Design of 6.0 MLD Sewage Terminal Pumping Plant at Children Park Nanital
1.85 1.85 4.87
Hazen Williams hf=10.7. Q .L/(C . D )
Entry &
pipe Peak Flow Pipe Size Area Based Velocity Length (approx) Pipe coeff. Entry Exit
Material of const. Pipe Loss Exit Head Loss (m)
3 3 2
From To m /hr m /sec ID mm(D) on ID m m/sec V mts L C K K Loss
From Raw Sewage Sump
251.25 0.070 250.00 0.0491 1.42 1800.00 DI 140 1 12.81 0.10 12.91
to chainage zero of Rising Main
A= 12.91
Fittings K- values are taken from Table 6-4 from Perry's Chemical Engineers Handbook- By Don W. Green/Robert H.Perry (8th edition)
Coupling Union
Water Meter
Bell Mouth
Resin Trap
Y- Strainer
Reducer
Main (along
Head Loss (m)
(entering
Butterfly
Branch
square
Diaph.
Check
Globe
Angle
11.25
miter
Gate
Foot
22.5
Plug
run)
run)
180
Ball
Pipe Size
45
90
From To K val 0.10 0.10 0.20 0.20 0.45 1.50 1.30 1.30 1.00 0.40 0.90 10.00 2.30 0.24 9.00 0.05 2.00 2.00 15.00 0.60 3.00 0.04 7.00 0.50
From Raw Sewage Sump
0 3 0 3 0 1 1 1 1 1.52
to chainage zero of Rising Main
m B= 1.52
discharge point elevation 1955 Note: Refer HGD Calculations. (A+B) = 14.43
TCP WWNTL - 01