0% found this document useful (0 votes)
109 views30 pages

Column Reinforcement Design

This document provides design details for column reinforcement in a 4 bedroom building project, including load combinations, required and provided reinforcement, and other structural calculations for 5 columns on the first floor and 1 column on the second floor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Reinforcement,
  • Construction Materials,
  • Engineering Calculations,
  • Structural Performance,
  • Engineering Standards,
  • Design Specifications,
  • Design Evaluation,
  • Design Optimization,
  • Column Reinforcement,
  • Building Codes
0% found this document useful (0 votes)
109 views30 pages

Column Reinforcement Design

This document provides design details for column reinforcement in a 4 bedroom building project, including load combinations, required and provided reinforcement, and other structural calculations for 5 columns on the first floor and 1 column on the second floor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Reinforcement,
  • Construction Materials,
  • Engineering Calculations,
  • Structural Performance,
  • Engineering Standards,
  • Design Specifications,
  • Design Evaluation,
  • Design Optimization,
  • Column Reinforcement,
  • Building Codes

4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)

COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-1

1C1 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 65.7 -0.6 1.4 60.6 1.2 -3.1
2 46.7 -0.4 1.0 43.1 0.8 -2.2
3 50.5 -0.5 0.8 45.4 1.1 -1.9
4 62.3 -0.5 1.6 57.2 0.9 -3.3
5 53.6 1.5 1.3 49.2 -0.9 -2.6
6 58.6 -2.4 1.2 54.2 2.9 -2.6
7 57.1 -0.5 3.0 52.7 1.1 -4.3
8 55.1 -0.4 -0.6 50.7 0.9 -0.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 65.7 - 65.7
M1 (kN.m) 1.2 0.7 0.0 225
M2 (kN.m) -3.1 -0.7 -4.2
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.043 Le1/b1 = 8.5 < 15.0 225
Beta = 0.95 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.8 / 2.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.86 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.06 N/mm2
Links = Y8-175

1C2 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 173.5 -1.1 0.8 168.4 2.3 -1.8
2 123.0 -0.8 0.5 119.3 1.6 -1.2
3 161.8 -1.1 0.9 156.7 2.4 -2.1
4 132.4 -0.7 0.2 127.3 1.5 -0.5
5 149.3 1.0 0.7 145.0 0.0 -1.5
6 145.8 -3.0 0.6 141.5 3.9 -1.5
7 148.9 -1.0 2.4 144.6 2.0 -3.2
8 146.3 -0.9 -1.2 141.9 1.9 0.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 173.5 - 173.5
M1 (kN.m) 2.3 2.0 4.0 225
M2 (kN.m) -1.8 -2.0 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.114 Le1/b1 = 8.5 < 15.0 225
Beta = 0.86 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.3 / 0.6 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.90 / 0.92 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-2

1C3 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 97.7 -0.3 -0.7 92.6 0.7 0.8
2 69.6 -0.2 -0.5 65.9 0.5 0.6
3 83.2 -0.3 -0.7 78.1 0.6 0.8
4 85.0 -0.3 -0.5 79.9 0.5 0.6
5 83.4 1.7 -0.6 79.1 -1.4 0.7
6 83.5 -2.3 -0.6 79.1 2.6 0.7
7 85.7 -0.3 1.3 81.3 0.6 -1.1
8 81.2 -0.2 -2.5 76.9 0.5 2.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 97.7 - 97.7
M1 (kN.m) 0.7 1.1 0.0 225
M2 (kN.m) 0.8 1.1 2.1
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.064 Le1/b1 = 8.5 < 15.0 225
Beta = 0.92 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 1.6 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.91 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.04 N/mm2
Links = Y8-175

1C4 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 111.7 0.2 -0.9 106.6 -0.7 1.7
2 79.6 0.2 -0.6 75.9 -0.5 1.2
3 96.1 0.2 -0.5 91.0 -0.7 0.9
4 96.9 0.2 -1.0 91.8 -0.6 1.9
5 92.1 2.1 -0.7 87.7 -2.4 1.4
6 98.9 -1.7 -0.8 94.5 1.2 1.4
7 95.1 0.2 1.1 90.8 -0.6 -0.5
8 95.8 0.2 -2.7 91.4 -0.6 3.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 111.7 - 111.7
M1 (kN.m) -0.7 -1.3 0.0 225
M2 (kN.m) 1.7 1.3 2.8
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.074 Le1/b1 = 8.5 < 15.0 225
Beta = 0.91 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 0.6 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.88 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-3

1C5 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 119.8 0.5 -2.8 114.7 -1.2 5.3
2 85.0 0.3 -2.0 81.3 -0.9 3.7
3 103.5 0.6 -2.9 98.4 -1.3 5.4
4 100.1 0.2 -1.7 95.0 -0.7 3.2
5 100.4 2.4 -2.4 96.0 -3.0 4.4
6 103.6 -1.6 -2.4 99.2 0.9 4.4
7 101.2 0.4 -0.6 96.9 -1.0 2.7
8 102.7 0.4 -4.3 98.3 -1.1 6.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 119.8 - 119.8
M1 (kN.m) -1.2 -1.3 0.0 225
M2 (kN.m) 5.3 1.3 6.5
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.079 Le1/b1 = 8.5 < 15.0 225
Beta = 0.91 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 3.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.88 / 0.92 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.08 N/mm2
Links = Y8-175

2C5 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 19.8 -0.2 -3.6 14.6 0.9 0.0
2 14.0 -0.2 -2.6 10.4 0.6 0.0
3 18.0 -0.1 -3.6 12.9 1.0 0.0
4 16.8 -0.3 -2.3 11.7 0.5 0.0
5 16.5 0.5 -3.0 12.2 0.1 0.0
6 17.2 -0.8 -3.1 12.8 1.4 0.0
7 16.7 -0.2 -2.8 12.4 0.7 0.0
8 17.0 -0.2 -3.3 12.6 0.8 0.0
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 18.0 - 18.0
M1 (kN.m) 1.0 0.2 0.0 225
M2 (kN.m) -3.6 -0.2 -4.6
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.012 Le1/b1 = 8.5 < 15.0 225
Beta = 0.99 Le2/b2 = 9.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 1.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.03 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-4

