CHECK LIST – Puff Test OF FM 200

Piping

Location/ Building IR No.:


Ref. Drawing No.
Inspection
Services FM200 System Piping Date

Result
Check If Satisfactory Remark
Accept Reject

Drawings marked up indicating piping section that requires


1
flushing operation.
Nitrogen cylinder/ Air Compressor are connected with piping
2
network properly.
3 Flushing / Cleaning equipment setup is acceptable.
Readily removable fittings shall be provided for flushing
4
operations.
5 Plug all the pipe ends of the upright nozzles.
Open the ball drip valve located at the compressor (or) Dry
6 Nitrogen Cylinder outlet and keeps blowing for approximately 5
seconds.
7 Repeat the operation until satisfactory result.
Remove all the plugs and replace the nozzles into their
8
original position.

Note:

WITNESSED / CHECKED BY

NAME
SIGNATURE
Date

Page 1 of 1