Professional Documents
Culture Documents
Energi Transisi Di Indonesia 1
Energi Transisi Di Indonesia 1
Halmahera
FSRU 2 LNGC Ternate Timur Biak
Kalbar (Hub)
Manokwari
Jungkat Kalsel Source DONGGI SENORO TANGGUH
Serui 1 LNGC
Kalteng Tangguh Sulbagsel
Kolaka FSRU (HUB) Nabire Jayapur
Kendari a
Ambon
2 LNGC Bau Peaker Timika
Makassar Bau
Cisem: 281 km FSRU
FSRU Jatim
BALI (HUB) Sumbawa Flores Maumere
Description
2. NUSA TENGGARA CLUSTER
Transmission Pipeline (existing) 12 PLTMG (62,18 BBTUD)
PTransmission Pipeline (Plan) D: 20-inch SOURCE LNG TANGGUH Power plant location, Ministerial Regulation
249/2022 (Note: At certain points a number of
LNG Terminal FSRU power plants in one location)
Source LNG
LNG Carrier
www.migas.esdm.go.id Halo Migas Ditjen Migas @halomigas @halomigas Halo Migas Ditjen Migas Contact Center ESDM 136 10