1C6 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 117.3 -2.4 -0.4 112.2 4.7 0.2
2 83.1 -1.7 -0.3 79.5 3.3 0.1
3 111.2 -2.4 -0.3 106.1 4.8 0.0
4 87.3 -1.5 -0.3 82.2 2.9 0.2
5 99.1 -0.1 -0.3 94.7 2.2 0.1
6 100.5 -3.9 -0.3 96.1 5.8 0.2
7 99.2 -2.0 1.6 94.8 4.0 -1.8
8 100.3 -2.0 -2.2 96.0 4.0 2.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 117.3 - 117.3
M1 (kN.m) 4.7 1.3 5.9 225
M2 (kN.m) -0.4 -1.3 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.077 Le1/b1 = 8.7 < 15.0 225
Beta = 0.91 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.2 / 0.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.92 / 0.88 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.08 / 0.00 N/mm2
Links = Y8-175

2C6 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 34.5 -8.1 -0.2 29.4 7.3 0.3
2 24.6 -5.7 -0.2 21.0 5.2 0.2
3 31.4 -8.1 0.0 26.3 7.2 0.1
4 29.2 -5.5 -0.4 24.1 5.3 0.4
5 29.3 -6.4 -0.1 25.0 5.8 0.2
6 29.8 -7.3 -0.2 25.4 6.7 0.3
7 29.8 -6.8 0.5 25.4 6.2 -0.4
8 29.3 -7.0 -0.9 24.9 6.3 0.9
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 31.4 - 31.4
M1 (kN.m) -8.1 -0.4 -8.4 225
M2 (kN.m) 0.1 0.4 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.021 Le1/b1 = 8.9 < 15.0 225
Beta = 0.98 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.1 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.84 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.12 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-5

1C7 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 168.6 -2.5 1.0 163.5 4.8 -2.2
2 119.7 -1.8 0.7 116.0 3.3 -1.5
3 135.1 -1.3 0.5 130.0 2.3 -1.1
4 151.0 -2.8 1.1 145.9 5.3 -2.4
5 142.2 -0.3 0.9 137.8 2.3 -1.9
6 145.0 -4.0 0.8 140.7 5.8 -1.8
7 143.5 -2.1 2.7 139.1 4.0 -3.7
8 143.8 -2.1 -1.0 139.4 4.0 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 168.6 - 168.6
M1 (kN.m) 4.8 1.9 6.6 225
M2 (kN.m) -2.2 -1.9 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.111 Le1/b1 = 8.5 < 15.0 225
Beta = 0.87 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.7 / 0.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.93 / 0.90 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.01 N/mm2
Links = Y8-175

1C8 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 175.7 2.6 0.0 170.6 -5.7 -0.5
2 124.4 1.9 0.0 120.8 -4.0 -0.4
3 146.6 1.4 0.2 141.5 -3.2 -0.8
4 149.1 2.9 -0.2 144.0 -6.1 0.0
5 149.7 4.1 0.0 145.4 -6.6 -0.4
6 148.9 0.4 0.0 144.5 -3.1 -0.4
7 150.7 2.2 1.9 146.3 -4.8 -2.3
8 148.0 2.2 -1.9 143.6 -4.8 1.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 175.7 - 175.7
M1 (kN.m) -5.7 -2.0 -7.4 225
M2 (kN.m) -0.5 -2.0 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.116 Le1/b1 = 8.7 < 15.0 225
Beta = 0.86 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.0 / 0.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.93 / 0.89 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.05 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-6

2C8 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 30.9 5.4 2.7 25.7 -3.5 -2.4
2 22.1 3.9 1.9 18.4 -2.5 -1.7
3 29.0 3.5 2.7 23.9 -3.2 -2.4
4 25.5 5.4 1.8 20.4 -2.7 -1.8
5 26.4 5.2 2.3 22.0 -3.6 -2.1
6 26.5 4.0 2.3 22.2 -2.3 -2.1
7 27.0 4.6 2.9 22.6 -2.9 -2.7
8 26.0 4.6 1.7 21.6 -3.0 -1.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 30.9 - 30.9
M1 (kN.m) 5.4 0.3 8.1 225
M2 (kN.m) 2.7 0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.020 Le1/b1 = 8.7 < 15.0 225
Beta = 0.98 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.9 / 1.9 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.83 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.07 / 0.04 N/mm2
Links = Y8-175

1C9 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 131.6 5.4 0.2 126.5 -11.1 -1.4
2 93.3 3.8 0.2 89.6 -7.9 -1.0
3 129.3 5.4 0.2 124.2 -11.2 -1.5
4 93.7 3.4 0.2 88.6 -7.1 -0.9
5 112.9 6.4 0.2 108.5 -11.1 -1.2
6 111.0 2.7 0.2 106.6 -7.8 -1.2
7 112.4 4.5 2.1 108.0 -9.3 -3.0
8 111.5 4.7 -1.7 107.1 -9.6 0.5
Critical Combination:5 - (G+Q+Nx)
Min Design
N (kN) 112.9 - 112.9
M1 (kN.m) -11.1 -1.3 -12.3 225
M2 (kN.m) -1.2 -1.3 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.074 Le1/b1 = 8.7 < 15.0 225
Beta = 0.91 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.8 / 0.4 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.92 / 0.87 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.14 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-7

2C9 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 28.8 11.5 3.0 23.7 -7.6 -2.7
2 20.6 8.1 2.1 17.0 -5.4 -1.9
3 25.8 10.9 3.1 20.7 -6.3 -2.7
4 25.1 8.0 2.0 20.0 -6.5 -1.9
5 24.9 10.1 2.5 20.6 -6.9 -2.3
6 24.5 9.4 2.6 20.1 -6.1 -2.3
7 24.8 9.6 2.9 20.4 -6.4 -2.7
8 24.6 9.9 2.2 20.3 -6.6 -1.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 28.8 - 28.8
M1 (kN.m) 11.5 0.3 14.4 225
M2 (kN.m) 3.0 0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.019 Le1/b1 = 9.0 < 15.0 225
Beta = 0.98 Le2/b2 = 8.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 6.4 / 1.9 kN As (Required): %0.74 376.23 mm2 4Y16
vc'(1/2)= 0.83 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.15 / 0.04 N/mm2
Links = Y8-175

1C10 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 92.4 -0.3 -2.3 87.3 -0.1 4.2
2 65.3 -0.2 -1.6 61.6 -0.1 3.0
3 91.8 -0.4 -2.3 86.7 0.1 4.1
4 63.9 -0.1 -1.5 58.8 -0.2 2.8
5 81.7 1.7 -1.9 77.3 -1.9 3.5
6 75.0 -2.1 -2.0 70.6 1.7 3.6
7 76.9 -0.2 -0.1 72.6 -0.1 1.8
8 79.8 -0.3 -3.8 75.4 0.0 5.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 92.4 - 92.4
M1 (kN.m) -0.3 -1.0 0.0 225
M2 (kN.m) 4.2 1.0 5.1
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.061 Le1/b1 = 8.6 < 15.0 225
Beta = 0.93 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 3.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.89 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.07 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-8

