Professional Documents
Culture Documents
Reference FPI-2021-011152-VETM-TEC-DC-R4
Project EXPANSION OF STP IN SAKAKA AL GROUP 26,000 M3/DAY
Prepared By Ch Venkatesh
Contractor ALKAWTHER INDUSTRIES CO. LTD Approved By Anees Aboobacker
End User NWC Date March 20, 2023
Design Temperature
Nominal Diameter
Required Collapse
Internal Diameter
Design Pressure
Required Pipe
Design Life
Service, Piping Class
Pressure
Stiffness
Installation Type
Structure Resin
Structure Glass
Medium Type
Product Type
Service Type
Liner Resin
Liner Glass
Ldes Pdes Tdes DN ID STIS PB
Years bar °C mm inch mm Pa bar
Input Input Input Input Input Input Input Input
Sewerage Static Standard Liquid AG/UG GRP Helical Lamination VE C-Veil + CSM ECR-Glass PE ECR-Glass 50 10.0 50 65 2 1/2 65 10,000 -
Sewerage Static Standard Liquid AG/UG GRP Helical Lamination VE C-Veil + CSM ECR-Glass PE ECR-Glass 50 10.0 50 80 3 80 10,000 -
Sewerage Static Standard Liquid AG/UG GRP Helical Lamination VE C-Veil + CSM ECR-Glass PE ECR-Glass 50 10.0 50 100 4 100 10,000 -
Sewerage Static Standard Liquid AG/UG GRP Helical Lamination VE C-Veil + CSM ECR-Glass PE ECR-Glass 50 10.0 50 150 6 150 10,000 -
Sewerage Static Standard Liquid AG/UG GRP Helical Lamination VE C-Veil + CSM ECR-Glass PE ECR-Glass 50 10.0 50 200 8 200 10,000 -
Sewerage Static Standard Liquid AG/UG GRP Continuous Lamination VE C-Veil + CSM ECR-Glass PE ECR-Glass 50 10.0 50 300 12 300 10,000 -
Sewerage Static Standard Liquid AG/UG GRP Continuous Lamination VE C-Veil + CSM ECR-Glass PE ECR-Glass 50 10.0 50 400 16 400 10,000 -
Sewerage Static Standard Liquid AG/UG GRP Continuous Lamination VE C-Veil + CSM ECR-Glass PE ECR-Glass 50 10.0 50 500 20 500 10,000 -
Sewerage Static Standard Liquid AG/UG GRP Continuous Lamination VE C-Veil + CSM ECR-Glass PE ECR-Glass 50 10.0 50 600 24 600 10,000 -
Sewerage Static Standard Liquid AG/UG GRP Continuous Lamination VE C-Veil + CSM ECR-Glass PE ECR-Glass 50 10.0 50 700 28 700 10,000 -
Sewerage Static Standard Liquid AG/UG GRP Continuous Lamination VE C-Veil + CSM ECR-Glass PE ECR-Glass 50 10.0 50 800 32 800 10,000 -
Sewerage Static Standard Liquid AG/UG GRP Continuous Lamination VE C-Veil + CSM ECR-Glass PE ECR-Glass 50 10.0 50 900 36 900 10,000 -
Sewerage Static Standard Liquid AG/UG GRP Continuous Lamination VE C-Veil + CSM ECR-Glass PE ECR-Glass 50 10.0 50 1000 40 1,000 10,000 -
1 of 4
Wall Thickness Calculations: Output
Reference FPI-2021-011152-VETM-TEC-DC-R4
Project EXPANSION OF STP IN SAKAKA AL GROUP 26,000 M3/DAY
Prepared By Ch Venkatesh
Contractor ALKAWTHER INDUSTRIES CO. LTD Approved By Anees Aboobacker
End User NWC Date March 20, 2023
Thickness (Occasional
Thickness (Hydrotest at
Thickness (Sustained
Pressure at Ambient
Thickness (Stiffness)
Offered Reinforcedl
Thickness (Collapse
HDB at Ldes and Tdes
(Include FR Layer if
Maximum Allowed
(Including Topcoat
Topcoat Thickness
Nominal Diameter
Collapse Pressure
MPRTdes Based on
20 Year Qualified
Field Hydro-Test
Occasional Load
Min. Reinforced
Min. Reinforced
Min. Reinforced
Min. Reinforced
Min. Reinforced
Min. Reinforced
Occasional Part
Modulus at Tdes
Total Thickness
Hydrotest Case
Sustained Load
Wall Thickness
Partial Factors
Hoop Bending
Internal Liner
