January 20, 2023

ONE LAKESHORE DRIVE PROJECT


SP Dakudao Loop, Davao Park District,
Lanang, Davao City

TO : ENGR. ALEX S. TRINIDAD


General Manager
AST Industrial & General Services

: ENGR. ROLAND L. BANDONG


Operation Manager
AST Industrial & General Services

Project : ONE LAKESHORE DRIVE PROJECT

Subject : ALARM CHECK VALVE ASSEMBLY

Dear Sir,

We are writing this letter to let you know regarding the information delivered to us
during the coordination meeting held on January 19, 2023 at SPI office. We were
informed that the owners of the units in Tower 1 will start their occupancy on April 1,
2023 which requires the full operation of Tower-1 Fire protection system.

Two (2) years ago, we asked for the clarification from the consultant’s office regarding
the alarm check valve assembly because of the discrepancy between the drawing &
the manufacturer’s available sizes. Based on the drawing the alarm check valve is
250mm dia but the manufacturer’s data is only 8” or (200mm) dia. The consultant
ignored our request until now.

During our meeting yesterday, SPI representative instructed us to consult the other
designer to check & review the existing designed of fire protection system in OLSD if
the 200mm dia alarm check valve is possible for installation & cannot affect the entire
operation if installed.

We attached drawings for the designer’s review.

Thank you!

AST INDUSTRIAL SERVICES & GENERAL MERCHANDISE

Prepared by: Noted by:

RYAN R. SABELLA SOFIO P. MACAWILE


Project In-charge Project Manager