You are on page 1of 54

Column Reinforcement Design Calc. By: Eng.

Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Column Reinforcement Design


6C1 (B-1) (230/230)
Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 123.8 1.6 10.4 129.4 -1.4 -10.4
2 98.2 -0.3 7.7 103.8 -0.5 -7.5
3 74.4 1.7 6.2 80.0 -1.9 -6.2
4 103.2 1.3 7.6 108.0 -1.1 -7.7
5 104.1 1.3 9.8 108.9 -1.2 -9.7
6 103.6 -0.3 8.7 108.4 0.4 -8.7
7 103.7 3.0 8.7 108.5 -2.8 -8.7

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
1 1
2 2
N - kN
9. 9.
4 4
M
1. 1. 0.
2 kN.m
6 5 0
2

ProtaStructure v6.0.392 Page 1


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

M 1 1
1.
3 0. 1. kN.m
5
3 4 8
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.098

Beta =0.88

Shear Rebars
Vd(1/2) = 6.2 / 0.1 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.88 / 0.78 N/mm2 Le1/b1 = 8.5 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.12 / 0.00 N/mm2 Le2/b2 = 8.4 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

6C2 (B-2) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 139.5 2.6 -1.2 145.1 -3.4 0.7
2 111.5 0.6 -1.3 117.1 -2.2 1.0
3 86.7 2.6 -0.1 92.3 -3.6 -0.3
4 117.2 2.2 -2.3 122.0 -2.8 1.9
5 117.3 2.2 0.4 122.1 -2.8 -0.7
6 117.3 0.6 -1.0 122.1 -1.3 0.6
7 117.3 3.8 -1.0 122.1 -4.4 0.6

Interaction Diagram

ProtaStructure v6.0.392 Page 2


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
1 1
4 4
N - kN
5. 5.
1 1
M - - -
2 3. 1. 4. kN.m
2 4 7 8
M - -
0.
3 1. 1. kN.m
0
3 2 7
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.110

Beta =0.87

Shear Rebars
Vd(1/2) = 0.0 / 2.0 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.78 / 0.85 N/mm2 Le1/b1 = 8.4 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.00 / 0.04 N/mm2 Le2/b2 = 8.4 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

6C3 (B-3) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

ProtaStructure v6.0.392 Page 3


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 99.6 3.2 -4.2 105.2 -5.6 4.7
2 77.2 1.0 -2.7 82.8 -3.4 3.0
3 65.3 3.2 -2.9 70.9 -4.7 3.3
4 83.9 2.8 -4.9 88.7 -4.8 5.3
5 84.4 2.7 -2.2 89.2 -4.7 2.6
6 84.2 1.2 -3.5 89.0 -3.3 3.9
7 84.1 4.2 -3.5 88.9 -6.2 3.9

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
1 1
0 0
N - kN
5. 5.
2 2
M - - -
2 5. 1. 9. kN.m
2 6 2 9
M
4. 1. 0.
3 kN.m
7 2 0
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

ProtaStructure v6.0.392 Page 4


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

N/bhFcu =0.080

Beta =0.90

Shear Rebars
Vd(1/2) = 3.2 / 2.5 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.86 / 0.82 N/mm2 Le1/b1 = 8.3 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.06 / 0.05 N/mm2 Le2/b2 = 8.4 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

6C4 (B-4) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 91.8 2.2 -5.6 97.4 -3.6 5.2
2 71.1 0.2 -3.9 76.7 -1.7 3.7
3 60.8 2.4 -3.6 66.4 -3.0 3.4
4 77.8 1.9 -5.8 82.6 -3.0 5.5
5 76.4 1.9 -3.5 81.2 -3.0 3.3
6 77.1 0.4 -4.7 81.9 -1.6 4.4
7 77.2 3.3 -4.7 82.0 -4.4 4.4

Interaction Diagram

Critical Loading: 1 - (G+Q)


Mi D
n es
ig

ProtaStructure v6.0.392 Page 5


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

n
9 9
N 7. - 7. kN
4 4
M - -
0.
2 3. 1. kN.m
0
2 6 1
M - - -
3 5. 1. 8. kN.m
3 6 1 9
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.074

Beta =0.91

Shear Rebars
Vd(1/2) = 3.6 / 2.5 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.85 / 0.84 N/mm2 Le1/b1 = 8.4 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.07 / 0.05 N/mm2 Le2/b2 = 8.4 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

6C5 (A-4) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 36.0 7.2 -4.2 41.6 -6.0 3.6
2 32.6 6.2 -3.2 38.2 -4.6 2.7
3 21.0 4.5 -2.7 26.6 -4.1 2.4
4 30.6 6.1 -4.5 35.4 -5.1 3.9
5 29.8 6.1 -2.5 34.6 -5.2 2.2
6 29.8 5.0 -3.5 34.6 -4.3 3.0
7 30.6 7.2 -3.6 35.4 -6.0 3.1

Interaction Diagram

ProtaStructure v6.0.392 Page 6


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
4 4
N 1. - 1. kN
6 6
M 1
7. 0.
2 1. kN.m
2 5
2 2
M - -
0.
3 4. 0. kN.m
0
3 2 5
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.031

Beta =0.96

Shear Rebars
Vd(1/2) = 2.7 / 4.2 kN Short Column... As (Req): %0.44 230.28 mm2
vc'(1/2) = 0.78 / 0.78 N/mm2 Le1/b1 = 8.3 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.05 / 0.08 N/mm2 Le2/b2 = 8.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

1C6 (A-3) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

ProtaStructure v6.0.392 Page 7


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 397.0 21.1 -0.6 398.1 -7.5 0.0
2 283.8 14.7 0.9 284.9 -5.3 -0.6
3 255.0 10.0 -2.0 256.1 -3.5 0.6
4 326.3 17.7 -0.5 327.2 -6.3 0.1
5 339.9 17.8 -0.5 340.8 -6.4 -0.2
6 330.8 18.7 -0.5 331.8 -6.6 0.0
7 335.3 16.8 -0.4 336.3 -6.1 -0.1

