Professional Documents
Culture Documents
Cylinder
Traction roller
Gap 0.8mm
Pls adjust the gap between traction roller and the bottom metal roller to 0.8mm by TOP SCREWS.Note:The wheel of the
traction roller is inclined,so it is necessary to rotate the traction roller,at the same time to use a feller gauge to detect the gap
in each place,and ensure that it is at 0.8mm gap. When running the pelletizer,wait for the material to flow smoothly before
feeding to pelletizer.
After adjust the gap to 0.8mm,fix the top screws by thread sealant.When running the machine,it should be
shake,if not use thread sealant to fix it,the gap will change.