Professional Documents
Culture Documents
Ngltech
Ngltech
and Services
Table of Contents
Contents
Corporate Overview ................................................................................................................................................................................. 2
Facility ....................................................................................................................................................................................................12
Capabilities
• Fast turnaround during outage
Services
• Inspection and site overhaul/repairs
• Spare part management
• Machine Monitoring System (MMS)
• Third party inspection
• Detailed appraisal reports
• Site survey
• Balancing
• Repair and service capability for steam turbines and supplementary • Improve equipment reliability
and availability
products—gearboxes, power recovery turbines, blowers, fans, pumps
and ancillary equipment • Reengineering for obsolete and
non OEM supported spare parts
• Controlling systems upgrades/retrofits
• Dynamics and structural analysis of equipment and parts
• Field service support
• High customization upgrade and
re/de-rates in response to changes
in operating conditions
Services
• Precision spare part manufacturing
• Condition and residual life assessments
• Machine Monitoring System (MMS)
• Energy audits for ensuring optimal performance of assets
• Balancing
Services
• Site overhauls including bundle changes and dry gas seal replacement • Reliable alternative for OEM
• Bundle and rotor workshop overhauls
• Replacement of wet gear couplings with modern flexible elementalternatives
• On-site complete refurbish and retrofit of gas compressor stations
experience in repair and rewind capability for electric motors up to 12.8kV and • Increase equipment life and
efficiency
10 MW.
• Residual life expectancy analysis
Capabilities
• Fully equipped machine shops for reclamation and manufacturing of spare
parts
• Full rewinding facilities from fractional H.P. to 10 MW
• Dynamic balancing for rotors up to 12 tons
• Every motor is test run at its rated voltage (up to 6600 volts) prior to
dispatch
• Authorized repair facility for: NGLTech, Mather and Platt, Brooke Crompton,
Alstom, ABB, Harland and AEMT–UK for explosion proof motors
Services
• High voltage, medium voltage and low voltage motor rewinding and
overhaul
• D.C. motor repair
• Repair and overhaul of explosion proof motors by trained and certified
personnel
• Vacuum Pressure Impregnation (VPI)
• Submersible motors repair
NGLTech extends and improves equipment life by managing assets from design
• Improve equipment efficiency,
phase through installation and maintenance including repair and upgrades. performance, availability and
reliability
• Maintenance strategy
• Increased HSE performance
• Conditioning monitoring
• KPI driven contracts
• Vast experience as OEM and service provider of rotating equipment,valves
and flow control
• Workshop repair, overhaul and
• Network of service centers around the world to support our upgrade service