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
3 3
9 9
N - kN
8. 8.
1 1
M 2 2
4.
2 1. 4. kN.m
6
2 1 1
M - -
0.
3 0. 4. kN.m
0
3 6 6
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

ProtaStructure v6.0.392 Page 8


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

N/bhFcu =0.301

Beta =0.65

Shear Rebars
Vd(1/2) = 0.4 / 33.3 kN Short Column... As (Req): %0.80 424.91 mm2
vc'(1/2) = 1.45 / 2.12 N/mm2 Le1/b1 = 0.5 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.01 / 0.66 N/mm2 Le2/b2 = 0.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

3C6 (A-3) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 267.8 7.7 -4.2 319.2 -8.3 -1.4
2 195.4 6.5 -2.9 237.3 -6.2 -1.5
3 175.3 4.6 -4.1 203.9 -4.3 0.0
4 219.1 6.3 -2.3 261.8 -7.1 0.0
5 231.4 6.6 -5.2 274.0 -6.8 -2.4
6 223.3 9.3 -3.8 266.0 -4.6 -1.3
7 227.1 3.7 -3.6 269.8 -9.3 -1.1

Interaction Diagram

Critical Loading: 1 - (G+Q)


Mi D
n es
ig

ProtaStructure v6.0.392 Page 9


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

n
3 3
1 1
N - kN
9. 9.
2 2
-
M - -
1
2 8. 3. kN.m
1.
2 3 7
4
M - -
0.
3 4. 3. kN.m
0
3 2 7
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.241

Beta =0.72

Shear Rebars
Vd(1/2) = 1.1 / 1.5 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.97 / 0.94 N/mm2 Le1/b1 = 9.0 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.02 / 0.03 N/mm2 Le2/b2 = 10.2 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

5C6 (B-1) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 314.0 0.3 8.4 319.6 0.0 -5.7
2 228.0 0.6 6.0 233.6 -0.2 -4.0
3 200.4 1.2 5.1 206.0 -0.7 -3.4
4 262.2 -0.4 4.8 267.0 0.6 -2.3
5 266.2 0.9 9.3 271.0 -0.6 -7.1
6 264.2 -3.4 7.0 269.0 3.7 -4.7
7 264.2 3.8 7.1 269.0 -3.7 -4.7

Interaction Diagram

ProtaStructure v6.0.392 Page 10


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
3 3
1 1
N - kN
9. 9.
6 6
M
0. 3. 0.
2 kN.m
3 7 0
2
M 1
8. 3.
3 1. kN.m
4 7
3 1
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.242

Beta =0.72

Shear Rebars
Vd(1/2) = 2.7 / 0.6 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.97 / 0.96 N/mm2 Le1/b1 = 10.2 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.05 / 0.01 N/mm2 Le2/b2 = 10.1 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

6C6 (A-3) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

ProtaStructure v6.0.392 Page 11


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 54.6 7.9 -3.9 60.2 -6.3 4.5
2 44.6 6.3 -2.6 50.2 -4.1 3.0
3 37.6 4.8 -2.9 43.2 -3.8 3.4
4 46.5 6.6 -4.5 51.3 -5.3 5.0
5 46.2 6.6 -2.0 51.0 -5.3 2.6
6 45.9 5.5 -3.2 50.7 -4.4 3.7
7 46.7 7.7 -3.4 51.5 -6.2 3.9

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
6 6
N 0. - 0. kN
2 2
M 1
7. 0.
2 2. kN.m
9 7
2 1
M
4. 0. 0.
3 kN.m
5 7 0
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.046

ProtaStructure v6.0.392 Page 12


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Beta =0.95

Shear Rebars
Vd(1/2) = 3.0 / 4.4 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.81 / 0.80 N/mm2 Le1/b1 = 8.3 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.06 / 0.09 N/mm2 Le2/b2 = 8.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

3C7 (A-2) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 344.6 12.2 2.0 350.2 -10.0 -0.5
2 240.6 9.6 1.0 246.2 -8.1 0.3
3 220.1 6.8 1.4 225.7 -5.2 -0.8
4 289.4 10.2 1.7 294.2 -8.3 -0.4
5 289.6 10.2 1.7 294.4 -8.3 -0.5
6 287.0 10.6 1.7 291.8 -8.5 -0.4
7 292.0 9.8 1.7 296.8 -8.2 -0.5

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
N 3 - 3 kN

ProtaStructure v6.0.392 Page 13


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

5 5
0. 0.
2 2
M 1 1
4.
2 2. 5. kN.m
0
2 2 0
M
2. 4. 0.
3 kN.m
0 0 0
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.265

Beta =0.69

Shear Rebars
Vd(1/2) = 0.2 / 5.6 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.86 / 1.05 N/mm2 Le1/b1 = 9.2 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.00 / 0.11 N/mm2 Le2/b2 = 10.2 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

5C7 (B-2) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 378.0 -1.6 1.8 383.6 7.3 -3.1
2 262.5 -0.6 1.0 268.1 5.0 -2.0
3 242.4 0.4 1.8 248.0 3.6 -2.4
4 317.4 -1.5 -1.0 322.2 6.3 0.0
5 316.4 -1.1 4.1 321.2 5.9 -5.1
6 316.9 -4.8 1.5 321.7 9.5 -2.6
7 317.0 2.1 1.6 321.8 2.6 -2.6

Interaction Diagram

ProtaStructure v6.0.392 Page 14


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
3 3
8 8
N - kN
3. 3.
6 6
M 1
7. 4.
2 0. kN.m
3 4
2 2
M - -
0.
3 3. 4. kN.m
0
3 1 4
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.290

