JS500mixer

Using manual

Foreword
The product instruction is an important component of our company delivered
product to the user, it introduces you the equipment characteristics, uses, working
principle, technical performance, installation commissioning, operation,
maintenance, machine malfunctions and other aspects of the treatment, with special
emphasis on the safe operation and environmental protection measures.
The staff involved in the management, operation and maintenance of the
equipment, the instruction is required reading information, it is not only effective in
helping you to use the equipment and play best economic benefits, but also avoid
equipment damage and accidents happen.
Please note:
Please strictly follow the requirements of this instruction for installation and
operation
Please must use the equipment parts of our company provide or recommend,
in order to protect the performance of this equipment.
If a major equipment failure, please contact the company with me!
The instruction has two with the equipment, a custodian must be filed to
prevent the loss will affect your use!

1.
Our company will continue to improve product, improving content will not be
notified!

Welcome to the ideas, Thank you for your cooperation!

Catalogue
First, Product uses and characteristics………………………………4
Second, the technical parameter……………………………………....4
Third, structure and operation principle……………………………....5
Fourth, matching and selection requirements………………………...7
Fifth, Notes of users order……………………………………............8
Sixth, equipment installation and commissioning……………............8
Seventh, Operating note………………………………………...........10
Eighth, Maintenance and repairs……………………………………..11
Ninth, Common Faults and exclusion method……………………….13

2.
1 The type of the products and scope of application
This machine belongs to pair and poaches the forcing type concrete
mixer of the axle . Suitable for industry and civil construction work
such as all kinds of medium and small-scale factory and highway ,
bridge , water conservancy , quay of prefabricated components, can stir
rigid concrete , plasticity concrete , mobile concrete , light aggregate
concrete and various sand thick liquid . Can formate and stir standing
with PL800 batching aircrew simple and easily even except as the
implementation of single machine, can also stir the related host
computer of the station as HZS25 .

2. Main technical parameter


Type JS350 JS500
Charging capacity (L) 560 800
Output material capacity 350 500
(L)
Productivity (m /h ) ≥17.5 ≥25
The largest foot- Cobble 60 80
paths of Broken
40 60
aggregate mm stone

the stiring Rotational 35 35


speed(r/min)
blade Quantity 2×6 2×7
Mixing type Y160L—4 Y180M—4
Motor Power (KW) 15 18.5
raised type YEZ132S—4—B5 YEZ132S—4—B5
Motor Power (KW) 5.5 5.5
Water type 50DWB20—8A 50DWB20—8A
pump Power (KW) 0.75 0.75
Promotion speed of the hopper m/min 18 18
External dimension the transport state 2850×2300×2680 3050×2300×2680