2C10 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 16.2 0.4 -3.1 11.1 -0.2 2.1
2 11.5 0.3 -2.2 7.9 -0.2 1.5
3 15.9 0.2 -3.2 10.8 0.0 2.2
4 13.2 0.5 -1.8 8.1 -0.4 1.3
5 14.6 0.8 -2.6 10.2 -0.7 1.7
6 13.1 -0.2 -2.7 8.8 0.3 1.8
7 13.6 0.4 -2.1 9.2 -0.3 1.2
8 14.1 0.3 -3.1 9.7 -0.1 2.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 16.2 - 16.2
M1 (kN.m) 0.4 0.2 0.0 225
M2 (kN.m) -3.1 -0.2 -3.5
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.011 Le1/b1 = 8.6 < 15.0 225
Beta = 0.99 Le2/b2 = 8.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 1.8 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.04 N/mm2
Links = Y8-175

1C11 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 158.9 -1.1 -1.3 153.8 1.6 2.4
2 112.6 -0.8 -0.9 109.0 1.1 1.7
3 125.6 -0.6 -0.8 120.5 0.6 1.4
4 143.1 -1.1 -1.3 138.0 1.9 2.5
5 134.2 0.9 -1.1 129.8 -0.3 2.0
6 136.2 -2.8 -1.1 131.8 3.1 2.0
7 137.1 -0.9 0.8 132.7 1.3 0.2
8 133.2 -1.0 -3.0 128.9 1.4 3.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 158.9 - 158.9
M1 (kN.m) 1.6 1.8 0.0 225
M2 (kN.m) 2.4 1.8 4.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.105 Le1/b1 = 8.5 < 15.0 225
Beta = 0.87 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.6 / 0.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.93 / 0.88 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-9

1C12 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 98.8 -0.8 0.6 93.7 1.0 -1.6
2 69.9 -0.6 0.4 66.2 0.7 -1.2
3 80.6 -0.9 0.3 75.5 1.2 -0.9
4 85.9 -0.4 0.8 80.8 0.5 -1.8
5 80.8 1.2 0.6 76.4 -0.9 -1.5
6 87.0 -2.6 0.5 82.6 2.7 -1.3
7 85.9 -0.6 2.4 81.5 0.8 -3.1
8 81.9 -0.7 -1.3 77.5 0.9 0.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 98.8 - 98.8
M1 (kN.m) 1.0 1.1 0.0 225
M2 (kN.m) -1.6 -1.1 -2.7
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.065 Le1/b1 = 8.6 < 15.0 225
Beta = 0.92 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 0.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.88 / 0.86 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-175

2C12 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 20.5 -0.9 3.2 15.4 0.7 -2.7
2 14.6 -0.6 2.3 11.0 0.5 -1.9
3 19.0 -1.1 2.3 13.9 0.9 -2.1
4 17.5 -0.4 3.2 12.4 0.2 -2.5
5 17.0 -0.2 2.8 12.6 0.0 -2.4
6 18.1 -1.2 2.6 13.7 1.1 -2.2
7 17.9 -0.7 3.3 13.5 0.5 -2.9
8 17.2 -0.8 2.2 12.8 0.6 -1.8
Critical Combination:7 - (G+Q+Ny)
Min Design
N (kN) 17.9 - 17.9
M1 (kN.m) -0.7 -0.2 0.0 225
M2 (kN.m) 3.3 0.2 3.9
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.012 Le1/b1 = 8.6 < 15.0 225
Beta = 0.99 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 2.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.05 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-10

1C13 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 44.1 -1.4 -1.0 39.0 2.0 1.9
2 31.4 -1.0 -0.7 27.7 1.4 1.4
3 45.4 -1.4 -1.0 40.3 2.0 1.9
4 31.9 -1.0 -0.7 26.8 1.4 1.3
5 35.4 0.7 -0.9 31.0 0.0 1.6
6 39.9 -3.1 -0.9 35.5 3.5 1.6
7 35.1 -1.1 0.9 30.8 1.7 -0.1
8 40.1 -1.3 -2.7 35.8 1.8 3.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 44.1 - 44.1
M1 (kN.m) 2.0 0.5 3.9 225
M2 (kN.m) 1.9 0.5 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.029 Le1/b1 = 8.6 < 15.0 225
Beta = 0.97 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.2 / 2.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.85 / 0.84 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.05 / 0.05 N/mm2
Links = Y8-175

2C13 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1.8 -2.3 -0.3 -3.3 0.4 0.2
2 1.3 -1.6 -0.2 -2.4 0.2 0.1
3 2.9 -2.4 -0.4 -2.2 0.6 0.2
4 1.1 -1.5 -0.1 -4.0 -0.1 0.0
5 1.0 -1.4 -0.3 -3.4 -0.3 0.2
6 2.0 -2.5 -0.2 -2.4 0.9 0.1
7 1.0 -2.0 0.3 -3.4 0.3 -0.4
8 2.0 -1.9 -0.8 -2.3 0.3 0.7
Critical Combination:8 - (G+Q-Ny)
Min Design
N (kN) -2.3 - -2.3
M1 (kN.m) -1.9 0.0 -2.7 225
M2 (kN.m) -0.8 0.0 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = -0.002 Le1/b1 = 8.7 < 15.0 225
Beta = 1.00 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 0.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.75 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-11

1C14 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 99.8 -0.6 -0.5 94.7 0.3 0.6
2 71.1 -0.4 -0.3 67.5 0.2 0.4
3 93.5 -0.5 -0.4 88.4 0.2 0.5
4 79.7 -0.4 -0.3 74.6 0.2 0.4
5 86.8 1.5 -0.4 82.4 -1.7 0.5
6 83.8 -2.4 -0.4 79.4 2.1 0.5
7 82.7 -0.4 1.4 78.3 0.2 -1.2
8 88.0 -0.5 -2.2 83.6 0.3 2.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 99.8 - 99.8
M1 (kN.m) -0.6 -1.1 0.0 225
M2 (kN.m) 0.6 1.1 2.2
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.066 Le1/b1 = 8.5 < 15.0 225
Beta = 0.92 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 0.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.89 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.01 N/mm2
Links = Y8-175

