QF-751-13/04

Request For Approval

………..……………………………………………… : Project Name …/.…/.… : Date


………..……………………………………………… : Project ID ..…/.…/.… : Start Date
……………………………………………………… : Owner ..…/.…/.… : Finish Date
..……………….…………………………………… : Contractor

RFA For :
Discipline : Civil Arch. Electrical Mech. Piping Other: ……………………..
Acceptance Criteria:
Drawings – Specifications – BOQ - Technical catalogues/ data sheets - Shop drawings - Test& inspection
procedures – Other ( Approved and submitted to the Contractor )

1-Required work :
………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………..

Submitted by Contractor :
Name: ………………….. Signature: …………………….. Date: … /…./…. Time: … : …..
Received by Engineer :
Name: ………………. Signature: ……………….. Date: …./…./…. Time…:…..

2- Decision :
Approved Approved as Noted Rejected Resubmit

By Engineer : Date :…/…./…. Time : … : ….


Position: ………………………… Name :………………….. Signature :……………………..
** Notes :
…………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………

**Notes verified by : Date :…/…./…. Time : … : ….


Position: ………………………… Name :………………….. Signature:……………
4- RE Comments& Approval
…………………………………………………………………………………..……………………….
Name :………………….. Signature:…………… Date :…/…./….
5- Received by Contractor : Date :…/…./…. Time : … :
….
Position: ………………………… Name :………………….. Signature :……………………..
* HVAC : Heat, Ventilation, Air condition

…… Ver.(3/1) – 1/4/2008 ….. of