COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-1

1C1 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 65.7 -0.6 1.4 60.6 1.2 -3.1
2 46.7 -0.4 1.0 43.1 0.8 -2.2
3 50.5 -0.5 0.8 45.4 1.1 -1.9
4 62.3 -0.5 1.6 57.2 0.9 -3.3
5 53.6 1.5 1.3 49.2 -0.9 -2.6
6 58.6 -2.4 1.2 54.2 2.9 -2.6
7 57.1 -0.5 3.0 52.7 1.1 -4.3
8 55.1 -0.4 -0.6 50.7 0.9 -0.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 65.7 - 65.7
M1 (kN.m) 1.2 0.7 0.0 225
M2 (kN.m) -3.1 -0.7 -4.2
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.043 Le1/b1 = 8.5 < 15.0 225
Beta = 0.95 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.8 / 2.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.86 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.06 N/mm2
Links = Y8-175

1C2 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 173.5 -1.1 0.8 168.4 2.3 -1.8
2 123.0 -0.8 0.5 119.3 1.6 -1.2
3 161.8 -1.1 0.9 156.7 2.4 -2.1
4 132.4 -0.7 0.2 127.3 1.5 -0.5
5 149.3 1.0 0.7 145.0 0.0 -1.5
6 145.8 -3.0 0.6 141.5 3.9 -1.5
7 148.9 -1.0 2.4 144.6 2.0 -3.2
8 146.3 -0.9 -1.2 141.9 1.9 0.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 173.5 - 173.5
M1 (kN.m) 2.3 2.0 4.0 225
M2 (kN.m) -1.8 -2.0 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.114 Le1/b1 = 8.5 < 15.0 225
Beta = 0.86 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.3 / 0.6 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.90 / 0.92 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-2

1C3 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 97.7 -0.3 -0.7 92.6 0.7 0.8
2 69.6 -0.2 -0.5 65.9 0.5 0.6
3 83.2 -0.3 -0.7 78.1 0.6 0.8
4 85.0 -0.3 -0.5 79.9 0.5 0.6
5 83.4 1.7 -0.6 79.1 -1.4 0.7
6 83.5 -2.3 -0.6 79.1 2.6 0.7
7 85.7 -0.3 1.3 81.3 0.6 -1.1
8 81.2 -0.2 -2.5 76.9 0.5 2.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 97.7 - 97.7
M1 (kN.m) 0.7 1.1 0.0 225
M2 (kN.m) 0.8 1.1 2.1
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.064 Le1/b1 = 8.5 < 15.0 225
Beta = 0.92 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 1.6 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.91 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.04 N/mm2
Links = Y8-175

1C4 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 111.7 0.2 -0.9 106.6 -0.7 1.7
2 79.6 0.2 -0.6 75.9 -0.5 1.2
3 96.1 0.2 -0.5 91.0 -0.7 0.9
4 96.9 0.2 -1.0 91.8 -0.6 1.9
5 92.1 2.1 -0.7 87.7 -2.4 1.4
6 98.9 -1.7 -0.8 94.5 1.2 1.4
7 95.1 0.2 1.1 90.8 -0.6 -0.5
8 95.8 0.2 -2.7 91.4 -0.6 3.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 111.7 - 111.7
M1 (kN.m) -0.7 -1.3 0.0 225
M2 (kN.m) 1.7 1.3 2.8
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.074 Le1/b1 = 8.5 < 15.0 225
Beta = 0.91 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 0.6 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.88 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-3

1C5 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 119.8 0.5 -2.8 114.7 -1.2 5.3
2 85.0 0.3 -2.0 81.3 -0.9 3.7
3 103.5 0.6 -2.9 98.4 -1.3 5.4
4 100.1 0.2 -1.7 95.0 -0.7 3.2
5 100.4 2.4 -2.4 96.0 -3.0 4.4
6 103.6 -1.6 -2.4 99.2 0.9 4.4
7 101.2 0.4 -0.6 96.9 -1.0 2.7
8 102.7 0.4 -4.3 98.3 -1.1 6.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 119.8 - 119.8
M1 (kN.m) -1.2 -1.3 0.0 225
M2 (kN.m) 5.3 1.3 6.5
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.079 Le1/b1 = 8.5 < 15.0 225
Beta = 0.91 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 3.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.88 / 0.92 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.08 N/mm2
Links = Y8-175

