Professional Documents
Culture Documents
User Manual of Building Permission V 1.0 27 02 19
User Manual of Building Permission V 1.0 27 02 19
Prepared by
Table of Contents
1. Introduction ............................................................................................................ 3
2. Login Page of MCGM .............................................................................................. 3
3. Architect Console.................................................................................................... 4
4. Creating New Applications ...................................................................................... 5
5. Selecting Permission Type ...................................................................................... 6
6. Application Draft..................................................................................................... 8
7. MRTP Forms ........................................................................................................... 9
8. Drawing Concession................................................................................................ 9
9. Document Checklist .............................................................................................. 10
10. Additional Documents ....................................................................................... 11
11. Applying for NOC’s............................................................................................. 12
12. Site Progress ...................................................................................................... 14
13. Digital Signature ................................................................................................ 15
14. Payment Process ............................................................................................... 17
15. Final Submission ................................................................................................ 20
16. Correspondence List .......................................................................................... 21
1. Introduction
At the present time, Automation process of building permission elevates ease doing business under
government initiative for Mumbai city and Suburb. The online application of MCGM will grant
permission for building construction and NOC’s from various Departments for the end user.
This document is brief about the steps to be followed for the submission of a proposal in MCGM for
Building permission.
After creation of the one project (Refer the User manual of One Project) one should need to follow
crucial steps to apply for building permits.
You should log in with your respective credentials (User name and Password).
3. Architect Console
Once the architect login, the above architect’s console will appear. Where you have provision to
check for past proposals from the drop-down list, the status of proposal shown in tabular form as
shown in the above screenshot. Apart from that user can create the new application for building
permission or to grant NOC’s.
Note: The selected project must contain the information of licensed plumber and
Developer/Owner if the proposal is for building permission.
(Select only for approval of the plan and basic scrutiny, the proposal will
move till Ex. Engineer for approval.)
6. Type of Notice
Proposed Application
1. Proposed development
6. Application Draft
After clicking on creating applicants the above page will open, where your application is in the draft
stage, on the left-hand side of the application shows a list of the section and the green coloured
section shows the information is already filled. (While creating One Project).
7. MRTP Forms
7. Select the MRTP Forms section, Fill up the form as per your convenience. Click the save button, to
save the information.
Note: Asterisk Mark (*) fields should be mandatorily filled in by the user.
8. Drawing Concession
8. Click on Drawing (Concession), attach the DWG file. As shown in the above figure.
9. Document Checklist
To attach the document first check the box and click on the attached here icon button. To upload
the documents.
Once the document is attached, you are able to Preview the attached document.
11. Click Add Button, Check the box, Fill in the name of the document, Select the stage from the
drop-down list.
12. After Clicking on Save as a Draft button Attach Here icon will appear. Now you can able to attach
the document.
Click Submit Button. The warning message will appear as shown below.
Select No, (If you already have NOC’s) (Attach Here Button will appear)
After successfully uploading of documents the above message will pop up,
In Photographs Section,
14. Click Attach More button select the photograph from your computer. (The file format should be
in PDF, .DWG, .DCR, .JPG, .GIF, .BMP, .PNG OR .DOC files)
15. Similarly, for each Direction Video should be uploaded, the video should be of format (3GP, .MP4,
.MPEG, .AVI files).
16. Before submitting the proposal to the corporation, you have to digitally sign the documents,
drawing and application details/ data and confirm yourself as declarations for all Ownership.
Once the proposal is submitted, now the Challans payment process gets started, in application
progress, the status will displays Payment Pending.
17. After Digital Signature, for making online payment against demand notes generated by MCGM
BPAMS, in the view challans section, Click on Pay Now Button.
18. Fill in the File/Challan No., Click GO Button, Architect name, owner name... Etc. Will generate
automatically. Payment can be done through online banking. Click Pay button.
19. This will redirect you to above respective Online Payment Portal, where you have to fill your bank
details for payment, Choose the option as per your convenience. Click Make Payment
Once payment is done online, the payment receipt will get auto-generated.
20. Click Submit to Corporation button to submit the final proposal to the corporation.
Now the proposal follows the workflow based on the option that you have chosen. Tracking of your
proposal can be seen in above screenshot under Application Progress option. Which authority is
holding the proposal can be seen in Application Summary option in application flow.
Now the file will move to higher authorities, where the higher authorities has provision to give
remark on the proposal from their consoles, where you will get the notification of remarks given by
them will display in architect console just by clicking on bell icon.