Gasifier: Shell
Air Separation Unit: Air Products
Gas Cleaning: Schumacher Candle;
Sulfinol Desulfurization, Claus
Combined Cycle: Siemens Single Shaft Configuration
Gas Turbine: Siemens V94.2
Steam Turbine: Siemens KN
Generator: Siemens (THLR, Hydrogen Cooled)
I&C for IGCC: Hartmann & Braun
IGCC Configuration: Fully Integrated
Parameters Dimension
Design coal - Drayton coal (Australia) 1)
Cold gas efficiency % approx. 80
Composition upstream GT (wet syngas)
H2 %vol. 12.3
CO %vol. 24.8
CO2 %vol. 0.8
N2 %vol. 42.0
CH4 %vol. -
Ar %vol. 0.6
H2O %vol. 19.1
O2 %vol. 0.4
H2/CO ratio - 0.50
Lower heating BTU/scf 113
value (LHV) kJ/kg 4324
Ambient pressure bara/psia 1.013/14.69
Ambient temperature °C/°F 15/59
Elevation above sea level m/ft 0
Condenser pressure bara/psia 0.025/0.36
GT output MW 156
ST output MW 128
Gross Power Output MW 284
Auxilliary power MW 31
Net power output MW 253
Net efficiency (LHV) % 43.2
28.10.2002 GTC 2002 PG CTET-HAN
Process Flow Diagram of Buggenum IGCC Plant
Coal
IP Steam
HP Steam
Coal
Milling
and
Drying A
Desulfurization
Sour Gas G
Gasifier Saturator
Syngas
Claus Plant
Cooler
To Coal
A
Gasification
Slag
Tail Gas
Treatment
Make-up Water
Fly Ash
Recycling
O2
Make-up
DGAN Heat Recovery Water
N2 Steam
Air Generator
Separation
Cooling Water
A
Gas Turbine
Fuel oil
(diffusion)
Natural gas Natural gas
(diffusion) + steam
(diffusion)
Syngas
Air
Fuel oil
(premix)
Natural gas
(premix)
Air Air
Saturator and
Heat Exchanger
8000
forecast
6000
Coal gas operating hours
hour s
4000
Natural and Coal gas oper.
Accumulated Syngas hours hours (accumulated)
in total: 33700
2000
0
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003
Gas Turbine:
• Modified gas turbine burners (swirl Perturbators added)
ASU:
• Better structure and better material of mol sieves (CO2 breakthrough at
elevated temperatures)
Control Features
30 MW increase
Load Dispatcher
Select Secondary Plant Setpoint
PC
Natural Gas
PC
TC LC
LC
Primary Plant
Setpoint IP Steam
Waste Nitrogen PC
Oxygen PC
Extracted Air
FC
PC FC
ASU
Advantages:
Single Digit NOx Values (< 9ppm) Meets Future Emission Levels
90 275
250
80
225
NOx [ppm] dry 15% O2
40 125
NOx [ppm] Pow er Output[Mw e]
100
30
75
20
50
10 25
0 0
28.09 29.09 30.09 1.10 2.10 3.10 4.10 5.10 6.10 7.10 8.10
1998
50 300
45 275
NOx [ppm] Pow er Output[Mw e]
250
40
225
NOx [ppm] dry 15% O2
35
25 150
20 125
100
15
75
10
50
5 25
0 0
10.08 11.08 12.08 13.08 14.08 15.08 16.08 17.08 18.08 19.08 20.08
2002
28.10.2002 GTC 2002 PG CTET-HAN
Syngas Experience with Siemens and Siemens
Westinghouse Technology
Syngas Dilution • Redundant dilution systems • Providing of IP steam system beyond DGAN
system/ heating value control
• Capability for diluent replacement • Location of syngas/nitrogen mixing upstream
saturator
GT Syngas Fuel • Optimal heat recovery in distinct load cases • Optimised modular design for simple and
System reliable operation
Flushing system • Corrosion of piping/ high temperature • Nitrogen flushing where IP nitrogen is
gradients available
GT Controller • GT compressor exit pressure control • Compressor exit pressure control features
• Syngas pressure Control proven
• Switch over capability at distinct load cases • Additional GT control features depends on
selected overall plant concept
Unit Control/ • Manual operation necessary • higher automated level based on Buggenum
Plant Integration and Puertollano experience
• Limited load gradients/ operational Flexibility • Air-side partially integrated, Natural gas or
improvable Fuel Oil Admixing
N2 from ASU
Nitrogen
Flushing
Vessel
Flare Flare IP Steam
IP Steam for
Hu Control
Nitrogen
Flushing
Natural
Natural Gas
Gas
Block and Bleed
HRSG
LP Steam
from
W/S System
G
Syngas Vent
Kettle Boiler V94.2
Gas Turbine
to Air Cooler from Saturator Inlet
Vent
Guide
Vane
Buggenum
Feasibility Study to separate
Peak Shaving Operation Combined Cycle from Gasifier
Gasifier and ASU not 100% and ASU Operation
Production of Alternative Fuels
Results:
Buggenum
l Mature Operational Status is reached and the plant operates compatible
Future Concepts
l Implementation of Lessons learned into future Design Features
l Joint effort from the beginning between client and main suppliers