3.
mm Working state 4461×2850×5225 4461×3050×5225
Long * wide
Weight * high
of the complete machine 3700 4000
3. Structure(Kg)
principle
JS350, Model JS500 concrete mixer are by material loading, stir ,
unloaded the material , water supply , electric part to make up . See
Fig. 1 in structure of the complete machine.
3.1 Stiring system
Stiring system by motor , belt pulley , decelerator , gear wheel of
turning on etc. , stir pot , stir device , support oil device ,etc. to make
up. Structure its sketch meet picture 2 , 3 , 4.
The motor drives second gear wheel decelerator through the belt,
decelerator two output shaft getting which run from opposite directions
gear wheel drive two mixing that level dispose axle reverse to turn
round at the same speed separately through two.
The arc part of stiring pot is welded , stir and stud with the welt in the
pot, link and fasten with the countersunk head screw and pot body .
Stir pot contain two mixing axle that competence dispose , each axle
is equipped with and stired the blade respectively. Close to stir pot
mixing arm of both ends equip with side blade separately , can wipe
concrete of terminal surface off. The blade and welt interval JS350≤
4mm, JS500≤ 5mm.
There are special seal installations in the associative place of both
ends of pot to stir the axle and stir, for guarantee sealed quality , have
strong oil pump on terminal surface to stir pot , can carry to axle seal
installation support the oil conveniently.
3.2 Material loading system
Material loading system have roll raise organization , material
loading shelf, hopper ,etc. make up. See Fig. 5.
The motor drives reel turning through the decelerator to apply the
brake, steel wire rope draw through pulley hopper climb along a track
of material loading upwards, when climbing to certain height, a pair of
gyro wheels on the material sluice gate enter a horizontal fork of
material loading, the sluice gate is opened automatically, the supplies
are put into and stired in the pot through the charge-in funnel . In order
to guarantee the hopper takes one's place accurately , the limited
location switch is put on the material loading shelf. There are two limit
location switches in the ceiling location , to raising limit location and
4.
security protective action on the hopper separately. Lower limit
location have only one limit location switch, install and pay on the
guide top . Drop to as hopper ground hole at the bottom , slightly loose
steel wire rope have , spring lever organization make location
movements of lower limit, stop automatically in a mechanism of
raising .
The electrical machinery can guarantee the hopper is while running at
full capacity to apply the brake , suspend in the arbitrary position
reliably , making the size of the motive force square, the big nut with
the back seat of electrical machineries is adjusted.
3.3 Water -supply system
Water-supply system by water pump, electrical machinery, wash
device , spray water device ,etc. make up, see Fig. 6. Start water pump,
can pour into , stir tube water, floodgate valve can regulate the flow of
ink , when the total amount is controlled by the time relay to supply
water, accuse of when the button is rotated to " " to the position, the
water pump will operate and stop automatically according to the time
when set for , when the button is rotated to the " manual position ", can
supply water in succession .
3.4 Unload the material system
The system is made up from mechanisms such as the material door ,
electronic push rod ,etc. of unloading to unload the material. In order to
unload the material manually JS350 type, there is no electronic push
rod organization. Unload the material door and install it on the mixer
bottom , through the electronic push rod , realize that unloads the
material flexibly. To prop up seat install at chassis , in unload material
about all equip with one limit location switch above the door electronic
push rod, in order to control , unload material door hold , close position
, can guarantee , unload through position to adjust sealing strip material
door seal. JS500 unload material handle for meet an urgent need ,
unload material lose electrical power temporarily , and electronic push
rod unload to spend material when not working, should pull down it at
ordinary times , hurt one's feeling with the room . When the JS500
handle is used, should uncouple the electronic push rod . See Fig. 7.
3.5 Electric system
Electric system principle picture see 8 Fig., electric component see
the list first. Electric to control circuit have automatic switch ,
exchange contactor , have , short out , protect, overload protection , the
5.
broken function that protects . The control button is fixed up on the
case door of the distribution, there are locks, there are protection covers
outside the button.
Form one Electric component form

Serial Type and


name Code name Quantity Remarks
number specification
1 Heat relay FR1 JR16-60/3D28-45A 1
2 Heat relay FR2 JR16-20/3D14-22A 1
Alternating
3 KM1 KM2 KM3 CJT1-40/380V 3
contactor
4 Alternating KM4 CJT1-20/380V 1
contactor
5 Middle relay KA1-KA3 JZ7-62/380V 3

6 the master K LS2-2 1


Switch
7 button SB1-SB9 LA2 500V 9 Green5 red 4
8 Fuse box FU1 RL1-60/45 3
9 Fuse box FU2 RL1-15/4 2
10 Air switch QF DZ10-100/320 1 380V/60A
11 Signal lamp HL1 KL2 XD13-380V 2 Green

