E = 254105.338
3@4000=12000 3680
E= 254099.654 N = 8717932.848
N = 8717947.462 2 100
3 3
Geotextile(150g/cm -200g/cm )
50~80
Expansion joint
7@4000=28000
1 1
3 3
Geotextile(150g/cm -200g/cm )
Two overlapping
construction joint
E= 254073.558 2 E= 254079.242
N = 8717937.312 N = 8717922.699 6
Asphalt Rubber
60
175 175
30 dowel Antirust Coating
@300
Slab Division For Basketball Court Area 100
1:200
230 230
4000
260
5@300=1500
T16 steel bar, L=1000mm
Soil Classification First Maintenance
Pits or box drain
Spreading Spreading
180
4000
1/m 2 1/m 2
6@300=1800
Mainly dust suppression
260
Main Technical Parameters of Asphalt Rubber Plan of reinforced steel around pits or box drain Layout plan of dowel in joints
1:40
Cement Stabilized Crushed Stone 150mm Cement Stabilized Crushed Stone 150mm
15680 28000
1-1 2-2
Horizon 1:100 Horizon 1:100
Vertical 1:40 Vertical 1:40
0 ISSUED FOR CONSTRUCTION 2021-05-10 Zhang Yong Chang Zhanwei Wu Zhefeng NOTES: PROJECT: DRAWING TITLE: SCALE :
CLIENT: DESIGNER : 1.Dimensions are in millimeters, except where indicated. A1: 1:20
F For Revision 2020-10-20 Zhang Yong Chang Zhanwei Wu Zhefeng 2.This project should be carried out after the underground construction is completed. A3: 1:40
E For Revision 2020-09-21 Zhang Yong Chang Zhanwei Wu Zhefeng 3.Characteristic yield strength of reinforcement and dowel is not less than 420MPa.
D For Revision 2020-08-18 Zhang Yong Chang Zhanwei Wu Zhefeng 4.The bending strength of concrete is 5.5MPa, and the bending modulus is 33GPa. Chancay Multipurpose Terminal New First Stage, Peru DATE :
C For Revision 2020-04-09 Zhang Yong Chang Zhanwei Wu Zhefeng 5.Dowels in slabs with other dimensions than 4m X 4m and odd-sized slabs shall be arranged in the same dowel spacing and
Slab Division Drawing For Basketball Court Area 2021-05-10
中远海运港口秘鲁钱凯公司 2020-03-30 Zhang Yong Chang Zhanwei Wu Zhefeng length compared with those in 4m X 4m slabs. Detailed Engineering
COSCO SHIPPING Ports Chancay PERÚ S.A. CCCC Water Transportation Consultants Co.Ltd B For Revision CODE : REVISION:
Rev. DESCRIPTION DATE BY. CKD. APD. AUD. 6.Dowels shall be coated with a bond-breaking substance to prevent bonding to the PCC during the construction period.
The Ports for ALL
7.The need for expansion joints due to the size of the area shall be evaluated ahead of construction and approved by the Engineer. P114143-E-000-RY-DWG-024-R0 R0
REVISIONS