2C5 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 19.8 -0.2 -3.6 14.6 0.9 0.0
2 14.0 -0.2 -2.6 10.4 0.6 0.0
3 18.0 -0.1 -3.6 12.9 1.0 0.0
4 16.8 -0.3 -2.3 11.7 0.5 0.0
5 16.5 0.5 -3.0 12.2 0.1 0.0
6 17.2 -0.8 -3.1 12.8 1.4 0.0
7 16.7 -0.2 -2.8 12.4 0.7 0.0
8 17.0 -0.2 -3.3 12.6 0.8 0.0
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 18.0 - 18.0
M1 (kN.m) 1.0 0.2 0.0 225
M2 (kN.m) -3.6 -0.2 -4.6
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.012 Le1/b1 = 8.5 < 15.0 225
Beta = 0.99 Le2/b2 = 9.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 1.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.03 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-4

1C6 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 117.3 -2.4 -0.4 112.2 4.7 0.2
2 83.1 -1.7 -0.3 79.5 3.3 0.1
3 111.2 -2.4 -0.3 106.1 4.8 0.0
4 87.3 -1.5 -0.3 82.2 2.9 0.2
5 99.1 -0.1 -0.3 94.7 2.2 0.1
6 100.5 -3.9 -0.3 96.1 5.8 0.2
7 99.2 -2.0 1.6 94.8 4.0 -1.8
8 100.3 -2.0 -2.2 96.0 4.0 2.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 117.3 - 117.3
M1 (kN.m) 4.7 1.3 5.9 225
M2 (kN.m) -0.4 -1.3 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.077 Le1/b1 = 8.7 < 15.0 225
Beta = 0.91 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.2 / 0.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.92 / 0.88 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.08 / 0.00 N/mm2
Links = Y8-175

2C6 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 34.5 -8.1 -0.2 29.4 7.3 0.3
2 24.6 -5.7 -0.2 21.0 5.2 0.2
3 31.4 -8.1 0.0 26.3 7.2 0.1
4 29.2 -5.5 -0.4 24.1 5.3 0.4
5 29.3 -6.4 -0.1 25.0 5.8 0.2
6 29.8 -7.3 -0.2 25.4 6.7 0.3
7 29.8 -6.8 0.5 25.4 6.2 -0.4
8 29.3 -7.0 -0.9 24.9 6.3 0.9
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 31.4 - 31.4
M1 (kN.m) -8.1 -0.4 -8.4 225
M2 (kN.m) 0.1 0.4 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.021 Le1/b1 = 8.9 < 15.0 225
Beta = 0.98 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.1 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.84 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.12 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-5

1C7 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 168.6 -2.5 1.0 163.5 4.8 -2.2
2 119.7 -1.8 0.7 116.0 3.3 -1.5
3 135.1 -1.3 0.5 130.0 2.3 -1.1
4 151.0 -2.8 1.1 145.9 5.3 -2.4
5 142.2 -0.3 0.9 137.8 2.3 -1.9
6 145.0 -4.0 0.8 140.7 5.8 -1.8
7 143.5 -2.1 2.7 139.1 4.0 -3.7
8 143.8 -2.1 -1.0 139.4 4.0 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 168.6 - 168.6
M1 (kN.m) 4.8 1.9 6.6 225
M2 (kN.m) -2.2 -1.9 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.111 Le1/b1 = 8.5 < 15.0 225
Beta = 0.87 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.7 / 0.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.93 / 0.90 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.01 N/mm2
Links = Y8-175

1C8 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 175.7 2.6 0.0 170.6 -5.7 -0.5
2 124.4 1.9 0.0 120.8 -4.0 -0.4
3 146.6 1.4 0.2 141.5 -3.2 -0.8
4 149.1 2.9 -0.2 144.0 -6.1 0.0
5 149.7 4.1 0.0 145.4 -6.6 -0.4
6 148.9 0.4 0.0 144.5 -3.1 -0.4
7 150.7 2.2 1.9 146.3 -4.8 -2.3
8 148.0 2.2 -1.9 143.6 -4.8 1.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 175.7 - 175.7
M1 (kN.m) -5.7 -2.0 -7.4 225
M2 (kN.m) -0.5 -2.0 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.116 Le1/b1 = 8.7 < 15.0 225
Beta = 0.86 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.0 / 0.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.93 / 0.89 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.05 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-6