Beta =0.66

Shear Rebars
Vd(1/2) = 0.3 / 0.1 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.95 / 0.78 N/mm2 Le1/b1 = 8.4 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.01 / 0.00 N/mm2 Le2/b2 = 8.5 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

6C7 (A-2) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

ProtaStructure v6.0.392 Page 15


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 78.0 10.8 1.1 83.6 -10.7 -1.5
2 67.8 8.5 0.4 73.4 -6.7 -0.9
3 51.2 6.3 1.4 56.8 -5.9 -1.8
4 65.8 9.0 -0.4 70.6 -8.9 0.1
5 66.0 9.0 2.4 70.8 -8.9 -2.7
6 65.5 7.8 1.0 70.3 -8.0 -1.4
7 66.3 10.2 0.9 71.1 -9.9 -1.2

Interaction Diagram

Critical Loading: 5 - (G+Q-Nx)


D
Mi es
n ig
n
7 7
N 0. - 0. kN
8 8
M 1
9. 0.
2 1. kN.m
0 8
2 5
M - -
0.
3 2. 0. kN.m
0
3 7 8
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.054

ProtaStructure v6.0.392 Page 16


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Beta =0.94

Shear Rebars
Vd(1/2) = 1.0 / 6.4 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.81 / 0.83 N/mm2 Le1/b1 = 8.4 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.02 / 0.13 N/mm2 Le2/b2 = 8.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

3C8 (A-1) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 46.9 -0.9 3.2 20.8 -0.3 -3.0
2 34.7 -0.6 1.6 14.0 -0.2 -3.1
3 30.1 -0.5 2.0 16.0 -0.2 -1.4
4 38.7 -0.7 2.8 18.3 -0.2 -2.5
5 40.5 -0.8 2.5 17.1 -0.3 -2.5
6 38.3 -0.7 2.6 16.1 -0.3 -2.5
7 40.9 -0.8 2.7 19.3 -0.2 -2.5

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
N 4 - 4 kN

ProtaStructure v6.0.392 Page 17


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

6. 6.
9 9
M - -
0.
2 0. 0. kN.m
0
2 9 5
M
3. 0. 4.
3 kN.m
2 5 0
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.035

Beta =0.96

Shear Rebars
Vd(1/2) = 4.5 / 0.2 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.79 / 0.78 N/mm2 Le1/b1 = 10.2 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.09 / 0.00 N/mm2 Le2/b2 = 13.7 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

5C8 (B-3) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 274.7 3.3 -4.7 280.3 1.8 5.0
2 189.1 2.3 -2.9 194.7 1.6 3.2
3 185.9 2.9 -3.2 191.5 0.7 3.3
4 229.2 3.1 -6.5 234.0 1.2 6.7
5 232.9 2.5 -1.3 237.7 1.8 1.6
6 231.1 -0.5 -3.9 235.9 4.8 4.1
7 231.0 6.2 -3.9 235.8 -1.9 4.1

Interaction Diagram

ProtaStructure v6.0.392 Page 18


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
2 2
8 8
N - kN
0. 0.
3 3
M
3. 3. 0.
2 kN.m
3 2 0
2
M
5. 3. 7.
3 kN.m
0 2 5
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.212

Beta =0.76

Shear Rebars
Vd(1/2) = 2.1 / 0.2 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 1.00 / 0.78 N/mm2 Le1/b1 = 8.4 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.04 / 0.00 N/mm2 Le2/b2 = 8.5 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

6C8 (A-1) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

ProtaStructure v6.0.392 Page 19


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 50.1 9.9 7.6 55.7 -10.6 -7.5
2 45.8 8.2 5.8 51.4 -7.3 -5.3
3 29.5 6.1 4.6 35.1 -6.5 -4.6
4 41.6 8.3 5.3 46.4 -9.0 -5.3
5 42.5 8.3 7.5 47.3 -8.9 -7.3
6 41.6 7.1 6.4 46.4 -8.0 -6.3
7 42.4 9.6 6.3 47.2 -9.9 -6.3

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
5 5
N 5. - 5. kN
7 7
- -
M -
1 1
2 0. kN.m
0. 7.
2 6
6 8
M
7. 0. 0.
3 kN.m
6 6 0
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

ProtaStructure v6.0.392 Page 20


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

N/bhFcu =0.042

Beta =0.95

Shear Rebars
Vd(1/2) = 4.7 / 6.2 kN Short Column... As (Req): %0.83 438.49 mm2
vc'(1/2) = 0.80 / 0.80 N/mm2 Le1/b1 = 8.5 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.09 / 0.12 N/mm2 Le2/b2 = 8.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

5C9 (B-4) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 212.7 4.4 -3.1 218.3 -3.1 2.2
2 157.2 2.9 -2.2 162.8 -2.0 1.5
3 145.7 3.1 -2.0 151.3 -2.2 1.4
4 183.3 4.2 -5.0 188.1 -3.1 4.3
5 176.7 3.2 -0.2 181.5 -2.0 -0.7
6 179.9 0.3 -2.6 184.7 0.9 1.8
7 180.1 7.1 -2.6 184.9 -6.0 1.8

Interaction Diagram

Critical Loading: 1 - (G+Q)


Mi D
n es
ig

ProtaStructure v6.0.392 Page 21


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

n
2 2
1 1
N - kN
8. 8.
3 3
M
4. 2. 6.
2 kN.m
4 5 9
2
M - -
0.
3 3. 2. kN.m
0
3 1 5
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.165

Beta =0.81

Shear Rebars
Vd(1/2) = 0.1 / 0.2 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.82 / 0.83 N/mm2 Le1/b1 = 10.1 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.00 / 0.00 N/mm2 Le2/b2 = 10.1 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