customers
• Competency matrix model to cover your needs • Reduced inventor
Equipment
Benchmarking
Inventory Maintenance
Management Strategy
Spares Reliability
Optimization Asset Management Services
Root Cause
Analysis
Services
• Complete turnkey operation models
• Maximization of uptime and efficiency of oil and gas and power installations
• Maintenance planning and scheduling
• Execution of scheduled outages
The Challenge
• Sand/erosion issues: pumping produced water 77ºC with
formation sand particles
• Service life typically 6-8 months
• Impellers–Zeron 100 heavy erosion
The Solution
• Material enhancement to prevent wear, corrosion and failure
• Shaft drive-polygon bore
• Impellers-solid stellite
• Casing wear ring carriers:
• Adjacent carriers combined
• Anti swirl vanes incorporated
• Locations to casing reduced
• Sealed to casing
The Result
• After 10 months operation wear was negligible
• No sudden failures have been registered
The Challenge
• Improve existing reliability and performance by design
• Resizing of impeller diameters to satisfy target duty
The Solution
• Fundamental design verification of load ratings of components based
on Finite Elements Analysis (FEA)
The Result
• Flow and head increase by 40%
and 20% respectively
• Impeller dimension increase 35mm
contactus@NGLTech.co.id
www.ngltech.co.id
Africa
Bandung Indonesia
RUDIYANA SUPRIADI
DIRECTOR
FINANCE/HR/ADMIN PRODUCTION HEAD
DEWI ANGGRAENI (KEPALA PRODUKSI)
EKO PURWANTO
STAFF STAFF
PPIC ENGINEERING UTILITY WELDER MACHINING MECHANIC
FINANCE HR ADMIN PURCHASING
AMIRAH KHAIRIYYAH VIKRI MUHAMAD Y AGUS PUTRA S NAZARUDDIN N MULYANA ARIF S M. REGI SODIKIN SUKISNO
WAHYU
COORDINATOR Approved
ASISTANCE ADMIN STORE KEEPER
SECURITY 12 April 2021
ASEP/JIMIN TASYA KHOERUNNISA YAYAT RUHIYAT
5
COMPRESSOR KRISBOW KRISBOW V 340 L PS 10 100029561
BAR
6
TABUNG COMPRESSOR REMAJA 2000LITER 2808
7
WELDING MACHINE WIM 300 A/380 V TG3P
8
WELDING MACHINE WIM 300 A/380 V TG3P
9
SAND BLASTING CABINET KRISBOW
10
BENCH GRINDER KRISBOW
11
BENCH VICE KRISBOW
12
WELDING MACHINE CNR 220A
13
SPOT WELDING AUTO SPOT 220A
14
LAS INVERTER DAIDEN 250A EN 60974-1
15
MILLING MACHINE BORING NIGATA
16
VMC (CNC) HAAS VF2
17
MILLING MACHINE BORING STANDARD SM9
18
HACKSAW MACHINE KINGREX 0.25 KW/18MM
19 220
RILON WELDING MACHINE RILON
20 10 TON
BALANCING MACHINE JP BALANCER
21 10 SET ALL SIZE
MEASUREMENT TOOLS MITUTOYO
5 Shaft Radial Roller 2 PCS Rota ti ng/ Mecha ni ca l Works hop NGL PT. Multi Nitrotama Kimia Cikampek 202107043
6 Radial Roller (Roller, Shaft, Stop Ring, Spie) Rota ti ng/ Mecha ni ca l Works hop NGL PT. Multi Nitrotama Kimia Cikampek 202107024
8 Jasa Teknik Perbaikan Bearing Palnt-1 Rota ti ng/ Mecha ni ca l Works hop NGL PT. Multi Nitrotama Kimia Cikampek 202106187
9 Lokal, 8150 (2RH) Reversed Hub Coupling Rota ti ng/ Mecha ni ca l Works hop NGL PT. Multi Nitrotama Kimia Cikampek 202105125
12 New Oil Buffle 3 set Rota ti ng/ Mecha ni ca l Works hop NGL PT. Multi Nitrotama Kimia Cikampek 202105017
