You are on page 1of 3

DETAIL FOUNDATION

as plan draing
outside plan
ier to te oe
PROJECT NAME : xxxxx

AS PLAN NUMBER : xxxxx

DATE : xxxxx

PT INDONESIA COMNETS PLUS

LEGEND UANTITY
3000 HUB OLT :
FIXING SLACK PLAN :
JOIN CLOSURE PLAN :
FDT ODC/FDT/FIBER DISTRIBUTION PLAN :

350 650 205 700 205 540 350 FAT

HH
ODP/FAT/FIBER ACCES TERMINAL PLAN
EXISTING MKM HANDHOLE
:
:
HH.150
PLAN HANDHOLE 150X150X150 CM :
HH.120
PLAN HANDHOLE 120X120X120 CM :
HH.100
PLAN HANDHOLE 100X100X100 CM :
HH.80
PLAN HANDHOLE 80X80X80 CM :
PLAN HANDHOLE PIT 60X60X60 CM :

200
PIT.60

PIT.40
PLAN HANDHOLE PIT 40X40X40 CM :
CR
CABLE RISER :

OLT CABINET BA
RILLING ASHPALT (BORING ASPAL) :

A
GA
EXCAVATION ASHPALT (GALI ASPAL) :
GT
EXCAVATION LAND (GALI TANAH) :

300
FDT
:

BOX KWH
GR
EXCAVATION GRASS (GALI RUMPUT)
S PLAN POLE 9 METER :
480

S PLAN POLE 7 METER :


G PLAN GALVANIZED PIPE 6 METER :
S EXISTING MKM POLE :
S ANOTHER POLE :
L-KONEKTOR :
T-KONEKTOR :
540 DUCT FO :
DUCT DW :

1500
DROP WIRE :
FIBER 6/2T :
:
650 FIBER 12/2T
FIBER 24/4T :
FIBER 48/4T :

HAND HOLE FIBER 72/6T


FIBER 96/8T
FIBER 144/12T
:
:
:
FIBER 264/22T :

HOMEPASS :

HUB AREA :

NODE AREA :

MAP ID AREA :

B DATE MAP ID

CITY AREA
:

MENYETUJUI

TOP VIEW design planning ca

ikr

MENGETAHUI

project control roll out

DRAWING NAME
NTS

CABINET FOUNDATION PAGE

1 OF 1

PT. INDONESIA COMNETS PLUS


REVISION INITIALS DATE

CHECKED BY
FTTx/PLANNER REG

DRAWN BY RIFAN NAUFAL ILHAM


RIFAN NAUFAL ILHAM
DESIGNER PT.YOFC INTERNATIONAL INDONESIA
as plan draing
outside plan
ier to te oe
PROJECT NAME : xxxxx

AS PLAN NUMBER : xxxxx

DATE : xxxxx

PT INDONESIA COMNETS PLUS

650 540
N

LEGEND UANTITY
HUB OLT :
FIXING SLACK PLAN :
JOIN CLOSURE PLAN :
FDT ODC/FDT/FIBER DISTRIBUTION PLAN :
FAT ODP/FAT/FIBER ACCES TERMINAL PLAN :
HH EXISTING MKM HANDHOLE :
HH.150
PLAN HANDHOLE 150X150X150 CM :
PLAN HANDHOLE 120X120X120 CM :
3000 HH.120

HH.100
PLAN HANDHOLE 100X100X100 CM :
:
350 650 205 700 205 540 350 HH.80

PIT.60
PLAN HANDHOLE 80X80X80 CM
PLAN HANDHOLE PIT 60X60X60 CM :

450 425 500 425 340 PIT.40


PLAN HANDHOLE PIT 40X40X40 CM :
:
CR
CABLE RISER
BA
RILLING ASHPALT (BORING ASPAL) :
GA
EXCAVATION ASHPALT (GALI ASPAL) :
GT
EXCAVATION LAND (GALI TANAH) :
GR
EXCAVATION GRASS (GALI RUMPUT) :
100 S PLAN POLE 9 METER :
S PLAN POLE 7 METER :
G PLAN GALVANIZED PIPE 6 METER :
500