5C10 (C-2) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 255.8 -11.0 1.2 261.4 5.6 -1.1
2 168.9 -7.3 0.6 174.5 3.6 -0.6
3 186.9 -8.3 1.8 192.5 4.1 -1.5
4 215.8 -9.3 -2.1 220.6 4.8 2.2
5 214.2 -9.0 4.1 219.0 4.5 -4.0
6 216.8 -12.0 0.9 221.6 7.7 -0.7
7 213.2 -6.3 1.1 218.0 1.6 -1.0

Interaction Diagram

ProtaStructure v6.0.392 Page 22


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
2 2
6 6
N - kN
1. 1.
4 4
- -
M -
1 1
2 3. kN.m
1. 3.
2 0
0 3
M
1. 3. 0.
3 kN.m
2 0 0
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.198

Beta =0.77

Shear Rebars
Vd(1/2) = 1.0 / 3.4 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.97 / 0.91 N/mm2 Le1/b1 = 9.2 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.02 / 0.07 N/mm2 Le2/b2 = 10.2 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

6C10 (C-2) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

ProtaStructure v6.0.392 Page 23


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 94.7 -13.9 0.5 100.3 15.0 -0.9
2 66.8 -9.2 -0.5 72.4 10.1 -0.1
3 57.5 -9.1 0.9 63.1 10.7 -1.5
4 79.6 -11.7 -1.0 84.4 12.5 0.6
5 79.5 -11.7 1.8 84.3 12.6 -2.1
6 80.0 -12.8 0.3 84.8 13.5 -0.7
7 79.1 -10.5 0.5 83.9 11.6 -0.8

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
1 1
0 0
N - kN
0. 0.
3 3
M 1 1
1.
2 5. 6. kN.m
2
2 0 1
M - -
0.
3 0. 1. kN.m
0
3 9 2
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

ProtaStructure v6.0.392 Page 24


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

N/bhFcu =0.076

Beta =0.91

Shear Rebars
Vd(1/2) = 0.1 / 8.4 kN Short Column... As (Req): %0.47 248.73 mm2
vc'(1/2) = 0.78 / 0.85 N/mm2 Le1/b1 = 8.4 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.00 / 0.17 N/mm2 Le2/b2 = 8.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

5C11 (C-3) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 222.4 -11.1 -3.4 228.0 5.4 2.9
2 143.1 -7.4 -1.9 148.7 3.5 1.6
3 168.7 -7.7 -2.9 174.3 3.7 2.4
4 185.1 -9.1 -5.9 189.9 4.3 5.6
5 189.4 -9.6 0.3 194.2 4.8 -0.7
6 188.8 -12.1 -2.9 193.6 7.5 2.6
7 185.7 -6.6 -2.7 190.5 1.6 2.3

Interaction Diagram

Critical Loading: 1 - (G+Q)


Mi D
n es
ig

ProtaStructure v6.0.392 Page 25


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

n
2 2
2 2
N - kN
8. 8.
0 0
- -
M -
1 1
2 2. kN.m
1. 3.
2 6
1 8
M - -
0.
3 3. 2. kN.m
0
3 4 6
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.172

Beta =0.80

Shear Rebars
Vd(1/2) = 1.1 / 3.5 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.93 / 0.89 N/mm2 Le1/b1 = 9.0 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.02 / 0.07 N/mm2 Le2/b2 = 10.2 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

6C11 (C-3) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 70.1 -11.5 -3.2 75.7 14.3 3.5
2 41.5 -7.5 -1.9 47.1 9.6 2.0
3 48.1 -8.4 -2.4 53.7 10.1 3.0
4 58.7 -9.7 -4.0 63.5 12.1 4.3
5 59.2 -9.7 -1.3 64.0 12.0 1.6
6 59.3 -10.8 -2.7 64.1 12.9 3.0
7 58.6 -8.6 -2.6 63.4 11.2 2.9

Interaction Diagram

ProtaStructure v6.0.392 Page 26


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
7 7
N 5. - 5. kN
7 7
M 1 1
0.
2 4. 7. kN.m
9
2 3 6
M
3. 0. 0.
3 kN.m
5 9 0
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.057

Beta =0.93

Shear Rebars
Vd(1/2) = 2.6 / 8.2 kN Short Column... As (Req): %0.71 375.19 mm2
vc'(1/2) = 0.83 / 0.84 N/mm2 Le1/b1 = 8.3 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.05 / 0.16 N/mm2 Le2/b2 = 8.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

5C12 (C-4) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

ProtaStructure v6.0.392 Page 27


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 92.6 -7.1 -1.7 98.2 3.6 1.2
2 63.9 -4.7 -1.2 69.5 2.4 0.8
3 66.0 -4.6 -1.0 71.6 2.4 0.6
4 81.8 -5.5 -4.3 86.6 2.6 3.9
5 75.0 -6.4 1.4 79.8 3.5 -1.9
6 80.2 -8.7 -1.6 85.0 6.0 1.1
7 76.6 -3.2 -1.3 81.4 0.1 0.9

Interaction Diagram

Critical Loading: 6 - (G+Q+Ny)


D
Mi es
n ig
n
8 8
N 5. - 5. kN
0 0
-
M - -
1
2 8. 1. kN.m
0.
2 7 0
2
M - -
0.
3 1. 1. kN.m
0
3 6 0
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

ProtaStructure v6.0.392 Page 28


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

N/bhFcu =0.064

Beta =0.92

Shear Rebars
Vd(1/2) = 2.6 / 4.7 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.85 / 0.83 N/mm2 Le1/b1 = 9.4 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.05 / 0.09 N/mm2 Le2/b2 = 10.1 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