2C14 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 53.3 -6.5 0.6 48.2 11.4 -0.8
2 38.1 -4.6 0.4 34.4 8.2 -0.6
3 48.7 -6.1 0.5 43.6 10.7 -0.7
4 45.1 -5.1 0.6 40.0 9.2 -0.8
5 46.3 -4.8 0.5 41.9 9.0 -0.7
6 45.2 -6.3 0.5 40.8 10.5 -0.7
7 45.3 -5.6 1.0 41.0 9.9 -1.2
8 46.1 -5.4 0.0 41.7 9.7 -0.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 53.3 - 53.3
M1 (kN.m) 11.4 0.6 12.2 225
M2 (kN.m) -0.8 -0.6 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.035 Le1/b1 = 8.5 < 15.0 225
Beta = 0.96 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 6.0 / 0.1 kN As (Required): %0.45 227.46 mm2 4Y16
vc'(1/2)= 0.85 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.14 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-12

1C15 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 136.2 -2.9 1.1 131.1 5.0 -2.7
2 96.7 -2.1 0.8 93.1 3.5 -2.0
3 129.5 -2.9 1.2 124.4 5.0 -2.9
4 103.5 -1.9 0.8 98.4 3.2 -2.0
5 115.0 -0.6 1.0 110.7 2.4 -2.3
6 117.1 -4.4 1.0 112.7 6.0 -2.4
7 112.8 -2.4 2.8 108.5 4.2 -4.1
8 119.3 -2.5 -0.9 114.9 4.3 -0.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 136.2 - 136.2
M1 (kN.m) 5.0 1.5 7.4 225
M2 (kN.m) -2.7 -1.5 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.090 Le1/b1 = 8.6 < 15.0 225
Beta = 0.89 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.5 / 0.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.94 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.08 / 0.00 N/mm2
Links = Y8-175

1C16 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 172.2 1.0 1.1 167.1 -3.0 -2.8
2 122.2 0.7 0.8 118.6 -2.1 -2.0
3 165.8 1.0 1.1 160.7 -2.9 -2.9
4 127.6 0.7 0.9 122.5 -1.9 -2.2
5 148.0 2.7 0.9 143.6 -4.3 -2.4
6 145.4 -1.0 0.9 141.1 -0.7 -2.4
7 143.7 0.9 2.8 139.3 -2.6 -4.2
8 149.7 0.8 -1.0 145.4 -2.4 -0.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 172.2 - 172.2
M1 (kN.m) -3.0 -1.9 -5.4 225
M2 (kN.m) -2.8 -1.9 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.113 Le1/b1 = 8.6 < 15.0 225
Beta = 0.87 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 0.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.83 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-13

1C17 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 217.4 0.4 0.3 212.3 -1.3 -1.2
2 153.5 0.3 0.2 149.9 -0.9 -0.8
3 197.4 0.4 0.8 192.3 -1.4 -2.3
4 164.4 0.2 -0.5 159.3 -0.7 0.6
5 184.3 2.2 0.3 179.9 -2.9 -1.0
6 184.1 -1.6 0.2 179.8 0.7 -0.9
7 183.7 0.3 2.1 179.3 -1.1 -2.7
8 184.7 0.3 -1.7 180.3 -1.0 0.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 217.4 - 217.4
M1 (kN.m) -1.3 -2.4 0.0 225
M2 (kN.m) -1.2 -2.4 -4.5
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.143 Le1/b1 = 8.6 < 15.0 225
Beta = 0.83 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 0.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.94 / 0.93 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-175

2C17 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 35.5 0.1 6.1 30.4 0.0 -8.2
2 25.4 0.1 4.3 21.7 0.0 -5.8
3 33.3 0.3 6.8 28.2 0.0 -8.3
4 29.4 -0.1 3.5 24.3 0.0 -5.7
5 30.4 0.4 5.3 26.1 0.0 -7.0
6 30.5 -0.2 5.1 26.1 0.0 -6.9
7 30.3 0.1 5.8 25.9 0.0 -7.6
8 30.6 0.1 4.6 26.2 0.0 -6.3
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 33.3 - 33.3
M1 (kN.m) 0.3 0.4 0.0 225
M2 (kN.m) -8.3 -0.4 -8.7
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.022 Le1/b1 = 9.6 < 15.0 225
Beta = 0.97 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 5.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.12 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-14

1C18 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 122.2 -0.2 -0.8 117.1 -0.3 0.6
2 86.3 -0.1 -0.5 82.6 -0.2 0.4
3 102.4 -0.2 -0.5 97.3 -0.3 0.1
4 102.0 -0.1 -0.7 96.9 -0.2 0.9
5 103.6 1.1 -0.7 99.2 -0.7 0.5
6 103.5 -1.4 -0.6 99.1 0.3 0.5
7 104.1 -0.1 1.3 99.8 -0.3 -1.4
8 102.9 -0.2 -2.6 98.6 -0.2 2.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 122.2 - 122.2
M1 (kN.m) -0.3 -1.4 0.0 225
M2 (kN.m) -0.8 -1.4 -2.6
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.080 Le1/b1 = 10.3 < 15.0 225
Beta = 0.90 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.88 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.01 N/mm2
Links = Y8-175

2C18 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 20.5 -0.2 0.2 15.4 0.0 -0.2
2 14.7 -0.1 0.2 11.0 0.0 -0.1
3 18.5 -0.2 0.9 13.3 0.0 -0.6
4 18.3 -0.1 -0.4 13.2 0.0 0.2
5 17.6 -0.7 0.2 13.2 0.0 -0.1
6 17.6 0.3 0.2 13.2 0.0 -0.2
7 17.7 -0.2 0.8 13.3 0.0 -0.8
8 17.5 -0.2 -0.4 13.2 0.0 0.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 20.5 - 20.5
M1 (kN.m) -0.2 -0.2 0.0 225
M2 (kN.m) 0.2 0.2 0.5
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.014 Le1/b1 = 9.8 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 0.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-15

1C21 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 123.0 1.5 3.6 117.9 -3.2 -8.2
2 87.4 1.1 2.6 83.7 -2.3 -5.8
3 118.0 1.7 3.6 112.9 -3.5 -8.1
4 91.9 0.7 2.4 86.8 -1.6 -5.3
5 106.2 3.2 3.0 101.8 -4.5 -6.8
6 103.5 -0.6 3.1 99.1 -0.9 -7.1
7 105.1 1.2 4.9 100.7 -2.6 -8.7
8 104.5 1.4 1.2 100.2 -2.9 -5.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 123.0 - 123.0
M1 (kN.m) -3.2 -1.4 0.0 225
M2 (kN.m) -8.2 -1.4 -11.1
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.081 Le1/b1 = 8.5 < 15.0 225
Beta = 0.90 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 4.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.91 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.11 N/mm2
Links = Y8-175

