Professional Documents
Culture Documents
RFA For :
Discipline : Civil Arch. Electrical Mech. Piping Other: ……………………..
Acceptance Criteria:
Drawings – Specifications – BOQ - Technical catalogues/ data sheets - Shop drawings - Test& inspection
procedures – Other ( Approved and submitted to the Contractor )
1-Required work :
………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………..
Submitted by Contractor :
Name: ………………….. Signature: …………………….. Date: … /…./…. Time: … : …..
Received by Engineer :
Name: ………………. Signature: ……………….. Date: …./…./…. Time…:…..
2- Decision :
Approved Approved as Noted Rejected Resubmit