2C8 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 30.9 5.4 2.7 25.7 -3.5 -2.4
2 22.1 3.9 1.9 18.4 -2.5 -1.7
3 29.0 3.5 2.7 23.9 -3.2 -2.4
4 25.5 5.4 1.8 20.4 -2.7 -1.8
5 26.4 5.2 2.3 22.0 -3.6 -2.1
6 26.5 4.0 2.3 22.2 -2.3 -2.1
7 27.0 4.6 2.9 22.6 -2.9 -2.7
8 26.0 4.6 1.7 21.6 -3.0 -1.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 30.9 - 30.9
M1 (kN.m) 5.4 0.3 8.1 225
M2 (kN.m) 2.7 0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.020 Le1/b1 = 8.7 < 15.0 225
Beta = 0.98 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.9 / 1.9 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.83 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.07 / 0.04 N/mm2
Links = Y8-175

1C9 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 131.6 5.4 0.2 126.5 -11.1 -1.4
2 93.3 3.8 0.2 89.6 -7.9 -1.0
3 129.3 5.4 0.2 124.2 -11.2 -1.5
4 93.7 3.4 0.2 88.6 -7.1 -0.9
5 112.9 6.4 0.2 108.5 -11.1 -1.2
6 111.0 2.7 0.2 106.6 -7.8 -1.2
7 112.4 4.5 2.1 108.0 -9.3 -3.0
8 111.5 4.7 -1.7 107.1 -9.6 0.5
Critical Combination:5 - (G+Q+Nx)
Min Design
N (kN) 112.9 - 112.9
M1 (kN.m) -11.1 -1.3 -12.3 225
M2 (kN.m) -1.2 -1.3 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.074 Le1/b1 = 8.7 < 15.0 225
Beta = 0.91 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.8 / 0.4 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.92 / 0.87 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.14 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-7

2C9 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 28.8 11.5 3.0 23.7 -7.6 -2.7
2 20.6 8.1 2.1 17.0 -5.4 -1.9
3 25.8 10.9 3.1 20.7 -6.3 -2.7
4 25.1 8.0 2.0 20.0 -6.5 -1.9
5 24.9 10.1 2.5 20.6 -6.9 -2.3
6 24.5 9.4 2.6 20.1 -6.1 -2.3
7 24.8 9.6 2.9 20.4 -6.4 -2.7
8 24.6 9.9 2.2 20.3 -6.6 -1.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 28.8 - 28.8
M1 (kN.m) 11.5 0.3 14.4 225
M2 (kN.m) 3.0 0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.019 Le1/b1 = 9.0 < 15.0 225
Beta = 0.98 Le2/b2 = 8.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 6.4 / 1.9 kN As (Required): %0.74 376.23 mm2 4Y16
vc'(1/2)= 0.83 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.15 / 0.04 N/mm2
Links = Y8-175

1C10 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 92.4 -0.3 -2.3 87.3 -0.1 4.2
2 65.3 -0.2 -1.6 61.6 -0.1 3.0
3 91.8 -0.4 -2.3 86.7 0.1 4.1
4 63.9 -0.1 -1.5 58.8 -0.2 2.8
5 81.7 1.7 -1.9 77.3 -1.9 3.5
6 75.0 -2.1 -2.0 70.6 1.7 3.6
7 76.9 -0.2 -0.1 72.6 -0.1 1.8
8 79.8 -0.3 -3.8 75.4 0.0 5.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 92.4 - 92.4
M1 (kN.m) -0.3 -1.0 0.0 225
M2 (kN.m) 4.2 1.0 5.1
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.061 Le1/b1 = 8.6 < 15.0 225
Beta = 0.93 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 3.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.89 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.07 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-8