1C22 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 165.8 3.5 -1.2 160.7 -7.5 1.5
2 117.3 2.4 -0.9 113.7 -5.2 1.1
3 151.1 3.5 -1.6 146.0 -7.5 2.1
4 127.1 2.1 -0.5 122.0 -4.5 0.5
5 141.9 4.8 -1.1 137.6 -8.0 1.3
6 139.7 1.0 -1.0 135.3 -4.5 1.3
7 140.3 2.9 0.9 135.9 -6.3 -0.6
8 141.3 2.9 -3.0 136.9 -6.3 3.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 165.8 - 165.8
M1 (kN.m) -7.5 -1.9 -9.1 225
M2 (kN.m) 1.5 1.9 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.109 Le1/b1 = 8.7 < 15.0 225
Beta = 0.87 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.3 / 0.7 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.96 / 0.95 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.10 / 0.02 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-16

2C22 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 27.5 5.0 -1.3 22.4 -0.1 1.5
2 19.6 3.5 -0.9 16.0 0.0 1.1
3 25.4 5.2 -2.0 20.3 -0.1 2.0
4 23.3 2.8 -0.2 18.2 0.0 0.5
5 23.6 4.6 -1.2 19.2 -0.1 1.3
6 23.5 3.9 -1.1 19.2 0.0 1.2
7 23.5 4.2 -0.5 19.2 -0.1 0.7
8 23.6 4.2 -1.7 19.2 -0.1 1.9
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 25.4 - 25.4
M1 (kN.m) 5.2 0.3 7.2 225
M2 (kN.m) 2.0 0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.017 Le1/b1 = 9.7 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.8 / 1.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.03 N/mm2
Links = Y8-175

1C23 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 70.7 0.9 0.8 65.6 -1.8 -2.5
2 50.4 0.6 0.6 46.7 -1.3 -1.7
3 70.5 0.9 0.8 65.3 -1.7 -2.4
4 52.3 0.6 0.5 47.2 -1.3 -1.6
5 62.0 2.7 0.7 57.6 -3.3 -2.0
6 58.8 -1.1 0.7 54.5 0.3 -2.1
7 61.9 0.7 2.6 57.6 -1.5 -3.8
8 58.9 0.8 -1.2 54.5 -1.6 -0.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 70.7 - 70.7
M1 (kN.m) -1.8 -0.8 0.0 225
M2 (kN.m) -2.5 -0.8 -4.1
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.047 Le1/b1 = 8.6 < 15.0 225
Beta = 0.94 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.0 / 2.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.87 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.05 / 0.05 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-17

2C23 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 19.3 0.2 4.1 14.2 -0.5 -4.3
2 13.8 0.1 2.9 10.2 -0.3 -3.1
3 19.3 0.1 4.1 14.2 -0.4 -4.2
4 15.3 0.1 2.8 10.2 -0.3 -3.2
5 16.8 0.7 3.4 12.4 -0.9 -3.7
6 16.4 -0.4 3.5 12.0 0.1 -3.7
7 16.8 0.2 3.9 12.5 -0.4 -4.1
8 16.3 0.1 3.1 11.9 -0.4 -3.2
Critical Combination:5 - (G+Q+Nx)
Min Design
N (kN) 16.8 - 16.8
M1 (kN.m) -0.9 -0.2 0.0 225
M2 (kN.m) -3.7 -0.2 -4.6
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.011 Le1/b1 = 8.7 < 15.0 225
Beta = 0.99 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 2.8 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.07 N/mm2
Links = Y8-175

1C24 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 68.2 -2.0 -0.5 63.1 3.3 0.9
2 48.6 -1.4 -0.4 44.9 2.3 0.7
3 71.8 -2.0 -0.5 66.7 3.2 0.8
4 47.0 -1.4 -0.4 41.9 2.3 0.8
5 56.0 0.2 -0.4 51.6 1.0 0.8
6 60.6 -3.6 -0.5 56.2 4.6 0.8
7 57.5 -1.7 1.4 53.1 2.8 -0.9
8 59.1 -1.7 -2.3 54.7 2.8 2.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 68.2 - 68.2
M1 (kN.m) 3.3 0.8 4.2 225
M2 (kN.m) 0.9 0.8 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.045 Le1/b1 = 8.6 < 15.0 225
Beta = 0.95 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.7 / 0.4 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.84 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-18

2C24 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 19.9 -4.5 0.7 14.8 3.8 0.0
2 14.2 -3.2 0.5 10.6 2.7 0.0
3 19.7 -4.4 0.8 14.6 3.7 -0.1
4 15.8 -3.2 0.4 10.7 2.8 0.0
5 16.6 -3.3 0.5 12.2 2.7 0.0
6 17.5 -4.4 0.6 13.1 3.8 -0.1
7 17.1 -4.0 1.2 12.7 3.4 -0.6
8 17.0 -3.7 0.0 12.6 3.1 0.6
Critical Combination:7 - (G+Q+Ny)
Min Design
N (kN) 17.1 - 17.1
M1 (kN.m) -4.0 -0.2 -5.2 225
M2 (kN.m) 1.2 0.2 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.011 Le1/b1 = 8.7 < 15.0 225
Beta = 0.99 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.7 / 0.6 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.01 N/mm2
Links = Y8-175

1C25 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 123.7 0.3 -0.8 118.6 -1.3 1.2
2 87.7 0.2 -0.5 84.0 -1.0 0.8
3 105.0 0.3 -0.6 99.9 -1.5 0.8
4 104.9 0.1 -0.7 99.8 -0.8 1.2
5 107.3 2.1 -0.6 102.9 -2.9 1.0
6 103.2 -1.6 -0.7 98.8 0.6 1.0
7 106.7 0.3 1.3 102.3 -1.2 -0.9
8 103.8 0.2 -2.5 99.4 -1.1 2.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 123.7 - 123.7
M1 (kN.m) -1.3 -1.4 0.0 225
M2 (kN.m) 1.2 1.4 2.6
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.081 Le1/b1 = 8.6 < 15.0 225
Beta = 0.90 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 0.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.90 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-19

2C25 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 24.1 1.1 -0.2 19.0 -0.5 0.0
2 17.3 0.8 -0.2 13.6 -0.4 0.0
3 22.8 1.2 0.0 17.7 -0.6 -0.2
4 20.3 0.6 -0.3 15.2 -0.2 0.0
5 21.0 1.5 -0.2 16.6 -1.0 -0.1
6 20.4 0.4 -0.2 16.0 0.1 0.0
7 21.0 0.9 0.5 16.6 -0.4 -0.7
8 20.4 0.9 -0.9 16.1 -0.4 0.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 24.1 - 24.1
M1 (kN.m) 1.1 0.3 1.4 225
M2 (kN.m) -0.2 -0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.016 Le1/b1 = 8.7 < 15.0 225
Beta = 0.98 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.00 N/mm2
Links = Y8-175

