1. PURPOSE

The purpose of this procedure is to ensure that the Fire Fighting Inergen System is tested
in accordance with the specifications, standards and all applicable documents.

2. APPLICABILITY

This procedure applies to Fire Fighting Inergen System in all Stations.

3. DEFINITION

None.

4. SPECIFICATIONS AND STANDARDS APPLIED

 Material and Workmanship Technical Specification.


 General Specification for Electrical and Mechanical Works.
 MSS about Fighting Inergen System
 Drawings and Study of Fighting Inergen System

5. RESPONSIBILITIES

 Testing of the Fighting Inergen System is under the responsibility of the Site
Engineer.
 Checking of the test is under responsibility of the QA/QC Engineer.

6. PROCEDURE

1. INSTALLATION TEST PROCEDURE


Installation Test consists of :

 INSTALLATION TEST / CHECKLIST

08/09/09
TEST PROCEDURE FOR INERGEN SYSTEM
Installation Test and Stand Alone Test

2. STAND ALONE TEST PROCEDURE


Stand Alone Test consists of :

 STAND ALONE TEST / CHECKLIST

NO SAT WILL BE PERFORMED UNLESS THE IT/CHECKLIST HAS BEEN


SUCCESSFULLY COMPLETED AND SIGNED OFF

7. RELATED DOCUMENTS

- Installation Test / Check List – Fighting Inergen System - Doc E.1911.200/Π


- Stand Alone Test / Check List – Fighting Inergen System - Doc E.1911.199/Π
- Installation Manual from the manufacturer