13 Jasa Teknik Built-Up Trunion Roller Material CrMo4 Rota ti ng/ Mecha ni ca l Works hop NGL PT. Multi Nitrotama Kimia Cikampek 202105014
14 Jasa Teknik Built-Up Trunion Roller Material CrMo4 Rota ti ng/ Mecha ni ca l Works hop NGL PT. Multi Nitrotama Kimia Cikampek 202105016
20 Bushing Nozzle Rota ti ng/ Mecha ni ca l Works hop NGL PT. Multi Nitrotama Kimia Cikampek 0044/MNK/III/2021
21 Lokal RUD Sprocket Drive Wheel Rota ti ng/ Mecha ni ca l Works hop NGL PT. Multi Nitrotama Kimia Cikampek 202101348
22 Jasa Teknik Sandblast Steam Turbine 2 (Diaphragm) Rota ti ng/ Mecha ni ca l Works hop NGL PT. Multi Nitrotama Kimia Cikampek 202101378
23 New Oil Buffle Rota ti ng/ Mecha ni ca l Works hop NGL PT. Multi Nitrotama Kimia Cikampek 0034/MNK/II/2021
24 Bearing Box Rota ti ng/ Mecha ni ca l Works hop NGL PT. Multi Nitrotama Kimia Cikampek 202101132
25 Jasa Teknik Re-Balancing Rotor Expander 2 Rota ti ng/ Mecha ni ca l Works hop NGL PT. Multi Nitrotama Kimia Cikampek 202101131
29 HEAT SET MACHINE Ma nufa cture NGLTech-works hop PT. Daliatex Kusuma Bandung LKL-MSN-2011001
PT COGINDO
30 PENGADAAN JASA REPAIR ROTOR TURBINE PLTP ULUMBU Rota ti ng/ Mecha ni ca l Ul umbu Jakarta 287.1/SPK/CDB/2020/NGL
DAYABERSAMA
236/COMP-
CALIBRATION & CERTIFICATION BARTON CHART SERVICES
31 Ins trumenta ti on NGLTech-works hop PT. KPM OIL & GAS Jakarta 17R001/SO/IX/2020 DN
(2 UNIT)
REV.0
SERVICE REQUIREMENT 3RD PARTY SEEK SEACOM PT. ARMADA GEMA
32 Rota ti ng/ Mecha ni ca l NGLTech-works hop Jakarta 4500193391
APPROVAL FOR UPDATED NUSANTARA
33 MANUFACTURING CLUTH PLATE FOR P13 A & B Rota ti ng/ Mecha ni ca l NGLTech-works hop PT SAGATRADE MURNI Jakarta PO/202008/01789
34 PENGADAAN SPAREPART MATABOR Pengadaan NGLTech-works hop PT PP PRESISI Bendungan Manikin 4200011263
Bendungan
35 PENGADAAN SERAGAM Pengadaan NGLTech-works hop PT PP PRESISI PO 08
Leuwikeuris
Bendungan
36 PENGADAAN ALAT TULIS KANTOR Pengadaan NGLTech-works hop PT PP PRESISI PO 07
Leuwikeuris
Bendungan
37 PENGADAAN ALAT TULIS KANTOR Pengadaan NGLTech-works hop PT PP PRESISI PO 06
Leuwikeuris
39 PENGADAAN LEG DRILL, ALAT SENAI, BLOWER Pengadaan NGLTech-works hop PT PP PRESISI Bendungan Manikin 4200010614
PT. KRAKATAU
JASA PENGADAAN DAN INSTALASI ELEKTRICAL PROYEK 01/SPK/400001/DIR-
40 El ectri ca l PT. Krakatau Posco PERBENGKELAN DAN Cilegon
LIGHTING YARD RMH PT. KRAKATAU POSCO KPdP/V/2020
PERAWATAN
Bendungan Bendungan
41 PEMBANGUNAN WORKSHOP TAMBAHAN Si pi l PT PP PRESISI 4200010644
Leuwikeuris Leuwikeuris
Bendungan
42 PENGADAAN DUCTING HAUST BLOWER Pengadaan NGLTech-works hop PT PP PRESISI 4200010565
Leuwikeuris
Bendungan
43 PENGADAAN SPAREPART MOTOR DAN BAN PO 04 Pengadaan NGLTech-works hop PT PP PRESISI PO 04
Leuwikeuris
Bendungan
44 PENGADAAN SPAREPART MOTOR Pengadaan NGLTech-works hop PT PP PRESISI PO 03
Leuwikeuris
Bendungan
45 PENGADAAN BAN L300 GT RADIAL SAVERO Pengadaan NGLTech-works hop PT PP PRESISI PO 02
Leuwikeuris
Bendungan
47 PENGADAAN ALAT SAFETY Pengadaan NGLTech-works hop PT PP PRESISI 4200010531
Leuwikeuris
PENGADAAN CARBON RING, COIL SPRING, SIDE SPRING & PT. ARMADA GEMA