1C26 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 130.0 1.0 1.9 124.9 -2.1 -4.3
2 92.0 0.7 1.3 88.3 -1.4 -3.0
3 121.0 1.1 1.9 115.9 -2.2 -4.4
4 96.7 0.5 1.2 91.6 -1.1 -2.7
5 109.5 2.9 1.6 105.1 -3.7 -3.7
6 111.3 -1.1 1.6 106.9 0.2 -3.7
7 111.8 0.8 3.5 107.4 -1.7 -5.4
8 109.0 0.9 -0.3 104.6 -1.8 -1.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 130.0 - 130.0
M1 (kN.m) -2.1 -1.5 0.0 225
M2 (kN.m) -4.3 -1.5 -6.2
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.086 Le1/b1 = 8.5 < 15.0 225
Beta = 0.90 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.7 / 0.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.89 / 0.86 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-20

1C27 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 121.8 -0.9 -2.3 116.7 1.6 4.4
2 86.3 -0.6 -1.6 82.7 1.1 3.1
3 113.5 -0.9 -2.3 108.4 1.6 4.5
4 92.2 -0.6 -1.4 87.1 1.0 2.6
5 106.1 1.2 -1.9 101.7 -0.6 3.7
6 101.1 -2.7 -1.9 96.7 3.2 3.7
7 102.6 -0.8 -0.1 98.2 1.4 2.0
8 104.6 -0.7 -3.7 100.2 1.3 5.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 121.8 - 121.8
M1 (kN.m) 1.6 1.4 0.0 225
M2 (kN.m) 4.4 1.4 5.8
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.080 Le1/b1 = 8.5 < 15.0 225
Beta = 0.90 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.6 / 3.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.89 / 0.92 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.07 N/mm2
Links = Y8-175

2C27 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 20.6 -3.0 -1.8 15.5 2.3 0.0
2 14.7 -2.2 -1.3 11.1 1.7 0.0
3 17.3 -2.9 -1.9 12.2 2.0 0.0
4 19.8 -2.2 -0.9 14.7 1.9 0.0
5 17.8 -2.0 -1.5 13.5 1.4 0.0
6 17.6 -3.2 -1.5 13.2 2.6 0.0
7 17.7 -2.6 -1.2 13.4 2.0 0.0
8 17.6 -2.6 -1.9 13.3 2.0 0.0
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 17.3 - 17.3
M1 (kN.m) -2.9 -0.2 -4.8 225
M2 (kN.m) -1.9 -0.2 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.011 Le1/b1 = 8.5 < 15.0 225
Beta = 0.99 Le2/b2 = 9.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.9 / 0.6 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.05 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-21

1C28 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 212.1 -2.8 0.5 207.0 5.3 -1.7
2 150.1 -1.9 0.4 146.5 3.8 -1.2
3 185.6 -2.7 0.1 180.5 5.3 -0.7
4 169.6 -1.8 0.8 164.5 3.5 -2.1
5 180.5 -0.4 0.4 176.1 2.6 -1.4
6 179.8 -4.3 0.5 175.4 6.5 -1.5
7 178.1 -2.3 2.4 173.7 4.5 -3.3
8 182.2 -2.3 -1.5 177.8 4.5 0.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 212.1 - 212.1
M1 (kN.m) 5.3 2.4 7.3 225
M2 (kN.m) -1.7 -2.4 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.140 Le1/b1 = 8.5 < 15.0 225
Beta = 0.84 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.9 / 0.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.96 / 0.94 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.01 N/mm2
Links = Y8-175

2C28 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 20.0 -8.0 1.9 14.9 6.5 -1.1
2 14.4 -5.6 1.3 10.7 4.6 -0.8
3 16.3 -7.5 0.9 11.2 5.6 -0.5
4 20.0 -5.8 2.1 14.9 5.3 -1.3
5 17.6 -6.1 1.6 13.2 4.9 -0.9
6 16.9 -7.4 1.6 12.5 6.2 -0.9
7 16.6 -6.7 2.2 12.3 5.5 -1.5
8 17.8 -6.8 1.0 13.5 5.6 -0.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 20.0 - 20.0
M1 (kN.m) -8.0 -0.2 -9.8 225
M2 (kN.m) 1.9 0.2 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.013 Le1/b1 = 8.5 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.8 / 1.2 kN As (Required): %0.47 236.13 mm2 4Y16
vc'(1/2)= 0.82 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.11 / 0.03 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-22

1C29 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 117.7 2.3 -1.7 112.6 -5.4 2.6
2 83.5 1.6 -1.2 79.9 -3.8 1.8
3 118.4 2.2 -1.8 113.3 -5.4 2.7
4 82.2 1.4 -1.0 77.1 -3.4 1.5
5 100.9 3.7 -1.5 96.5 -6.1 2.2
6 99.6 0.1 -1.5 95.2 -3.0 2.2
7 98.7 2.0 0.4 94.3 -4.6 0.4
8 101.7 1.8 -3.4 97.4 -4.5 3.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 117.7 - 117.7
M1 (kN.m) -5.4 -1.3 -7.7 225
M2 (kN.m) 2.6 1.3 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.077 Le1/b1 = 8.7 < 15.0 225
Beta = 0.91 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.3 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.91 / 0.80 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.08 / 0.00 N/mm2
Links = Y8-175

2C30 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 32.2 12.4 -2.2 27.1 -18.3 1.7
2 23.0 8.8 -1.5 19.4 -13.0 1.2
3 31.9 12.1 -2.2 26.8 -17.6 1.7
4 24.9 9.0 -1.3 19.8 -14.0 1.1
5 27.7 10.9 -1.9 23.3 -16.0 1.5
6 27.5 10.2 -1.8 23.1 -15.2 1.4
7 27.4 10.6 -1.4 23.0 -15.7 1.0
8 27.8 10.6 -2.2 23.4 -15.6 1.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 32.2 - 32.2
M1 (kN.m) -18.3 -0.4 -20.4 225
M2 (kN.m) -2.2 -0.4 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.021 Le1/b1 = 9.0 < 15.0 225
Beta = 0.97 Le2/b2 = 8.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 10.2 / 1.4 kN As (Required): %1.16 585.83 mm2 4Y16
vc'(1/2)= 0.83 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.24 / 0.03 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-23

