Professional Documents
Culture Documents
inistrat
929,3
io Adm
Edific
2
6
187,2
Plano Clave
1:25,000
152.5 753.1
187
895.8
Concrete Blocks
Vertical Curb
300
Not Paved Cement Stabilized Crushed Stone
300
Graded Broken Stone
0 ISSUED FOR CONSTRUCTION 2021-05-10 Zhang Yong Chang Zhanwei Wu Zhefeng NOTES: PROJECT: DRAWING TITLE: SCALE :
CLIENT: DESIGNER : A1: 1:1250
F For revision 2020-10-20 Zhang Yong Chang Zhanwei Wu Zhefeng 1.The dimensions are in meters. A3: 1:2500
E For revision 2020-09-21 Zhang Yong Chang Zhanwei Wu Zhefeng 2.The total length of the Vertical Curb is 3246m.
D For revision 2020-08-18 Zhang Yong Chang Zhanwei Wu Zhefeng Chancay Multipurpose Terminal New First Stage, Peru DATE :
C For revision 2020-03-23 Zhang Yong Chang Zhanwei Wu Zhefeng Layout Plan For Curb Of CI Area 2021-05-10
中远海运港口秘鲁钱凯公司 2020-03-20 Zhang Yong Chang Zhanwei Wu Zhefeng Detailed Engineering
COSCO SHIPPING Ports Chancay PERÚ S.A. CCCC Water Transportation Consultants Co.Ltd B For revision CODE : REVISION:
Rev. DESCRIPTION DATE BY. CKD. APD. AUD.
The Ports for ALL P114143-E-000-RY-DWG-028-R0 R0
REVISIONS