You are on page 1of 1

CONVERSION OF DIESEL-FIRED POWER PLANTS TO GAS AND THE DEVELOPMENT OF

GAS INFRASTRUCTURES TO MEET POTENTIAL DEMAND

3. SULAWESI & MALUKU CLUSTER


14 PLTMG (128,09 BBTUD)
SOURCE LNG TANGGUH

KEK Semangke 1. KALIMANTAN CLUSTER


5 PLTMG (47,78 BBTUD) 1 LNGC
Dusem: 400 km SOURCE LNG TANGGUH
4. PAPUA UTARA CLUSTER
Gorontalo Minah 11 PLTMG (32,80 BBTUD)

BADAK (HUB) asa Halmahera SOURCE LNG TANGGUH

Halmahera
FSRU 2 LNGC Ternate Timur Biak
Kalbar (Hub)
Manokwari
Jungkat Kalsel Source DONGGI SENORO TANGGUH
Serui 1 LNGC
Kalteng Tangguh Sulbagsel
Kolaka FSRU (HUB) Nabire Jayapur
Kendari a
Ambon
2 LNGC Bau Peaker Timika
Makassar Bau
Cisem: 281 km FSRU

FSRU Jatim
BALI (HUB) Sumbawa Flores Maumere

Cilacap LNG Merauke


Lombok Bima
Terminal Peaker
5. PAPUA SELATAN CLUSTER 2 LNGC
5 PLTMG (12,08 BBTUD)
FSRU (HUB)
1 LNGC Kupang SOURCE LNG TANGGUH

Description
2. NUSA TENGGARA CLUSTER
Transmission Pipeline (existing) 12 PLTMG (62,18 BBTUD)
PTransmission Pipeline (Plan) D: 20-inch SOURCE LNG TANGGUH Power plant location, Ministerial Regulation
249/2022 (Note: At certain points a number of
LNG Terminal FSRU power plants in one location)
Source LNG
LNG Carrier

www.migas.esdm.go.id Halo Migas Ditjen Migas @halomigas @halomigas Halo Migas Ditjen Migas Contact Center ESDM 136 10

You might also like