6C12 (C-4) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 32.0 -8.0 -2.8 37.6 9.6 2.6
2 19.2 -5.0 -1.9 24.8 6.3 1.8
3 26.4 -6.0 -1.9 32.0 6.6 1.7
4 27.6 -6.7 -3.5 32.4 8.1 3.2
5 26.2 -6.7 -1.2 31.0 8.0 1.1
6 27.3 -7.8 -2.4 32.1 8.9 2.2
7 26.5 -5.6 -2.3 31.3 7.2 2.1

Interaction Diagram

Critical Loading: 1 - (G+Q)


Mi D
n es
ig

ProtaStructure v6.0.392 Page 29


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

n
3 3
N 7. - 7. kN
6 6
M 1
9. 0.
2 2. kN.m
6 4
2 3
M - -
0.
3 2. 0. kN.m
0
3 8 4
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.028

Beta =0.97

Shear Rebars
Vd(1/2) = 2.1 / 5.3 kN Short Column... As (Req): %0.53 279.21 mm2
vc'(1/2) = 0.78 / 0.78 N/mm2 Le1/b1 = 8.4 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.04 / 0.11 N/mm2 Le2/b2 = 8.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

5C13 (C-1) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 128.1 -8.2 4.3 133.7 4.5 -3.5
2 89.8 -5.6 2.8 95.4 3.1 -2.3
3 88.4 -6.3 2.6 94.0 3.4 -2.2
4 106.1 -7.4 0.9 110.9 4.4 -0.1
5 110.2 -6.4 6.4 115.0 3.3 -5.8
6 109.9 -9.8 3.5 114.7 6.9 -2.8
7 106.4 -4.0 3.8 111.2 0.7 -3.1

Interaction Diagram

ProtaStructure v6.0.392 Page 30


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Critical Loading: 6 - (G+Q+Ny)


D
Mi es
n ig
n
1 1
1 1
N - kN
4. 4.
7 7
-
M - -
1
2 9. 1. kN.m
3.
2 8 3
0
M
3. 1. 0.
3 kN.m
5 3 0
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.087

Beta =0.90

Shear Rebars
Vd(1/2) = 3.9 / 5.3 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.89 / 0.87 N/mm2 Le1/b1 = 10.2 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.08 / 0.11 N/mm2 Le2/b2 = 10.1 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

6C13 (C-1) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

ProtaStructure v6.0.392 Page 31


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 47.3 -10.2 5.0 52.9 10.6 -5.0
2 34.4 -6.6 4.0 40.0 7.2 -3.6
3 28.7 -6.5 3.1 34.3 7.6 -3.0
4 39.2 -8.5 3.1 44.0 8.9 -3.3
5 40.2 -8.5 5.4 45.0 9.0 -5.2
6 40.1 -9.8 4.2 44.9 9.9 -4.2
7 39.3 -7.3 4.3 44.1 7.9 -4.3

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
5 5
N 2. - 2. kN
9 9
M 1 1
0.
2 0. 5. kN.m
6
2 6 4
M
5. 0. 0.
3 kN.m
0 6 0
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.040

ProtaStructure v6.0.392 Page 32


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Beta =0.95

Shear Rebars
Vd(1/2) = 3.4 / 6.3 kN Short Column... As (Req): %0.67 354.93 mm2
vc'(1/2) = 0.80 / 0.80 N/mm2 Le1/b1 = 8.5 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.07 / 0.12 N/mm2 Le2/b2 = 8.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

5C14 (A-1) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 138.5 6.9 7.1 144.1 -3.1 -5.2
2 104.6 4.0 4.6 110.2 -1.8 -3.3
3 86.8 4.3 4.4 92.4 -2.1 -3.2
4 115.0 5.3 4.2 119.7 -2.1 -2.5
5 118.7 6.4 7.7 123.5 -3.2 -6.2
6 115.1 2.8 6.0 119.9 0.8 -4.4
7 118.6 8.9 5.9 123.4 -6.0 -4.3

Interaction Diagram

Critical Loading: 7 - (G+Q-Ny)


D
Mi es
n ig
n
N 1 - 1 kN

ProtaStructure v6.0.392 Page 33


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

2 2
3. 3.
4 4
M 1
8. 1.
2 4. kN.m
9 4
2 1
M
5. 1. 0.
3 kN.m
9 4 0
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.093

Beta =0.89

Shear Rebars
Vd(1/2) = 4.4 / 4.7 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.89 / 0.88 N/mm2 Le1/b1 = 10.2 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.09 / 0.09 N/mm2 Le2/b2 = 10.2 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

5C15 (A-2) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 223.2 11.9 4.1 228.8 -13.4 -4.7
2 159.2 7.1 2.9 164.8 -9.2 -3.2
3 149.9 6.6 3.1 155.5 -7.8 -3.2
4 188.3 9.8 1.4 193.1 -11.0 -1.9
5 188.2 10.1 5.5 193.0 -11.3 -6.0
6 186.5 7.1 3.5 191.3 -8.2 -4.0
7 189.9 12.7 3.3 194.7 -14.1 -3.9

Interaction Diagram

ProtaStructure v6.0.392 Page 34


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Critical Loading: 7 - (G+Q-Ny)


D
Mi es
n ig
n
1 1
9 9
N - kN
4. 4.
7 7
- -
M -
1 1
2 2. kN.m
4. 7.
2 2
1 3
M - -
0.
3 3. 2. kN.m
0
3 9 2
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.147

Beta =0.83

Shear Rebars
Vd(1/2) = 2.0 / 8.5 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.95 / 0.99 N/mm2 Le1/b1 = 8.4 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.04 / 0.17 N/mm2 Le2/b2 = 8.7 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

5C16 (A-3) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

ProtaStructure v6.0.392 Page 35


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 144.0 6.3 -1.5 198.2 -8.0 3.2
2 103.2 4.0 -0.9 147.0 -6.3 1.9
3 106.1 3.7 -2.4 136.1 -5.0 2.2
4 120.9 5.4 -4.5 160.7 -6.9 6.2
5 123.4 5.0 1.9 173.5 -6.5 -0.7
6 120.5 2.5 -1.2 165.6 -3.3 2.6
7 123.8 8.0 -1.5 168.6 -10.1 2.9