2C10 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 16.2 0.4 -3.1 11.1 -0.2 2.1
2 11.5 0.3 -2.2 7.9 -0.2 1.5
3 15.9 0.2 -3.2 10.8 0.0 2.2
4 13.2 0.5 -1.8 8.1 -0.4 1.3
5 14.6 0.8 -2.6 10.2 -0.7 1.7
6 13.1 -0.2 -2.7 8.8 0.3 1.8
7 13.6 0.4 -2.1 9.2 -0.3 1.2
8 14.1 0.3 -3.1 9.7 -0.1 2.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 16.2 - 16.2
M1 (kN.m) 0.4 0.2 0.0 225
M2 (kN.m) -3.1 -0.2 -3.5
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.011 Le1/b1 = 8.6 < 15.0 225
Beta = 0.99 Le2/b2 = 8.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 1.8 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.04 N/mm2
Links = Y8-175

1C11 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 158.9 -1.1 -1.3 153.8 1.6 2.4
2 112.6 -0.8 -0.9 109.0 1.1 1.7
3 125.6 -0.6 -0.8 120.5 0.6 1.4
4 143.1 -1.1 -1.3 138.0 1.9 2.5
5 134.2 0.9 -1.1 129.8 -0.3 2.0
6 136.2 -2.8 -1.1 131.8 3.1 2.0
7 137.1 -0.9 0.8 132.7 1.3 0.2
8 133.2 -1.0 -3.0 128.9 1.4 3.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 158.9 - 158.9
M1 (kN.m) 1.6 1.8 0.0 225
M2 (kN.m) 2.4 1.8 4.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.105 Le1/b1 = 8.5 < 15.0 225
Beta = 0.87 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.6 / 0.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.93 / 0.88 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-9

1C12 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 98.8 -0.8 0.6 93.7 1.0 -1.6
2 69.9 -0.6 0.4 66.2 0.7 -1.2
3 80.6 -0.9 0.3 75.5 1.2 -0.9
4 85.9 -0.4 0.8 80.8 0.5 -1.8
5 80.8 1.2 0.6 76.4 -0.9 -1.5
6 87.0 -2.6 0.5 82.6 2.7 -1.3
7 85.9 -0.6 2.4 81.5 0.8 -3.1
8 81.9 -0.7 -1.3 77.5 0.9 0.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 98.8 - 98.8
M1 (kN.m) 1.0 1.1 0.0 225
M2 (kN.m) -1.6 -1.1 -2.7
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.065 Le1/b1 = 8.6 < 15.0 225
Beta = 0.92 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 0.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.88 / 0.86 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-175

2C12 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 20.5 -0.9 3.2 15.4 0.7 -2.7
2 14.6 -0.6 2.3 11.0 0.5 -1.9
3 19.0 -1.1 2.3 13.9 0.9 -2.1
4 17.5 -0.4 3.2 12.4 0.2 -2.5
5 17.0 -0.2 2.8 12.6 0.0 -2.4
6 18.1 -1.2 2.6 13.7 1.1 -2.2
7 17.9 -0.7 3.3 13.5 0.5 -2.9
8 17.2 -0.8 2.2 12.8 0.6 -1.8
Critical Combination:7 - (G+Q+Ny)
Min Design
N (kN) 17.9 - 17.9
M1 (kN.m) -0.7 -0.2 0.0 225
M2 (kN.m) 3.3 0.2 3.9
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.012 Le1/b1 = 8.6 < 15.0 225
Beta = 0.99 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 2.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.05 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-10

1C13 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 44.1 -1.4 -1.0 39.0 2.0 1.9
2 31.4 -1.0 -0.7 27.7 1.4 1.4
3 45.4 -1.4 -1.0 40.3 2.0 1.9
4 31.9 -1.0 -0.7 26.8 1.4 1.3
5 35.4 0.7 -0.9 31.0 0.0 1.6
6 39.9 -3.1 -0.9 35.5 3.5 1.6
7 35.1 -1.1 0.9 30.8 1.7 -0.1
8 40.1 -1.3 -2.7 35.8 1.8 3.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 44.1 - 44.1
M1 (kN.m) 2.0 0.5 3.9 225
M2 (kN.m) 1.9 0.5 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.029 Le1/b1 = 8.6 < 15.0 225
Beta = 0.97 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.2 / 2.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.85 / 0.84 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.05 / 0.05 N/mm2
Links = Y8-175