12 Journey switch SQ1 SQ2 SQ4 LXK3-20S/D 4


SQ5
13 Journey switch SQ3 LXK3-20H/B 1
14 Time relay KT JSIISX-8/380V 1
4 . Form a complete set and select the requirement for use
4.1 Related range of products
4.1.1 Supplementary measure the equipment machine subject and parts
of the state.
4.1.2 Random tool
4.1.3 Random technical data
4.2 User related range select for use, require
4.2.1 This machine should be allocated and defended the canopy.
4.2.2 Allocate and exchange 380V three-phase Line four and make
6.
distribution power .
4.2.3 Allocate running water source(have running water place of source
, should dispose fresh water source of water and capacity 1- for 180L
more than water tube ).
4.2.4 The grit batching equipment can select PL800 batching machine
for use .
5. Users order goods to must know
5.1 Understand the technical feature of the one machine and related
range;
5.2 When this machine is dispatched from the factory, make the track,
the ladder, prop up obliquly, prop up sideways , prop up leg,foundation
bolt and Suck water pipe as parts state , other all part load the state with
for the whole aircrew;
5.3 This machine selects the load trucking service of ≥ 5T for use; As
follows:
5.5.1 Should notice machine weight does not get skew , should hoist
steel wire rope hanging in chassis hoisting hooking accurate hoist ,.
5.4 Hoist the hoist that should select ≥ 8T for use ;
5.5 Should be safe , reliable while the complete machine is shipped,
concrete requirement
5.5.2 The track is tied with the iron wire to ship at present, the hopper
is applied the brake to sell regularly.
5.5.3 Complete machine and parts firm and steady planted agent have
in carriage。
5.6 Order alone of the electronic push rod.
6. Install and running-in
6.1 Installation of the machine
6.1.1 The installation field needs levelling, the foundation is solid , the
outline near coal-mine of ground is higher than the ground , in case
Stop the rivers like in the hole , see Fig. 9 in ground picture.
6.1.2 Hoist out the mixer with the jack-up equipment, install four legs,
prop up sideways , prop up obliquly , the ladder Son, install the track of
making , make it aim at and put like in the ground hole . Should pay
attention to the making machine at the time of installation Shelf keep
on one horizontal plane, track shelf can't be sprained and misplaced
outside.
6.1.3 Should consider the power in machine installation, the source of
water , the rain-proof measure in the supplies field and transportation
7.
passway Wait for the related project.
6.2 Inspection and preparation before the running-in
6.2.1 check every gearbox is sufficient and good or not and each
lubricate the position lubricating oil (fat ).
6.2.2 Check the power voltage: Specified voltage 380V, the error is ±
10%.
6.2.3 Check whether the wiring of the electrical machinery and electric
component is firm , the distribution case outer cover must be reliable
Earth,its earth resistance ≤ 4Ω. Must receive the wiring in the
distribution case in Line zero of the power On the board N, all pipeline
should be dealt carefully with, in case damage by pressure and damage
the thing of causing at the time of the work So.
6.2.4 Check whether every position hookup bolt is firm , especially the
hookup of the sport part, such as Should tighten to become flexible
immediately. Is it correct to check the turning on type gear wheel and
clench the teeth.
6.2.5 Check steel wire rope neat to arrange , on reel , have loose to
should twine well again。
6.2.6 Check and stir it in the pot, have foreign matters that are piled up
in the hopper and on the track shelf .
6.2.7 Check the hopper applies the brake and sells and pulls out and
inserts in selling set.
6.3 Unloaded running-in
6.3.1 Start the stiring motor, two stir axle turn to instruct first direction
with the sign Cause, if the direction is wrong, should change power
wiring .
6.3.2 Start roll raise motor promote hopper , hopper rise to unload
material at the position, should be by oneself Stopping, the sluice gate
is opened, the hopper is in running , if motor cut out, apply the brake
the electrical machinery Apply the brake , live in hopper , have hopper
glide phenomenon to greater than 150mm at this moment , prove Make
power to be square partial and little , should adjust , apply the brake big
nut of electrical machinery, in order to increase , make power square.
Hopper drop,, can't block in horizontal fork place, drop , get hole at the
ins and outs, steel wire The rope is slightly loose, drop journey switch
namely movement , stop by oneself in a mechanism of raising .
6.3.3 Start the unload material organization , unload material door turn
on to close and should be put in place accurately。
8.
6.3.4 Start water pump (add channel water , ) fetch water , water -
supply system should run well .
6.3.5 Supply water normally,, stop starting in 30 minutes, such as
sucking frely, should overhaul the bottom valve .
6.4 Heavily loaded running-in
6.4.1 Confirm person who supply water according to necessary
concrete matching , regulate time relay reach not corresponding Time
of supplying water.
6.4.2 Start the stiring electrical machinery to operate.
6.4.3 Close and unload the material door , join necessary mixture in the
hopper , , promote the hopper, material Fighting should operate steadily
and can stop freely in the arbitrary position of the track , if skid now
Alike, should put hopper into the bottom of the hole now , then adjust
the big nut applying the brake on the electrical machinery. Material
Fight promotion to be normal, after apply the brake reliable, to stir pot
throw the material, start the water pump at the same time Turn towards
and stir supplying water in the pot.
6.4.4 Stir for 25- 3 seconds , , start and unload the material door and
unload the material .
6.4.5 In the course of above several running-in, if find the abnormal
situation , should shut down immediately Check , fix a breakdown ,
then test again, until normal.
7. Operation precautions
7.1 After putting through the power with machine, power indicator
lamp and indicator lamp of the trouble are on.
7.2 when mixer working , , develop switch should shut off。
7.3 At the time of hopper promotion, forbid , stand people under
hopper, so as not to accidentally injure.
7.4 The machine is stired in the course, can't shut down at will, if the
middle happen accident is must immediately Open and unload the
material door , by drawing off 50% of the supplies artificially , fix a
breakdown , start . Attention: Artificial must close the power while
unloading the material.
7.5 The machine is in the course of operating, can't overhaul .
7.6 Operate it among the course, make sure not to make sand ,
stone ,etc. fall into the operation position of the machine, hopper
bottom The supplies clung should be cleaned out in time, so as not to
influence the opening and closing of the sluice gate.
9.
7.7 The machine does not have the ultra load to throw the material and
operation。
7.8 When the machine quits work, should open and wash the switch ,
start the water pump and wash and stir in the pot Concrete.
8. Maintain and maintenance
8.1 Project that should be checked before the per tour is used
8.1.1 Check whether the fuselage is steady。
8.1.2 The blade and stiring the hookup bolt on the arm to become
flexible, if become flexible and should tighten immediately . Very new
machine should fasten the blade , welt and stir the arm again after using
an order of classes Hookup bolt. Guarantee the interval value between
the blade and welt invites 5mm.
8.1.3 Whether the hookup bolt on the material loading shelf is fastened.
8.1.4 It is sufficient that the water pump channels water , the pipeline is
unblocked.
8.2 Maintenance after the per tour is used
8.2.1 Clear up and stir it inside and outside the pot, unload the material
door , accumulating the dust on the hopper, rinse well with water. Can't
store things in the hopper.
8.2.2 Cut off the power, lock the electric control cabinet。
8.2.3 To each lubricating a bit , annotate the lubricating oil (fat )。
8.2.4 Cold season, should to deposit water all net row water-supply
system。
8.2.5 Clear up it well , should unload the material door and put it
unloading the material state .
8.3 Check the project and maintain every week
8.3.1 Check the steel wire rope , and is getting up on the surface and
daubing a little butter, the steel wire rope is being worn and torn to and
sure After the degree , should change .
8.3.2 Check the gearbox oil amount, the oil amount of the strong oil
pump, in case of necessity, annotate and change newly Oil .
8.3.3 Water -supply system yes keep clean, so as not to stop up, the
valve is checked and washed once to absorbing water。
8.3.4 Check whether the journey switch rocker arm becomes flexible, if
become flexible , do essential adjustment.
8.3.5 Check the blade , stir the arm to link the bolt and become flexible,
adjust it among the blade and the pot wall The crack , carry on essential

