Professional Documents
Culture Documents
DC-6000S / 8000S 2 /
10000S Connecting
Kit
Installation Manual
Provided By
http://www.MyBinding.com http://www.MyBindingBlog.com
DBM-120
CONNECTING KIT
(MODEL: DC-6000S/8000S 2/10000S)
INSTALLATION MANUAL
TABLE OF CONTENTS
1. Standard Accessories ..................................... 1
Collator .................................................... 7
2-6. Connecting the Suction Collator .............. 7
q w e r
t y
DBM-120
CONNECTING KIT
(MODEL: DC-6000S/8000S 2/10000S)
INSTALLATION MANUAL
1
2. INSTALLING PROCEDURE
2-1. Releasing the DBM-120 Lock
Stop button
Escape Clear
button button
Function Jog dial/Enter button
button
q Press the (Escape) button once at the initial screen of the display on the control panel.
2
2. INSTALLING PROCEDURE
Select M. Mode
ROM Version
If the version of the EPROM of the DBM-120 is 11C-80033 or more, it need not be replaced. If the version is 11C-80032
or less, replace the EPROM.
NOTE : Be sure to replace the EPROM if the version is 11C-80032 or less, or the DBM-120 will not operate.
3
2. INSTALLING PROCEDURE
q Press the (Escape) button once at the initial screen of the display on the control panel.
4
2. INSTALLING PROCEDURE
Select M. Mode
ROM Version
Select Collator
DC-1O DC-6/8 Su
r Turn the jog dial to select “Suction”. The selected collator shifts to
the beginning of the line and
starts blinking.
Select Collator
Suction
NOTE : If the collator set at the control panel of the DBM-120 and the collator actually connected differ, the
DBM-120 will not operate normally.
5
2. INSTALLING PROCEDURE
1 Check the version of the EPROM in the ROM number check mode of the suction collator.
(1) Press the numerical keys on the control panel in the following order. 1 → 2 → 3 → 4 → 5 → 6
(2) Press the STOP key. The ROM number will be displayed on the display window as follows.
∗ For DC-6000S, up to “C-?” will be displayed. For DC-8000S 2, up to “d-?” will be displayed.
NOTE : The DBM-120 will not operate normally with EPROMs of versions below the versions indicated above.
Use the same EPROM versions for all towers connected.
6
2. INSTALLING PROCEDURE
1 Push down Pin 6 of DIP switch 2 on the control panel of Tower A of suction collator (to the
number side).
OPEN
DIP switch 1
DIP switch 2
12345678 start
stop
DIP switch 2
DIP switch 4
DIP switch 3
DBM-120 cabinet
Connecting plate Screws
Connecting plate
3 Tighten the screws temporarily secured in step 1, and secure the connecting plate.
7
2. INSTALLING PROCEDURE
(0.12" to 0.28")
3 to 7 mm Paper ejection rollers
Pillar
Screws
w Loosen the nut fixing the bolt inside the pillar, and
turn the bolt to adjust the height of the LU-HM exit.
Fixing nut
NOTE : Adjust so that the operating and non-
operating sides of the LU-HM exit
become the same height. Down Up
8
2. INSTALLING PROCEDURE
6 Turn on the power supply of the DBM-120, and set to the A3 size.
Refer to “6-1. Basic Operation” in the instruction manual of the DBM-120 for details on
setting the paper size.
7 Adjust at the long holes of the connecting plate so that the A3 mark on the indication label of
the DBM-120 faces the LU-HM exit jam sensor side facing up, and tighten the screws
temporarily secured in step 2 to secure the connecting plate and LU-HM.
A3
Communication cable
Screws
9
2. INSTALLING PROCEDURE
Connecting plate
Cable clamps
NOTE : Move the DBM-120 unit to and fro when changing the paper size. Move aside the power cord so that it does
not touch the DBM-120 at this time.
10