2C13 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 1.8 -2.3 -0.3 -3.3 0.4 0.2
2 1.3 -1.6 -0.2 -2.4 0.2 0.1
3 2.9 -2.4 -0.4 -2.2 0.6 0.2
4 1.1 -1.5 -0.1 -4.0 -0.1 0.0
5 1.0 -1.4 -0.3 -3.4 -0.3 0.2
6 2.0 -2.5 -0.2 -2.4 0.9 0.1
7 1.0 -2.0 0.3 -3.4 0.3 -0.4
8 2.0 -1.9 -0.8 -2.3 0.3 0.7
Critical Combination:8 - (G+Q-Ny)
Min Design
N (kN) -2.3 - -2.3
M1 (kN.m) -1.9 0.0 -2.7 225
M2 (kN.m) -0.8 0.0 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = -0.002 Le1/b1 = 8.7 < 15.0 225
Beta = 1.00 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 0.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.75 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-11

1C14 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 99.8 -0.6 -0.5 94.7 0.3 0.6
2 71.1 -0.4 -0.3 67.5 0.2 0.4
3 93.5 -0.5 -0.4 88.4 0.2 0.5
4 79.7 -0.4 -0.3 74.6 0.2 0.4
5 86.8 1.5 -0.4 82.4 -1.7 0.5
6 83.8 -2.4 -0.4 79.4 2.1 0.5
7 82.7 -0.4 1.4 78.3 0.2 -1.2
8 88.0 -0.5 -2.2 83.6 0.3 2.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 99.8 - 99.8
M1 (kN.m) -0.6 -1.1 0.0 225
M2 (kN.m) 0.6 1.1 2.2
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.066 Le1/b1 = 8.5 < 15.0 225
Beta = 0.92 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 0.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.89 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.01 N/mm2
Links = Y8-175

2C14 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 53.3 -6.5 0.6 48.2 11.4 -0.8
2 38.1 -4.6 0.4 34.4 8.2 -0.6
3 48.7 -6.1 0.5 43.6 10.7 -0.7
4 45.1 -5.1 0.6 40.0 9.2 -0.8
5 46.3 -4.8 0.5 41.9 9.0 -0.7
6 45.2 -6.3 0.5 40.8 10.5 -0.7
7 45.3 -5.6 1.0 41.0 9.9 -1.2
8 46.1 -5.4 0.0 41.7 9.7 -0.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 53.3 - 53.3
M1 (kN.m) 11.4 0.6 12.2 225
M2 (kN.m) -0.8 -0.6 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.035 Le1/b1 = 8.5 < 15.0 225
Beta = 0.96 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 6.0 / 0.1 kN As (Required): %0.45 227.46 mm2 4Y16
vc'(1/2)= 0.85 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.14 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-12

1C15 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 136.2 -2.9 1.1 131.1 5.0 -2.7
2 96.7 -2.1 0.8 93.1 3.5 -2.0
3 129.5 -2.9 1.2 124.4 5.0 -2.9
4 103.5 -1.9 0.8 98.4 3.2 -2.0
5 115.0 -0.6 1.0 110.7 2.4 -2.3
6 117.1 -4.4 1.0 112.7 6.0 -2.4
7 112.8 -2.4 2.8 108.5 4.2 -4.1
8 119.3 -2.5 -0.9 114.9 4.3 -0.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 136.2 - 136.2
M1 (kN.m) 5.0 1.5 7.4 225
M2 (kN.m) -2.7 -1.5 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.090 Le1/b1 = 8.6 < 15.0 225
Beta = 0.89 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.5 / 0.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.94 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.08 / 0.00 N/mm2
Links = Y8-175

1C16 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 172.2 1.0 1.1 167.1 -3.0 -2.8
2 122.2 0.7 0.8 118.6 -2.1 -2.0
3 165.8 1.0 1.1 160.7 -2.9 -2.9
4 127.6 0.7 0.9 122.5 -1.9 -2.2
5 148.0 2.7 0.9 143.6 -4.3 -2.4
6 145.4 -1.0 0.9 141.1 -0.7 -2.4
7 143.7 0.9 2.8 139.3 -2.6 -4.2
8 149.7 0.8 -1.0 145.4 -2.4 -0.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 172.2 - 172.2
M1 (kN.m) -3.0 -1.9 -5.4 225
M2 (kN.m) -2.8 -1.9 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.113 Le1/b1 = 8.6 < 15.0 225
Beta = 0.87 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 0.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.83 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-13