S EXISTING MKM POLE :


S ANOTHER POLE :
L-KONEKTOR :
T-KONEKTOR :
DUCT FO :
DUCT DW :
DROP WIRE :
100

ELV. 0,00 MAGL FIBER 6/2T :


FIBER 12/2T :
FIBER 24/4T :
FIBER 48/4T :
FIBER 72/6T :
50

500

FIBER 96/8T :

600
FIBER 144/12T :
FIBER 264/22T :

HOMEPASS :

HUB AREA :

NODE AREA :

MAP ID AREA :

DATE MAP ID :

CITY AREA :

MENYETUJUI

SECTION A-A
design planning ca

DETAIL FOUNDATION
ikr

MENGETAHUI

project control roll out

DRAWING NAME
NTS

CABINET FOUNDATION PAGE

1 OF 1

PT. INDONESIA COMNETS PLUS


REVISION INITIALS DATE

CHECKED BY
FTTx/PLANNER REG

DRAWN BY RIFAN NAUFAL ILHAM

3000 RIFAN NAUFAL ILHAM


DESIGNER PT.YOFC INTERNATIONAL INDONESIA
as plan draing
outside plan
ier to te oe
PROJECT NAME : xxxxx

AS PLAN NUMBER : xxxxx

DATE : xxxxx

PT INDONESIA COMNETS PLUS


ELV. 3,00 MAGL
S

LEGEND UANTITY
HUB OLT :
FIXING SLACK PLAN :

POLE 9M
JOIN CLOSURE PLAN :
FDT ODC/FDT/FIBER DISTRIBUTION PLAN :
FAT ODP/FAT/FIBER ACCES TERMINAL PLAN :
HH EXISTING MKM HANDHOLE :
HH.150
PLAN HANDHOLE 150X150X150 CM :
650 HH.120
PLAN HANDHOLE 120X120X120 CM :
ELV. 2,15 MAGL HH.100
PLAN HANDHOLE 100X100X100 CM :
HH.80
PLAN HANDHOLE 80X80X80 CM :
PIT.60
PLAN HANDHOLE PIT 60X60X60 CM :
PIT.40
PLAN HANDHOLE PIT 40X40X40 CM :
CR
CABLE RISER :
BA
RILLING ASHPALT (BORING ASPAL) :
540 GA
EXCAVATION ASHPALT (GALI ASPAL) :
GT
EXCAVATION LAND (GALI TANAH) :
GR
EXCAVATION GRASS (GALI RUMPUT) :
S PLAN POLE 9 METER :
S PLAN POLE 7 METER :
G PLAN GALVANIZED PIPE 6 METER :

3000
BOX KWH S

S
EXISTING MKM POLE
ANOTHER POLE
:
:
L-KONEKTOR :

PIPA GALVANIZ 3 INCH, L=3.5 M


1500

T-KONEKTOR :
DUCT FO :
DUCT DW :
DROP WIRE :
FIBER 6/2T :
2000

OLT FIBER 12/2T :


:
2150

FIBER 24/4T

1030

2000
FIBER 48/4T :
FDT FIBER 72/6T :
FIBER 96/8T :
FIBER 144/12T :
FIBER 264/22T :

HOMEPASS :

HUB AREA :

NODE AREA :

MAP ID AREA :

DATE MAP ID :
500

500
CITY AREA :

MENYETUJUI
HAND HOLE
ELV. 0,10 MAGL
100

ELV. 0,00 MAGL


100

design planning ca

PAD FOUNDASTION
ikr

MENGETAHUI

FRONT VIEW project control

DRAWING NAME
roll out

NTS

CABINET FOUNDATION PAGE

1 OF 1

PT. INDONESIA COMNETS PLUS


REVISION INITIALS DATE

CHECKED BY
FTTx/PLANNER REG

DRAWN BY RIFAN NAUFAL ILHAM


RIFAN NAUFAL ILHAM
DESIGNER PT.YOFC INTERNATIONAL INDONESIA

You might also like