You are on page 1of 1

Everwell Nig.

LTD Hamz Projects & Logistics LTD (*17R-E52D-8Z93-JGRR)


COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-1

F-3 (C15) Storey: 1 (Con.:C16/20 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 263.4 -1.6 -0.3 257.8 3.0 0.8
2 185.4 -1.1 -0.2 181.4 2.1 0.6
3 235.9 -1.1 0.4 230.2 2.1 -0.5
4 197.0 -1.5 -0.8 191.4 2.9 1.8
5 224.5 1.6 -0.2 219.7 -0.3 0.7
6 220.5 -4.2 -0.3 215.7 5.4 0.7
7 221.7 -1.3 2.5 216.9 2.5 -1.9
8 223.4 -1.4 -3.0 218.5 2.6 3.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 263.4 - 263.4
M1 (kN.m) 3.0 3.0 5.1
M2 (kN.m) 0.8 3.0 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.260 Le1/b1 = 9.6 < 15.0 225
Beta = 0.70 Le2/b2 = 9.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.0 / 0.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y12
vc'(1/2)= 0.81 / 0.78 N/mm2 As (Provided): %0.89 452.39 mm2
v (1/2)= 0.02 / 0.01 N/mm2
Links = Y8-125

F-3 (C15) Storey: 2 (Con.:C16/20 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 42.9 -4.1 -1.5 37.2 3.6 1.1
2 29.6 -2.9 -1.0 25.6 2.5 0.8
3 35.4 -3.1 0.5 29.8 3.0 -0.7
4 31.6 -3.3 -2.8 25.9 2.5 2.4
5 35.8 -2.6 -1.2 31.0 2.1 0.9
6 35.2 -4.3 -1.2 30.4 3.8 0.9
7 35.4 -3.4 -0.7 30.6 2.9 0.3
8 35.6 -3.5 -1.7 30.8 3.1 1.5
Critical Combination:4 - ((G+Q)P2 *F)
Min Design
N (kN) 31.6 - 31.6
M1 (kN.m) -3.3 -0.4 -6.0
M2 (kN.m) -2.8 -0.4 0.0 225
N-max (kN) 0.0
Concrete Cover =25.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.031 Le1/b1 = 9.5 < 15.0 225
Beta = 0.96 Le2/b2 = 9.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.5 / 1.6 kN As (Required): %0.40 (min) 202.50 mm2 4Y12
vc'(1/2)= 0.67 / 0.66 N/mm2 As (Provided): %0.89 452.39 mm2
v (1/2)= 0.06 / 0.04 N/mm2
Links = Y8-125