1C31 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 83.8 -5.0 -0.5 78.7 9.8 0.3
2 58.9 -3.5 -0.3 55.2 6.9 0.2
3 83.6 -5.0 -0.5 78.5 9.7 0.2
4 54.0 -3.2 -0.4 48.9 6.1 0.4
5 69.8 -2.3 -0.4 65.4 6.4 0.3
6 71.5 -6.2 -0.4 67.2 10.1 0.2
7 65.8 -4.3 1.4 61.4 8.2 -1.4
8 75.6 -4.2 -2.2 71.2 8.2 1.9
Critical Combination:6 - (G+Q-Nx)
Min Design
N (kN) 71.5 - 71.5
M1 (kN.m) 10.1 0.8 10.8 225
M2 (kN.m) -0.4 -0.8 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.047 Le1/b1 = 8.6 < 15.0 225
Beta = 0.94 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.4 / 0.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.88 / 0.87 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.13 / 0.00 N/mm2
Links = Y8-175

1C32 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 64.4 2.0 -0.4 59.3 -4.5 0.2
2 45.6 1.4 -0.3 42.0 -3.2 0.1
3 58.4 1.3 -0.4 53.3 -2.9 0.1
4 51.7 2.1 -0.4 46.6 -4.6 0.3
5 56.5 3.6 -0.4 52.1 -5.5 0.2
6 53.0 -0.1 -0.3 48.6 -2.1 0.1
7 59.7 1.7 1.5 55.3 -3.8 -1.5
8 49.7 1.7 -2.2 45.4 -3.8 1.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 64.4 - 64.4
M1 (kN.m) -4.5 -0.7 -5.2 225
M2 (kN.m) -0.4 -0.7 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.042 Le1/b1 = 8.6 < 15.0 225
Beta = 0.95 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.0 / 1.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.86 / 0.86 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.07 / 0.03 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-24

2C32 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 23.1 2.3 0.9 18.0 1.0 0.0
2 16.5 1.6 0.7 12.8 0.7 0.0
3 19.6 0.8 0.8 14.5 1.9 0.0
4 21.1 3.0 0.8 16.0 -0.1 0.0
5 20.0 2.5 0.7 15.6 0.2 0.0
6 19.5 1.4 0.9 15.2 1.5 0.0
7 19.8 1.9 1.0 15.5 0.8 0.0
8 19.6 2.0 0.6 15.3 0.9 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 23.1 - 23.1
M1 (kN.m) 2.3 0.3 3.2 225
M2 (kN.m) 0.9 0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.015 Le1/b1 = 8.6 < 15.0 225
Beta = 0.98 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.0 / 0.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.01 N/mm2
Links = Y8-175

1C33 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 61.9 -4.2 -0.3 56.8 7.6 0.1
2 43.6 -2.9 -0.2 39.9 5.4 0.1
3 55.7 -4.2 -0.4 50.6 7.7 0.3
4 45.9 -2.6 -0.1 40.8 4.8 -0.1
5 51.7 -1.6 -0.2 47.3 4.6 0.1
6 52.8 -5.4 -0.3 48.5 8.3 0.1
7 54.9 -3.5 1.6 50.5 6.4 -1.7
8 49.6 -3.6 -2.1 45.2 6.5 1.9
Critical Combination:6 - (G+Q-Nx)
Min Design
N (kN) 52.8 - 52.8
M1 (kN.m) 8.3 0.6 8.8 225
M2 (kN.m) -0.3 -0.6 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.035 Le1/b1 = 8.6 < 15.0 225
Beta = 0.96 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.6 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.86 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.11 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-25

1C34 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 93.6 2.9 -0.3 88.5 -6.6 -0.1
2 65.8 2.0 -0.2 62.1 -4.6 -0.1
3 86.9 2.9 -0.4 81.8 -6.7 0.1
4 64.9 1.8 -0.1 59.8 -4.1 -0.3
5 79.9 4.3 -0.2 75.5 -7.4 -0.1
6 77.9 0.5 -0.2 73.6 -3.8 -0.1
7 81.7 2.5 1.7 77.3 -5.6 -1.9
8 76.1 2.4 -2.1 71.8 -5.5 1.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 93.6 - 93.6
M1 (kN.m) -6.6 -1.1 -7.6 225
M2 (kN.m) -0.3 -1.1 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.062 Le1/b1 = 8.6 < 15.0 225
Beta = 0.93 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.9 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.88 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.09 / 0.00 N/mm2
Links = Y8-175

2C35 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 0.0 0.0 0.0 -5.1 -7.3 -0.9
2 0.0 0.0 0.0 -3.6 -5.2 -0.6
3 0.0 0.0 0.0 -5.1 -7.9 -0.6
4 0.0 0.0 0.0 -5.1 -5.3 -0.7
5 0.0 0.0 0.0 -4.4 -6.5 -0.8
6 0.0 0.0 0.0 -4.4 -6.1 -0.7
7 0.0 0.0 0.0 -4.4 -6.4 -1.1
8 0.0 0.0 0.0 -4.4 -6.2 -0.4
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) -5.1 - -5.1
M1 (kN.m) -7.9 0.1 -8.5 225
M2 (kN.m) -0.6 0.1 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = -0.003 Le1/b1 = 8.7 < 15.0 225
Beta = 1.00 Le2/b2 = 8.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.6 / 0.4 kN As (Required): %0.52 260.78 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-26

2C36 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 44.6 -0.1 0.1 39.5 -2.9 4.4
2 31.8 -0.1 0.1 28.2 -2.1 3.1
3 40.8 -0.1 0.5 35.6 -4.0 4.0
4 38.6 -0.1 -0.7 33.5 -1.5 3.7
5 38.0 0.0 0.1 33.6 -2.8 3.7
6 38.4 -0.1 0.1 34.0 -2.2 3.8
7 38.4 -0.1 0.4 34.0 -2.6 3.8
8 38.0 -0.1 -0.2 33.6 -2.4 3.7
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 40.8 - 40.8
M1 (kN.m) -4.0 -0.5 0.0 225
M2 (kN.m) 4.0 0.5 7.8
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.027 Le1/b1 = 8.7 < 15.0 225
Beta = 0.97 Le2/b2 = 9.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.3 / 1.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.03 / 0.03 N/mm2
Links = Y8-175

2C37 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 23.4 -0.1 -0.9 18.3 -0.9 0.2
2 16.7 0.0 -0.6 13.1 -0.6 0.1
3 18.6 -0.1 -0.7 13.5 0.3 0.0
4 22.7 0.0 -0.9 17.6 -1.6 0.3
5 20.1 0.0 -0.7 15.7 -1.2 0.2
6 20.0 -0.1 -0.8 15.7 -0.4 0.2
7 20.4 -0.1 -0.3 16.0 -0.8 -0.3
8 19.8 -0.1 -1.2 15.4 -0.8 0.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 23.4 - 23.4
M1 (kN.m) -0.9 -0.3 -1.7 225
M2 (kN.m) -0.9 -0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.015 Le1/b1 = 8.9 < 15.0 225
Beta = 0.98 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.80 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-27