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
1 1
9 9
N - kN
8. 8.
2 2
-
M - -
1
2 8. 2. kN.m
0.
2 0 3
7
M
3. 2. 0.
3 kN.m
2 3 0
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

ProtaStructure v6.0.392 Page 36


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

N/bhFcu =0.150

Beta =0.83

Shear Rebars
Vd(1/2) = 0.6 / 6.3 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.85 / 0.95 N/mm2 Le1/b1 = 8.3 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.01 / 0.13 N/mm2 Le2/b2 = 8.7 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

3C17 (E-4) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 13.1 0.2 0.2 11.5 -0.2 0.3
2 9.0 0.1 0.1 10.1 0.0 0.2
3 10.2 0.2 0.2 9.6 -0.2 0.1
4 11.0 0.2 0.1 11.2 -0.2 0.2
5 11.3 0.1 0.2 8.4 -0.1 0.3
6 10.7 0.1 0.2 10.9 -0.2 0.2
7 11.5 0.2 0.1 8.7 -0.1 0.2

Interaction Diagram

Critical Loading: 1 - (G+Q)


Mi D
n es
ig

ProtaStructure v6.0.392 Page 37


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

n
1 1
N 3. - 3. kN
1 1
M - -
0.
2 0. 0. kN.m
0
2 2 2
M
0. 0. 0.
3 kN.m
3 2 5
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.010

Beta =0.99

Shear Rebars
Vd(1/2) = 0.0 / 0.0 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.75 / 0.77 N/mm2 Le1/b1 = 13.7 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.00 / 0.00 N/mm2 Le2/b2 = 10.1 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

5C17 (A-4) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 82.4 4.1 -7.6 146.5 -2.3 3.2
2 68.4 2.8 -5.5 110.3 -1.4 2.5
3 54.5 3.2 -4.5 91.2 -1.8 2.1
4 73.1 4.0 -9.3 131.5 -2.4 6.1
5 66.9 3.0 -3.3 115.0 -1.4 -0.7
6 68.3 0.8 -6.2 121.3 1.4 2.6
7 71.8 6.2 -6.4 125.2 -5.3 2.8

Interaction Diagram

ProtaStructure v6.0.392 Page 38


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
1 1
4 4
N - kN
6. 6.
5 5
M
4. 1. 0.
2 kN.m
1 7 0
2
-
M - -
1
3 7. 1. kN.m
1.
3 6 7
1
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.111

Beta =0.87

Shear Rebars
Vd(1/2) = 10.8 / 4.0 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.92 / 0.84 N/mm2 Le1/b1 = 10.0 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.22 / 0.08 N/mm2 Le2/b2 = 10.2 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

3C19 (C-2) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

ProtaStructure v6.0.392 Page 39


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 382.8 -0.2 2.9 383.9 -1.3 -1.1
2 248.0 0.7 1.6 249.0 -1.3 -0.6
3 280.0 -0.7 2.9 281.1 -0.7 -1.1
4 323.2 0.0 2.5 324.1 -1.2 -0.6
5 320.8 -0.3 2.3 321.7 -1.0 -1.2
6 324.7 0.6 2.5 325.6 -1.0 -0.9
7 319.2 -0.9 2.4 320.1 -1.2 -0.8

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
3 3
8 8
N - kN
3. 3.
9 9
M - - -
2 1. 4. 7. kN.m
2 3 4 3
M
2. 4. 0.
3 kN.m
9 4 0
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

ProtaStructure v6.0.392 Page 40


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

N/bhFcu =0.290

Beta =0.66

Shear Rebars
Vd(1/2) = 3.6 / 0.1 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 1.97 / 0.84 N/mm2 Le1/b1 = 0.5 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.07 / 0.00 N/mm2 Le2/b2 = 0.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

3C21 (C-4) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 135.2 -3.1 -1.3 136.3 -0.6 0.4
2 94.1 -1.8 -0.8 95.1 -0.6 0.2
3 99.3 -3.1 -0.7 100.4 0.0 0.3
4 119.9 -3.0 -0.7 120.8 -0.2 0.5
5 109.3 -2.2 -1.5 110.2 -0.9 0.2
6 117.6 -2.0 -1.0 118.5 -0.3 0.3
7 111.6 -3.2 -1.1 112.5 -0.8 0.4

Interaction Diagram

Critical Loading: 1 - (G+Q)


Mi D
n es
ig

ProtaStructure v6.0.392 Page 41


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

n
1 1
3 3
N - kN
6. 6.
3 3
M - - -
2 3. 1. 4. kN.m
2 1 6 4
M - -
0.
3 1. 1. kN.m
0
3 3 6
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.103

Beta =0.88

Shear Rebars
Vd(1/2) = 2.8 / 1.9 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 1.19 / 0.96 N/mm2 Le1/b1 = 0.6 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.06 / 0.04 N/mm2 Le2/b2 = 0.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

3C22 (B-2) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 463.6 -9.2 -7.1 469.2 4.9 17.9
2 326.4 -7.9 -8.3 332.0 6.2 19.3
3 291.9 -4.8 -2.3 297.5 1.2 7.1
4 388.5 -7.8 -5.8 393.3 4.3 14.9
5 387.7 -7.8 -6.0 392.5 4.3 15.0
6 387.8 -7.6 -5.9 392.6 4.3 15.0
7 388.4 -7.9 -5.9 393.2 4.4 15.0

Interaction Diagram

ProtaStructure v6.0.392 Page 42


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
4 4
6 6
N - kN
9. 9.
2 2
M - -
0.
2 9. 5. kN.m
0
2 2 4
M 1 2
5.
3 7. 3. kN.m
4
3 9 3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.355