Safety Factor
Hoop Tensile
Stress at Tdes
Applicable)
at Ambient
Thickness
Thickness
Pressure)
Modulus
Gradient
and Tdes
and FR)
Ambient)
Factors
at Tdes)
at Tdes)
at Tdes
DN SFB Focc Pocc Fhyd Phyd,fd f2,sus f3,sus f2,occ f3,occ A0 A2 A3 LTHS σh,LT,Tdes σh,LT,20,Tdes
σh,thr,2:1 G Eh Ehb MPRTdes tr,sus tr,occ tr,hyd,fd tr,STIS tr,b tr,min tr tl ts t
mm inch - - bar - bar - - - - - - - MPa MPa MPa MPa - MPa MPa MPa mm mm mm mm mm mm mm mm mm mm
Input Input Input Input Input Input Input Input Input Input Input Input Input Input Test Test Test Test Test Test Test EQ.1 EQ.2 EQ.3 EQ.4 EQ.5 EQ.6 Input EQ.7 Input Input EQ.8
65 2 1/2 1.5 1.40 14.0 1.50 15.0 0.67 0.75 0.89 1.00 0.94 1.00 1.00 105.4 93.8 100.0 100.0 0.070 18,963 20,500 1.43 0.7 0.6 0.6 1.2 - 1.8 1.8 1.0 0.3 3.1
80 3 1.5 1.40 14.0 1.50 15.0 0.67 0.75 0.89 1.00 0.94 1.00 1.00 105.4 93.8 100.0 100.0 0.070 18,963 20,500 1.43 0.9 0.7 0.7 1.5 - 2.4 2.4 1.0 0.3 3.7
100 4 1.5 1.40 14.0 1.50 15.0 0.67 0.75 0.89 1.00 0.94 1.00 1.00 105.4 93.8 100.0 100.0 0.070 18,963 20,500 1.43 1.1 0.9 0.9 1.9 - 2.4 2.4 1.0 0.3 3.7
150 6 1.5 1.40 14.0 1.50 15.0 0.67 0.75 0.89 1.00 0.94 1.00 1.00 105.4 93.8 100.0 100.0 0.070 18,963 20,500 1.43 1.6 1.3 1.3 2.8 - 2.8 2.8 1.0 0.3 4.1
200 8 1.5 1.40 14.0 1.50 15.0 0.67 0.75 0.89 1.00 0.94 1.00 1.00 105.4 93.8 100.0 100.0 0.070 18,963 20,500 1.43 2.2 1.7 1.7 3.7 - 3.7 3.8 1.0 0.3 5.1
300 12 1.5 1.40 14.0 1.50 15.0 0.67 0.75 0.89 1.00 0.94 1.00 1.00 131.7 117.2 125.0 125.0 0.070 18,500 23,000 1.43 2.6 2.0 2.0 5.3 - 5.3 5.5 1.0 0.3 6.8
400 16 1.5 1.40 14.0 1.50 15.0 0.67 0.75 0.89 1.00 0.94 1.00 1.00 131.7 117.2 125.0 125.0 0.070 18,500 23,000 1.43 3.5 2.7 2.7 7.1 - 7.1 7.3 1.0 0.3 8.6
500 20 1.5 1.40 14.0 1.50 15.0 0.67 0.75 0.89 1.00 0.94 1.00 1.00 131.7 117.2 125.0 125.0 0.070 18,500 23,000 1.43 4.3 3.4 3.4 8.9 - 8.9 9.0 1.0 0.3 10.3
600 24 1.5 1.40 14.0 1.50 15.0 0.67 0.75 0.89 1.00 0.94 1.00 1.00 131.7 117.2 125.0 125.0 0.070 18,500 23,000 1.43 5.2 4.1 4.1 10.6 - 10.6 10.8 1.0 0.3 12.1
700 28 1.5 1.40 14.0 1.50 15.0 0.67 0.75 0.89 1.00 0.94 1.00 1.00 131.7 117.2 125.0 125.0 0.070 18,500 23,000 1.43 6.0 4.7 4.8 12.4 - 12.4 12.6 1.0 0.3 13.9
800 32 1.5 1.40 14.0 1.50 15.0 0.67 0.75 0.89 1.00 0.94 1.00 1.00 131.7 117.2 125.0 125.0 0.070 18,500 23,000 1.43 6.9 5.4 5.4 14.2 - 14.2 14.4 1.0 0.3 15.7
900 36 1.5 1.40 14.0 1.50 15.0 0.67 0.75 0.89 1.00 0.94 1.00 1.00 131.7 117.2 125.0 125.0 0.070 18,500 23,000 1.43 7.8 6.1 6.1 15.9 - 15.9 16.2 1.0 0.3 17.5
1,000 40 1.5 1.40 14.0 1.50 15.0 0.67 0.75 0.89 1.00 0.94 1.00 1.00 131.7 117.2 125.0 125.0 0.070 18,500 23,000 1.43 8.6 6.8 6.8 17.7 - 17.7 18.0 1.0 0.3 19.3
2 of 4
Wall Thickness Calculations: Details
Reference FPI-2021-011152-VETM-TEC-DC-R4
Project EXPANSION OF STP IN SAKAKA AL GROUP 26,000 M3/DAY
Prepared By Ch Venkatesh
Contractor ALKAWTHER INDUSTRIES CO. LTD Approved By Anees Aboobacker
End User NWC Date March 20, 2023
3 of 4
Wall Thickness Calculations: Details
Reference FPI-2021-011152-VETM-TEC-DC-R4
Project EXPANSION OF STP IN SAKAKA AL GROUP 26,000 M3/DAY
Prepared By Ch Venkatesh
Contractor ALKAWTHER INDUSTRIES CO. LTD Approved By Anees Aboobacker
End User NWC Date March 20, 2023
EQ.1
FPI
EQ.8 𝑡 = 𝑡𝑟 + 𝑡𝑙 + 𝑡𝑠
4 of 4