49 Pengadaan NGLTech-works hop Ja ka rta 4500197794
SHAFT SLEEVE NUSANTARA
50 MACHINING PART CASE WEARING CIRCULATING PUMP Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. BISETTA Bandung 010/PO-NGL/II/2020
52 REPAIR KRISBOW MANUAL LATHE MACHINE SR. 120 Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. CATUR ELANG PERKASA Ja ka rta 090/PNH/PTM/VIII/2019
COGM-Ja s a Tekni k RE- Bl a ndi ng Rotor Expa nder Pl a nt-2 PT. MULTI NITROTAMA
57 Rota ti ng/ Mecha ni ca l NGLTech-works hop Beka s i 201909125
KIMIA
280/COMP-
59 Ca l i bra ti on & Certi fi ca ti on Ba rton Cha rt Servi ce (3 uni t) Ins trumenta ti on Pa l emba ng PT. KPM OIL & GAS Ja ka rta
18R001/SO/VII/2019
279/COMP-
60 Ca l i bra ti on & Certi fi ca ti on Ba rton Cha rt Servi ce (2 uni t) Ins trumenta ti on Indra ma yu PT. KPM OIL & GAS Ja ka rta
17R001/SO/VII/2019
65 Overha ul ID Fa n (Repl a ce Sha ft) Rota ti ng/ Mecha ni ca l Ba ya h-Ba nten PT. CEMINDO GEMILANG Ja ka rta PO05-C06190400011
66 Penga da a n Rock Wool mecha ni ca l Ba ya h-Ba nten PT. CEMINDO GEMILANG Ja ka rta PO05-C06190400010
022.SPK/REN.05.03/PPBJ.UP2W
69 Ja s a Perba i ka n Fi rs t Sta ge Nozzl e PLTG Ta l a ng Duku Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. PLN Pus ha rl i s UPW III Ba ndung
III/2019
Cover Fl a nge Y-Stra i ner Sea l Wa ter Sepa ra tor 4” 150 SS PT. GEO DIPA ENERGI UNIT
71 Rota ti ng/ Mecha ni ca l Pa tuha - Ja wa ba ra t Pa tuha - Ja wa ba ra t 001.PO/PTH1/I/2019
316L PATUHA
PT WINNMETALL / ENI-
73 Engi neeri ng procurement Engi neeri ng Ja ka rta offi ce Ja ka rta WM/ENI/1811/SO/085
INDONESIA
75 Repa i r La byri nth Sea l s Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. TJOKRO BERSAUDARA Ja ka rta 063/PIMSF/FME-PO/XI/2018
78 Repa i r Va cuum Pump PLTU Ba rru Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. MULYA JAYA MALISE Ma ka s a r PO-001/MJM/MKS/2018
79 Repa i r Gea r Box Luvki n Rota ti ng/ Mecha ni ca l NGLTech-works hop CV. MEDIA USAHA TEKNIKA Sura ba ya 22/MUT/PO/X/2018
PT JURONG ENGINEERING
80 Thrus t Shi m TB da n Thrus t Shi m Gen Rota ti ng/ Mecha ni ca l NGLTech-works hop Ja ka rta 6536011164
LESTARI (PT JEL)
81 El ecti c Pump Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. LAYANMAS Ja ka rta PO 180802
NGLTech-works hop
82 Fi t Exi s ti ng Ba l l Va l ve to Repl a cement Actua tor 3 Set Mecha ni ca l / i ns trument Ta l a ga boda s Ja wa PT. LAYANMAS Ja ka rta PO 180801
Ba ra t
83 Reba bbi t Bea ri ng 5 Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. TAKAYA GROUP Ja ka rta 15/TG-BNA/VIII/2018
84 1s t Sta ge Bucket da n 1s t Sta geNozzl e Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. TJOKRO BERSAUDARA Ja ka rta 051/PIMSF/FME-PO/IX/2018
85 Hous i ng Bea ri ng/Gui de Bea ri ng Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. TJOKRO BERSAUDARA Ja ka rta 052/PIMSF/FME-PO/IX/2018
86 Provi s i on As s y Di s a s s y Mecha ni ca l Sea l Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. SABA PRATAMA Ja ka rta 007/SPJ-ADM/06/2018
