You are on page 1of 1

ilding

e Bu

929,3
nistrativ
Admi

2
6
187,2

Key Plan
1:25,000

1193.1

439.7 513.1 115 24 32.3 16 15 20 18

20
Main Tunnel Highway

Extension Road
12.8
14.7

Office Area

Ro-Ro Stock Yard Area

Trouble Control Area


Empty/Heavy Container Yard and CFS Parking Area

Main Entrance/Export Road

14.7

262.4 16.8 462.1 34 120.4

895.7

LEGEND:

Type 1 Type 2 Type 3 Type 5 Type 6

Type 11 Type 12 Unpaved Area (Green area)

0 ISSUED FOR CONSTRUCTION 2021-05-10 Zhang Yong Chang Zhanwei Wu Zhefeng NOTES: PROJECT: DRAWING TITLE: SCALE :
CLIENT: DESIGNER : A1: 1:1250
F For Revision 2020-10-20 Zhang Yong Chang Zhanwei Wu Zhefeng 1.The dimensions are in meters. A3: 1:2500
E For Revision 2020-09-21 Zhang Yong Chang Zhanwei Wu Zhefeng 2.Coordinates system: local topographic coordinates.
D For Revision 2020-08-18 Zhang Yong Chang Zhanwei Wu Zhefeng Chancay Multipurpose Terminal New First Stage, Peru DATE :
3.The final handover elevation, which includes pavement thickness and ground improvement should consist with Drawings: Entrance Complex Elevation System (I)~(III).
C For Revision 2020-03-23 Zhang Yong Chang Zhanwei Wu Zhefeng Layout Plan 2 For Pavement Of CI Area 2021-05-10
中远海运港口秘鲁钱凯公司 2020-03-20 Zhang Yong Chang Zhanwei Wu Zhefeng Detailed Engineering
COSCO SHIPPING Ports Chancay PERÚ S.A. CCCC Water Transportation Consultants Co.Ltd B For Revision CODE : REVISION:
Rev. DESCRIPTION DATE BY. CKD. APD. AUD.
The Ports for ALL P114143-E-000-RY-DWG-002-R0 R0
REVISIONS

You might also like