Name of Project - Development of Sewerage System Involving STP Trunk Sewer Allied Works Including 5 Years of Operation Maintance

Design of 6.0 MLD Sewage Terminal Pumping Plant at Children Park Nanital
1.85 1.85 4.87
Hazen Williams hf=10.7. Q .L/(C . D )
Entry &
pipe Peak Flow Pipe Size Area Based Velocity Length (approx) Pipe coeff. Entry Exit
Material of const. Pipe Loss Exit Head Loss (m)
3 3 2
From To m /hr m /sec ID mm(D) on ID m m/sec V mts L C K K Loss
From Raw Sewage Sump
251.25 0.070 250.00 0.0491 1.42 1800.00 DI 140 1 12.81 0.10 12.91
to chainage zero of Rising Main
A= 12.91
Fittings K- values are taken from Table 6-4 from Perry's Chemical Engineers Handbook- By Don W. Green/Robert H.Perry (8th edition)

Bend Tee Valve

Coupling Union

Water Meter
Bell Mouth

Resin Trap
Y- Strainer
Reducer
Main (along
Head Loss (m)

(entering

Butterfly
Branch
square

Diaph.

Check
Globe

Angle
11.25

miter

Gate

Foot
22.5

Plug
run)
run)
180

Ball
Pipe Size

45

90
From To K val 0.10 0.10 0.20 0.20 0.45 1.50 1.30 1.30 1.00 0.40 0.90 10.00 2.30 0.24 9.00 0.05 2.00 2.00 15.00 0.60 3.00 0.04 7.00 0.50
From Raw Sewage Sump
0 3 0 3 0 1 1 1 1 1.52
to chainage zero of Rising Main
m B= 1.52

discharge point elevation 1955 Note: Refer HGD Calculations. (A+B) = 14.43

Lowest level of liquid in


1943.70 C= Consider 10% extra margin = 15.88
Raw Sewage Sump
Pumping Plant Design Static Head (MAX) D= 11.30
Static Head (INCLUDING RESIDUAL & PUMP LOSSES) 14.30
3
m /h Av. Flow say (10% M)
Total Peak Flow = 251.25 or 4187.5 lpm say 255 100.5 110 Total Head (m) 30.18
r
Head = 31 m PUMP I PUMP II PUMP III Total Pump Head Required (m) 31
3 3
m / 3 m / Provide pump head Say
Hence, flow of each pump 110 220 m / hr 330 31
hr hr
Say efficiency of pump= 65%
Pump power P= (1 m3/h) (1000 kg/m3) (9.81 m/s2) (19 m) / (3.6/10^6)/ƞ
Each Pump power P= 14.30 KW 28.59 KW 42.89 KW
Applying Pump Motor PUMP I: Provide 1 nos Raw sewage pump for Lean flow
17.15 KW 32.88 KW 49.32 KW
rating of P= PUMP II: Provide 1 nos Raw sewage pump for AV. flow
Say 18.50 KW 37.00 KW 55.00 KW PUMP III: Provide 1 nos Raw sewage pump for Peak Flow
HP kw x 1 / 0.745 23 HP 44 HP 66 HP
Say 25 HP 50 HP 75 HP
Total Nos of Pump 1 Nos 1 Nos 1 Nos
Provide 3 pumps for Raw sewerage pumping machinery
Hence, Provide Raw sewage pumps of 15 HP - 1 Nos of 110m3/hr for Lean Flow , 25 HP - 1 Nos of 220 m3/hr for Average Flow & 40 HP - 1 Nos of 330m3/hr
for Peak Flow including standby , total Head= 31 m for Each Pump