87 Provi s i on Mecha ni ca l Sea l a nd As s embl y 1 Set(Sma l l ) Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. SABA PRATAMA Ja ka rta 006/SPJ-ADM/06/2018
88 Provi s i on Mecha ni ca l Sea l a nd As s embl y 1 Set (La rge) Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. SABA PRATAMA Ja ka rta 005/SPJ-ADM/06/2018
PT. PLN
0118.SPK/DAN.02.01/PPBJ.UW
89 Provi s i on Reba bbi t 1 Sta nd 38 pcs Thrus t Pa d PLTM Rota ti ng/ Mecha ni ca l NGLTech-works hop (PERSERO)PUSHARLIS UWP Ba ndung
PIV/2018
IV
90 Reba bbi t Bea ri ng 5 Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. TAKAYA GROUP Ja ka rta 09/TG-BNA/V/2018
91 Goul ds Pump Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. SABA PRATAMA Ja ka rta 003/SPJ-ADM/05/2018
PT. TAKA
Repa i r Wel di ng a nd Recontouri ng Bl a de di a phra gm
92 Rota ti ng/ Mecha ni ca l NGLTech-works hop TURBOMACHINERY Ba ndung 229/SO/0418
Sta ge 3
INDONESIA
93 Fi t Exi s ti ng Ba l l Va l ve to Repl a cement Actua tor 2 Set Ins trument/ Mecha ni ca l NGLTech-works hop PT. SABA PRATAMA Ja ka rta 004/SPJ-ADM/04/2018
PT. PLN
producti on ma chi ne repa i r s ervi ces for devel opment 0052/DAN.02.07/PPBJ.UWPIV/
94 Rota ti ng/ Mecha ni ca l NGLTech-works hop (PERSERO)PUSHARLIS UWP Ba ndung
ofPLTMH 2018
IV
PT. TAKA
Wel di ng,Smoothi ng repa i r s ervi ces a nd Recontouri ng (6
95 Rota ti ng/ Mecha ni ca l NGLTech-works hop TURBOMACHINERY Ba ndung 177/SO/0318
Segment )
INDONESIA
97 Repa i r Cover Oi l Puri fi re Rota ti ng/ Mecha ni ca l NGLTech-works hop PT. SABA PRATAMA Ba ndung 007/SPJ-ADM/03/2018
PT. TAKA
99 Repa i r Di a phra gm PLTU Gres i k Rota ti ng/ Mecha ni ca l NGLTech-works hop TURBOMACHINERY Ba ndung 152/SO/0318
INDONESIA
100 Ins ta l l a ti on Bl a de to Rotor Turbi ne Rota ti ng/ Mecha ni ca l NGLTech-works hop CV. MEDIA USAHA TEKNIKA Sura ba ya 20/PO/MUT/III/2018
105 Repa i r Sea l Ri ng Interna l - Ta nga ri II 2 Ea Rotating/ Mecha ni ca l NGLTech-works hop PT. TJOKRO BERSAUDARA Ja ka rta 051/PIMSF/FME-PO/XII/2017
106 Repa i r Sea l Ri ng La rge - Ta nga ri II 1 Ea Rotating/ Mecha ni ca l NGLTech-works hop PT. TJOKRO BERSAUDARA Ja ka rta 050/PIMSF/FME-PO/XII/2017
107 Repa i r Sha ft Gui de Va ne Ta nga ri II 16 ea Rotating/ Mecha ni ca l NGLTech-works hop PT. TJOKRO BERSAUDARA Ja ka rta 049/PIMSF/FME-PO/XII/2017
108 Repa i r Sha ft Gui de Va ne Ta nga ri II 20 ea Rotating/ Mecha ni ca l NGLTech-works hop PT. TJOKRO BERSAUDARA Ja ka rta 048/PIMSF/FME-PO/XII/2017
110 Repa i r bea ri ng hous i ng P.2139 Rotating/ Mecha ni ca l NGLTech-works hop PT. SULZER INDONESIA Purwa ka rta PO-0030159
111 Repa i r Ma i n Bea ri ng PLTA Rotating/ Mecha ni ca l NGLTech-works hop PT. TJOKRO BERSAUDARA Ja ka rta 034/PIMSF/FME-PO/IX/2017
112 Repa i r La byri nth Sea l Rotating/ Mecha ni ca l NGLTech-works hop PT. TJOKRO BERSAUDARA Ja ka rta 035/PIMSF/FME-PO/IX/2017
113 Pa d Bea ri ng 2 mount pi n des i gn 4 ea Rotating/ Mecha ni ca l NGLTech-works hop PT. TJOKRO BERSAUDARA Ja ka rta 036/PIMSF/FME-PO/IX/2017
114 Repa i r Turbi ne PKS 1 da n PKS 2 Rotating/ Mecha ni ca l NGLTech-works hop CV. HAKA TEKNIK Ba ndung 061/HK-PO/V/2017
THANK YOU