Beta =0.58

Shear Rebars
Vd(1/2) = 8.8 / 1.9 kN Short Column... As (Req): %1.01 534.85 mm2
vc'(1/2) = 1.07 / 0.99 N/mm2 Le1/b1 = 9.2 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.17 / 0.04 N/mm2 Le2/b2 = 8.9 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

3C23 (B-3) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

ProtaStructure v6.0.392 Page 43


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 312.9 -6.2 0.3 318.5 4.4 -6.8
2 226.1 -5.7 2.6 231.7 5.1 -9.4
3 208.7 -3.1 -1.3 214.3 0.9 -1.4
4 260.8 -5.3 0.4 265.6 3.9 -5.9
5 264.9 -5.3 0.2 269.7 3.9 -5.8
6 262.2 -5.2 0.3 267.0 3.9 -5.8
7 263.5 -5.4 0.3 268.3 3.9 -5.8

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
3 3
1 1
N - kN
8. 8.
5 5
M - -
0.
2 6. 3. kN.m
0
2 2 7
-
M - -
1
3 6. 3. kN.m
1.
3 8 7
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

ProtaStructure v6.0.392 Page 44


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

N/bhFcu =0.241

Beta =0.72

Shear Rebars
Vd(1/2) = 0.0 / 1.3 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 0.75 / 0.93 N/mm2 Le1/b1 = 9.0 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.00 / 0.03 N/mm2 Le2/b2 = 8.9 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

3C24 (C-1) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 178.2 -0.3 7.9 179.2 -1.1 -2.8
2 123.4 0.2 5.1 124.5 -1.0 -1.9
3 126.1 -1.1 4.8 127.2 -0.4 -1.7
4 147.4 0.2 7.3 148.3 -1.3 -2.3
5 153.6 -0.7 6.0 154.5 -0.5 -2.5
6 153.3 0.5 6.7 154.2 -0.8 -2.5
7 147.7 -1.0 6.6 148.6 -1.0 -2.3

Interaction Diagram

Critical Loading: 1 - (G+Q)


Mi D
n es
ig

ProtaStructure v6.0.392 Page 45


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

n
1 1
7 7
N - kN
9. 9.
2 2
M - -
0.
2 1. 2. kN.m
0
2 1 1
M
7. 2. 9.
3 kN.m
9 1 6
3
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.136

Beta =0.84

Shear Rebars
Vd(1/2) = 16.0 / 0.1 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 1.44 / 0.76 N/mm2 Le1/b1 = 0.6 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.32 / 0.00 N/mm2 Le2/b2 = 0.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

1C25 (B-3) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 516.3 -7.5 36.8 517.3 2.7 -13.4
2 329.5 -12.6 44.9 330.5 4.4 -16.2
3 366.5 3.2 11.3 367.6 -1.1 -4.1
4 427.0 -7.1 31.2 427.9 2.6 -11.2
5 431.0 -7.1 31.4 431.9 2.5 -11.5
6 428.6 -7.4 31.3 429.5 2.7 -11.4
7 429.3 -6.7 31.3 430.3 2.3 -11.4

Interaction Diagram

ProtaStructure v6.0.392 Page 46


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Critical Loading: 2 - ((G+Q)p1)


D
Mi es
n ig
n
3 3
3 3
N - kN
0. 0.
5 5
-
M -
1 0.
2 3. kN.m
2. 0
2 8
6
M 4 5
3.
3 4. 3. kN.m
8
3 9 9
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.250

Beta =0.71

Shear Rebars
Vd(1/2) = 102.0 / 28.3 kN Short Column... As (Req): %3.09 1633.61 mm2
vc'(1/2) = 2.58 / 2.57 N/mm2 Le1/b1 = 0.5 < 15.0 √ As (Sup): %3.71 1963.50 mm2
v(1/2) = 2.03 / 0.56 N/mm2 Le2/b2 = 0.5 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y25
Links = Y8-300

3C25 (C-3) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

ProtaStructure v6.0.392 Page 47


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 330.5 -0.7 -6.3 331.6 -1.3 2.2
2 210.7 0.2 -3.7 211.7 -1.2 1.3
3 250.0 -1.0 -5.0 251.0 -0.7 1.8
4 274.9 -0.8 -5.3 275.9 -1.0 2.2
5 281.7 -0.4 -5.3 282.6 -1.3 1.6
6 280.8 0.1 -5.2 281.8 -0.9 1.8
7 275.8 -1.3 -5.4 276.7 -1.4 1.9

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
3 3
3 3
N - kN
1. 1.
6 6
M - -
0.
2 1. 3. kN.m
0
2 3 8
M - - -
3 6. 3. 9. kN.m
3 3 8 0
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

ProtaStructure v6.0.392 Page 48


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

N/bhFcu =0.251

Beta =0.71

Shear Rebars
Vd(1/2) = 8.2 / 0.1 kN Short Column... As (Req): %0.40 (min) 211.60 mm2
vc'(1/2) = 1.75 / 0.80 N/mm2 Le1/b1 = 0.5 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.16 / 0.00 N/mm2 Le2/b2 = 0.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

1C26 (A-2) (230/230)


Materials: C20/25 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 445.7 21.1 -2.2 446.7 -7.5 0.6
2 322.4 18.6 -4.0 323.5 -6.7 1.2
3 285.6 9.9 0.6 286.7 -3.5 -0.3
4 374.0 17.8 -2.1 374.9 -6.4 0.7
5 374.4 17.8 -1.6 375.3 -6.3 0.2
6 371.7 17.7 -1.9 372.6 -6.2 0.5
7 376.7 17.9 -1.8 377.6 -6.4 0.4