10.
tightening.
8.3.6 Every electrical machinery , electric component wiring can't have
phenomenon of becoming flexible , check and exchange the contactor
Contact situation, distribution dust of case should go on , clean, every
limit location switch can't enter water .
8.4 Project checked regularly
8.4.1 check to a brake of the raises electrical machinery, adjust
properly.
8.4.2 Check to the water pump, choke valve, have phenomenon of
leaking。
8.4.3 Check to the turning on type gear wheel, adjust the elasticity of
the belt, so as not to skid.
8.4.4 Check the wearing and tearing situations of the blade , welt, and
change according to the circumstances.
8.4.5 Check the sensitive and damaged situation of every journey
switch, and repair or change according to the circumstances.
8.5 Improve management system of operating , finish machine run and
write down , when working in succession, should do Record in order to
relieve.

11.
9. Common trouble

Serial Characteristic of the method to get rid


Reason produced
number the trouble of
a. The track can not be Adjust the parallel
The electrical roll installed parallelly degree of track.Adjust
1 raisemachinery to b. The interval the electric
be overheated separating of moving mechanism and move
device of electric and separate the
mechanism is too small interval
There are foreign Remove the foreign
can not open the
matters to fill in the matter
2 unload material
sealed boardsthe unload
door
material door Wash every day,
The mortar
The end of the axle Float and sealpiled up in
damaging prevent
Changethe
themortar
float
3 leaks the thick Float and seal and seal ,Wash, add
liquid lubricate inside enough lubricating oil
insufficiently
Link the bolt and
the Stir blade , The
become flexible, it is Fasten the hookup
4 stir arm , welt are
not smooth to hold the bolt, transfer board
not hard up
board
A noise ofthe
5 raising decelerator The bearing is damaged Change the bearing
is unusual

12.
mplete machine sketch map of Fig. 1
1. Feeder hopper 2. Material loading shelf 3. raising organization 4.
the Stiring tube 5. the Stiring device
6. the Stiring transmission device 7. Electric system 8. Framework
9. Water -supply system
10. Unload the material organization

13.
Fig. 2 the Stiring device

1. Big gear wheel 2. Support seats 3. Side blade 4. Blade


5 the Stiring arm 6. the Stiring axle

14.
Fig. 4 transmission
1. The case body 2. The second big gear wheel 3. The first big gear
wheel 4. The second small gear wheel
5. Big belt pulley 6. The first pinion 7. Small belt pulley 8. Electrical
machinery
9. Opening type big gear wheel 10. Opening type small gear wheel

15.
Fig 6 water supply system
1. spray water pipe 2 water inlet 3 flushing pipe 4 sluice valve 5 slucie
vale 6 water resouce 7 water absorbtion tube 8 water pump
16.
Fig 7 Material discharge door seal

1.Plate iron 2 mixing tank 3 seal plate 4 dicharging door

17.
18.