)
SECTION 1 D 11
Section 1 – Contact Lists (cont.)
SECTION 1 E 12
Section 2 – General Project
Management Information
• A. Standard Specifications for Road and
Bridge Construction
The link below has the latest revisions to the
standard specifications. It can also be used
for review of upcoming changes, and past
specifications, etc.
Specifications
SECTION 2 A 13
Section 2 – General Project
Management Information (cont.)
SECTION 2 B 14
Section 2 – General Project
Management Information (cont.)
SCO memos
SECTION 2 C 15
Section 2 – General Project
Management Information (cont.)
• D. The Matrix
The Matrix
SECTION 2 D 16
Section 2 – General Project
Management Information (cont.)
• E. CQR Instructions
CQR Instructions
SECTION 2 E 17
Section 2 – General Project
Management Information (cont.)
• F. LIMS Instructions
LIMS Instructions
SECTION 2 F 18
Section 2 – General Project
Management Information (cont.)
• G. CPAM Construction Project
Administration Manual
CPAM
SECTION 2 G 19
Section 2 – General Project
Management Information (cont.)
• H. Materials Manual
Materials Manual
SECTION 2 H 20
Section 2 – General Project
Management Information (cont.)
SECTION 2 I 21
Section 2 – General Project
Management Information (cont.)
SECTION 2 J 22
Section 2 – General Project
Management Information (cont.)
SECTION 2 K 23
Section 2 – General Project
Management Information (cont.)
SECTION 2 L 24
Section 3 – Forms and Instructions
SECTION 3 A 25
Section 3 – Forms and Instructions
(cont.)
SECTION 3 B 26
Section 3 – Forms and Instructions
(cont.)
• C. Asphalt Plant – Verification Report
(675-030-19)
All Jobs
Excel Format – 675-030-20
PDF Format – 675-030-20
SECTION 3 D 28
Section 3 – Forms and Instructions
(cont.)
All Jobs
Excel format – 675-030-21
PDF format – 675-030-21
SECTION 3 E 29
Section 3 – Forms and Instructions
(cont.)
• F. Asphalt Plant – Pay Factor Worksheets
(675-030-22)
This can be obtained at the link below:
Use Tabs at bottom of the spreadsheet for
different sieves and reports.
All Jobs
Composite Pay Factor Worksheet
SECTION 3 F 30
Section 3 – Forms and Instructions
(cont.)
• G. Asphalt Independent Verification Report
(675-030-17)
SECTION 3 G 31
Section 3 – Forms and Instructions
(cont.)
• H. Asphalt Resolution Report (675-030-23)
All Jobs
Cross Slope Form – 700-010-98
SECTION 3 I 33
Section 3 – Forms and Instructions
(cont.)
All Jobs
Laser Profiler Request Form
SECTION 3K 35
Section 3 – Forms and Instructions
(cont.)
• L. Asphalt Pavement Straightedge Test
Report
SECTION 3L 36
Section 4 – Lot Submittal Package
and Instructions
A. Lot Submittal Package
– Documentation
Order
Then go to page 27 of 46
SECTION 4 37
Section 4 – Lot Submittal Package
and Instructions (cont.)
• The Asphalt Plant – Pay Factor Worksheet
(675-030-22)
SECTION 4 39
Section 4 – Lot Submittal Package
and Instructions (cont.)
5. Verification Plant Report
6. Verification Roadway Report
7. QC Plant Daily Report 1
8. QC Road Daily Report 1
9. QC Plant Daily Report 2
10. QC Road Daily Report 2
11. QC Plant Daily Report 3
SECTION 4 40
Section 4 – Lot Submittal Package
and Instructions (cont.)
12. QC Road Daily Report 3
13. QC Plant Daily Report 4
14. QC Road Daily Report 4
15. Any Additional Information
16. Ticket Packet – Day 1
17. Ticket Packet – Day 2
18. Ticket Packet – Day 3
19. Ticket Packet – Day 4
SECTION 4 41
Section 5 – Asphalt Construction
Guidelines
• A. Asphalt Guidelines – Roadway VT /
Roadway QC / Plant VT / Plant QC /
Project Administrator / QC Manager /
Paper work Timeline
SECTION 5 A 42
Section 6 – Miscellaneous
Information
SECTION 6 A-2 44
Section 6 – Miscellaneous
Information (cont.)
• C. IA Checklist
1. FM 5-509 Rolling Straightedge
IA Checklist - Straightedge
SECTION 6 C-1 47
Section 6 – Miscellaneous
Information (cont.)
• C. IA Checklist
2. AASHTO TP4 - 97
Gyratory Compaction
• C. IA Checklist
3. FM 1 – T030 Mechanical Analysis of
Extracted Aggregate
• C. IA Checklist
4. FM 1 – T166 Bulk Specific Gravity
SECTION 6 C-4 50
Section 6 – Miscellaneous
Information (cont.)
• C. IA Checklist
5. FM 1 – T168 Sampling Bituminous
Paving Materials
SECTION 6 C-5 51
Section 6 – Miscellaneous
Information (cont.)
• C. IA Checklist
6. FM 1 – T209 Maximum Specific Gravity
of Bituminous Paving Materials
IA Checklist - GMM
SECTION 6 C-6 52
Section 6 – Miscellaneous
Information (cont.)
• C. IA Checklist
7. FM 5 – 563 Asphalt Content by Ignition
Oven
IA Checklist – AC Content
SECTION 6 C-7 53
Section 6 – Miscellaneous
Information (cont.)
SECTION 6 D 54
Section 6 – Miscellaneous
Information (cont.)
EAR Guidelines
SECTION 6E 55