Interaction Diagram

Critical Loading: 1 - (G+Q)


Mi D
n es
ig

ProtaStructure v6.0.392 Page 49


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

n
4 4
4 4
N - kN
6. 6.
7 7
M 2 2
5.
2 1. 4. kN.m
1
2 1 2
M - -
0.
3 2. 5. kN.m
0
3 2 1
N 5
M 2
a 9.
x 0

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.338

Beta =0.60

Shear Rebars
Vd(1/2) = 8.6 / 42.1 kN Short Column... As (Req): %1.00 528.29 mm2
vc'(1/2) = 2.24 / 2.31 N/mm2 Le1/b1 = 0.5 < 15.0 √ As (Sup): %1.52 804.25 mm2
v(1/2) = 0.17 / 0.84 N/mm2 Le2/b2 = 0.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y8-175

3W1 (A-1) (6549/250)


Materials: C20/25 / Grade 410 (Type 2) Web: Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 641.5 -35.8 117.5 910.9 -22.4 -402.1
2 459.8 -25.0 87.8 724.5 -14.7 -326.5
3 413.1 -21.8 82.5 658.2 -18.4 -258.9
4 536.4 -28.5 98.1 760.1 -18.1 -400.6
5 546.0 -31.6 97.9 782.0 -21.0 -283.5
6 539.4 -30.2 101.5 758.1 -19.4 -275.8
7 543.0 -30.0 94.4 784.0 -19.7 -408.3

Interaction Diagram

ProtaStructure v6.0.392 Page 50


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
9 9
1 1
N - kN
0. 0.
9 9
- - -
M
3 1 4
2 kN.m
5. 1. 8.
2
8 4 7
-
-
M 4
1 0.
3 0 kN.m
8. 0
3 2.
2
1
1
N 6
M 3
a 7
x 2.
5

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.022

Beta =0.97

Shear Rebars
Vd(1/2) = 1.9 / 2.6 kN Short Column... As (Req): %0.40 (min) 6549.00 mm2
vc'(1/2) = 0.41 / 0.49 N/mm2 Le1/b1 = 0.5 < 15.0 √ As (Sup): %0.46 7464.42 mm2
v(1/2) = 0.00 / 0.00 N/mm2 Le2/b2 = 13.5 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 66Y12
Lat. Steel = Y8-150

3W2 (@1-1) (9695/250)


Materials: C20/25 / Grade 410 (Type 2) Web: Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

ProtaStructure v6.0.392 Page 51


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 340.6 -46.0 45.3 682.9 -50.0 -126.7
2 226.6 -33.7 25.1 563.0 -36.3 -90.1
3 229.5 -29.8 43.6 560.8 -36.3 -45.9
4 284.8 -39.0 34.9 577.5 -43.1 40.0
5 284.8 -38.8 43.6 578.2 -43.2 -246.7
6 286.1 -36.9 42.1 601.0 -45.2 -88.6
7 283.5 -40.9 36.4 554.7 -41.1 -118.1

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
6 6
8 8
N - kN
2. 2.
9 9
- -
M -
5 5
2 8. kN.m
0. 2.
2 5
0 8
-
-
M 1
1 0.
3 2 kN.m
3. 0
3 6.
7
7
2
N 4
M 2
a 3
x 7.
5

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.011

Beta =0.99

Shear Rebars
Vd(1/2) = 59.9 / 71.2 kN Short Column... As (Req): %0.40 (min) 9695.00 mm2
vc'(1/2) = 0.45 / 0.50 N/mm2 Le1/b1 = 0.3 < 15.0 √ As (Sup): %0.45 10857.34 mm2

ProtaStructure v6.0.392 Page 52


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

v(1/2) = 0.03 / 0.03 N/mm2 Le2/b2 = 13.4 < 15.0 √


MAdd(1)/2) = 0.0 / 0.0 kN.m 96Y12
Lat. Steel = Y8-150

3W3 (A-4) (6549/250)


Materials: C20/25 / Grade 410 (Type 2) Web: Grade 410 (Type 2) (Links: Grade 410 (Type 2))

Section

Combinations

NTop M22 Top M33 Top NBot M22 Bot M33 Bot
No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 529.2 47.8 -117.0 831.1 30.8 -538.7
2 395.1 35.6 -92.7 662.4 22.1 -393.9
3 358.5 32.5 -52.2 616.6 22.3 -308.6
4 462.2 44.3 -117.2 724.7 29.6 -413.5
5 434.9 36.3 -77.8 684.8 23.5 -493.3
6 445.0 40.4 -90.1 688.9 26.9 -366.3
7 452.1 40.2 -104.9 720.6 26.1 -540.5

Interaction Diagram

Critical Loading: 1 - (G+Q)


D
Mi es
n ig
n
8 8
3 3
N - kN
1. 1.
1 1
M 4 1 6
2 7. 0. 5. kN.m
2 8 4 1
-
-
M 5
1 0.
3 3 kN.m
6. 0
3 8.
6
7
N 1
M 6
a 3
x 7

ProtaStructure v6.0.392 Page 53


Column Reinforcement Design Calc. By: Eng.Mhando Thomas
Rev: 1 Checked By: Eng.Meck Candidius

2.
5

Concrete Cover = 25.0 mm

(BS8110 - Cl. 3.8.4.5)

N/bhFcu =0.020

Beta =0.98

Shear Rebars
Vd(1/2) = 10.4 / 67.2 kN Short Column... As (Req): %0.40 (min) 6549.00 mm2
vc'(1/2) = 0.43 / 0.53 N/mm2 Le1/b1 = 0.5 < 15.0 √ As (Sup): %0.46 7464.42 mm2
v(1/2) = 0.01 / 0.04 N/mm2 Le2/b2 = 13.5 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 66Y12
Lat. Steel = Y8-150

ProtaStructure v6.0.392 Page 54