2C38 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 22.5 2.5 0.2 17.4 -4.2 -1.9
2 16.1 1.8 0.2 12.4 -3.0 -1.3
3 22.5 2.9 0.2 17.4 -4.4 -1.6
4 17.5 1.0 0.2 12.4 -2.6 -1.5
5 19.4 2.5 0.2 15.1 -4.1 -1.5
6 19.2 1.7 0.2 14.8 -3.2 -1.7
7 19.3 2.0 0.2 15.0 -3.5 -1.9
8 19.3 2.2 0.2 14.9 -3.7 -1.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 22.5 - 22.5
M1 (kN.m) -4.2 -0.3 -6.1 225
M2 (kN.m) -1.9 -0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.015 Le1/b1 = 8.9 < 15.0 225
Beta = 0.98 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.4 / 0.7 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.02 N/mm2
Links = Y8-175

2C39 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 0.0 0.0 0.0 -5.1 0.0 0.0
2 0.0 0.0 0.0 -3.6 0.0 0.0
3 0.0 0.0 0.0 -5.1 0.0 0.0
4 0.0 0.0 0.0 -5.1 0.0 0.0
5 0.0 0.0 0.0 -4.4 0.0 0.0
6 0.0 0.0 0.0 -4.4 0.0 0.0
7 0.0 0.0 0.0 -4.4 0.0 0.0
8 0.0 0.0 0.0 -4.4 0.0 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) -5.1 - -5.1
M1 (kN.m) 0.0 -0.1 0.0 225
M2 (kN.m) 0.0 0.1 0.1
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = -0.003 Le1/b1 = 8.7 < 15.0 225
Beta = 1.00 Le2/b2 = 8.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.73 / 0.73 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-28

2C40 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 27.0 -1.8 0.0 21.9 2.4 1.0
2 19.3 -1.3 0.0 15.7 1.7 0.7
3 27.0 -0.9 0.0 21.9 2.1 1.1
4 20.7 -1.9 0.0 15.6 2.0 0.6
5 23.0 -1.2 0.0 18.7 1.7 0.9
6 23.3 -1.8 0.0 18.9 2.4 0.8
7 23.3 -1.5 0.0 18.9 2.1 0.4
8 23.1 -1.5 -0.1 18.7 2.1 1.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 27.0 - 27.0
M1 (kN.m) 2.4 0.3 3.4 225
M2 (kN.m) 1.0 0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.018 Le1/b1 = 8.8 < 15.0 225
Beta = 0.98 Le2/b2 = 8.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.4 / 0.4 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.03 / 0.01 N/mm2
Links = Y8-175

2C41 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 33.1 -6.5 0.2 28.0 6.2 -3.6
2 23.6 -4.6 0.1 20.0 4.4 -2.5
3 32.9 -4.2 0.2 27.7 5.4 -3.5
4 25.3 -6.4 0.2 20.2 5.1 -2.7
5 28.2 -5.0 0.2 23.8 4.9 -3.0
6 28.5 -5.9 0.2 24.2 5.8 -3.1
7 28.6 -5.5 0.2 24.2 5.3 -3.5
8 28.1 -5.5 0.2 23.8 5.3 -2.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 33.1 - 33.1
M1 (kN.m) -6.5 -0.4 -9.9 225
M2 (kN.m) -3.6 -0.4 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.022 Le1/b1 = 8.9 < 15.0 225
Beta = 0.97 Le2/b2 = 8.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.2 / 1.2 kN As (Required): %0.40 204.46 mm2 4Y16
vc'(1/2)= 0.84 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.10 / 0.03 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-29

2C42 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 25.2 -0.2 -0.1 20.1 0.6 4.9
2 18.0 -0.1 -0.1 14.3 0.4 3.5
3 26.0 -0.1 -0.1 20.9 0.6 5.1
4 18.6 0.0 -0.1 13.5 0.3 3.5
5 21.2 0.3 -0.1 16.8 0.1 4.1
6 22.0 -0.5 -0.1 17.6 0.9 4.2
7 21.4 -0.1 -0.1 17.0 0.5 3.8
8 21.8 -0.1 -0.1 17.4 0.5 4.5
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 26.0 - 26.0
M1 (kN.m) 0.6 0.3 0.0 225
M2 (kN.m) 5.1 0.3 5.7
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.017 Le1/b1 = 8.7 < 15.0 225
Beta = 0.98 Le2/b2 = 8.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 1.7 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.04 N/mm2
Links = Y8-175

2C43 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 21.8 -0.1 2.5 16.7 2.2 4.3
2 15.6 -0.1 1.8 12.0 1.5 3.1
3 21.6 -0.1 2.7 16.5 2.2 3.8
4 17.4 -0.1 1.7 12.3 1.4 3.8
5 18.5 -0.1 2.1 14.1 1.5 3.8
6 19.0 -0.1 2.2 14.6 2.2 3.6
7 18.5 -0.1 2.5 14.2 1.8 3.4
8 18.9 -0.1 1.8 14.5 1.8 4.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 21.8 - 21.8
M1 (kN.m) 2.2 0.2 0.0 225
M2 (kN.m) 4.3 0.2 6.4
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.014 Le1/b1 = 8.8 < 15.0 225
Beta = 0.98 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 0.7 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.80 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.02 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-30

2C44 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 29.6 0.1 -2.1 24.5 -0.9 18.7
2 21.1 0.0 -1.5 17.5 -0.6 13.4
3 29.0 0.0 -2.0 23.9 -0.8 17.9
4 23.5 0.0 -1.6 18.4 -0.7 14.7
5 25.6 0.1 -1.8 21.2 -1.1 15.9
6 25.2 0.0 -1.9 20.8 -0.4 16.2
7 25.2 0.0 -1.5 20.8 -0.7 15.8
8 25.5 0.0 -2.2 21.2 -0.8 16.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 29.6 - 29.6
M1 (kN.m) -0.9 -0.3 0.0 225
M2 (kN.m) 18.7 0.3 19.6
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.[Link] Short Column...
N/bhFcu = 0.019 Le1/b1 = 8.8 < 15.0 225
Beta = 0.98 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 7.0 kN As (Required): %1.11 563.62 mm2 4Y16
vc'(1/2)= 0.81 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.16 N/mm2
Links = Y8-175