1C17 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 217.4 0.4 0.3 212.3 -1.3 -1.2
2 153.5 0.3 0.2 149.9 -0.9 -0.8
3 197.4 0.4 0.8 192.3 -1.4 -2.3
4 164.4 0.2 -0.5 159.3 -0.7 0.6
5 184.3 2.2 0.3 179.9 -2.9 -1.0
6 184.1 -1.6 0.2 179.8 0.7 -0.9
7 183.7 0.3 2.1 179.3 -1.1 -2.7
8 184.7 0.3 -1.7 180.3 -1.0 0.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 217.4 - 217.4
M1 (kN.m) -1.3 -2.4 0.0 225
M2 (kN.m) -1.2 -2.4 -4.5
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.143 Le1/b1 = 8.6 < 15.0 225
Beta = 0.83 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 0.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.94 / 0.93 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-175

2C17 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 35.5 0.1 6.1 30.4 0.0 -8.2
2 25.4 0.1 4.3 21.7 0.0 -5.8
3 33.3 0.3 6.8 28.2 0.0 -8.3
4 29.4 -0.1 3.5 24.3 0.0 -5.7
5 30.4 0.4 5.3 26.1 0.0 -7.0
6 30.5 -0.2 5.1 26.1 0.0 -6.9
7 30.3 0.1 5.8 25.9 0.0 -7.6
8 30.6 0.1 4.6 26.2 0.0 -6.3
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 33.3 - 33.3
M1 (kN.m) 0.3 0.4 0.0 225
M2 (kN.m) -8.3 -0.4 -8.7
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.022 Le1/b1 = 9.6 < 15.0 225
Beta = 0.97 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 5.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.12 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-14

1C18 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 122.2 -0.2 -0.8 117.1 -0.3 0.6
2 86.3 -0.1 -0.5 82.6 -0.2 0.4
3 102.4 -0.2 -0.5 97.3 -0.3 0.1
4 102.0 -0.1 -0.7 96.9 -0.2 0.9
5 103.6 1.1 -0.7 99.2 -0.7 0.5
6 103.5 -1.4 -0.6 99.1 0.3 0.5
7 104.1 -0.1 1.3 99.8 -0.3 -1.4
8 102.9 -0.2 -2.6 98.6 -0.2 2.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 122.2 - 122.2
M1 (kN.m) -0.3 -1.4 0.0 225
M2 (kN.m) -0.8 -1.4 -2.6
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.080 Le1/b1 = 10.3 < 15.0 225
Beta = 0.90 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.88 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.01 N/mm2
Links = Y8-175

2C18 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 20.5 -0.2 0.2 15.4 0.0 -0.2
2 14.7 -0.1 0.2 11.0 0.0 -0.1
3 18.5 -0.2 0.9 13.3 0.0 -0.6
4 18.3 -0.1 -0.4 13.2 0.0 0.2
5 17.6 -0.7 0.2 13.2 0.0 -0.1
6 17.6 0.3 0.2 13.2 0.0 -0.2
7 17.7 -0.2 0.8 13.3 0.0 -0.8
8 17.5 -0.2 -0.4 13.2 0.0 0.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 20.5 - 20.5
M1 (kN.m) -0.2 -0.2 0.0 225
M2 (kN.m) 0.2 0.2 0.5
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.014 Le1/b1 = 9.8 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.2 / 0.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-15

1C21 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 123.0 1.5 3.6 117.9 -3.2 -8.2
2 87.4 1.1 2.6 83.7 -2.3 -5.8
3 118.0 1.7 3.6 112.9 -3.5 -8.1
4 91.9 0.7 2.4 86.8 -1.6 -5.3
5 106.2 3.2 3.0 101.8 -4.5 -6.8
6 103.5 -0.6 3.1 99.1 -0.9 -7.1
7 105.1 1.2 4.9 100.7 -2.6 -8.7
8 104.5 1.4 1.2 100.2 -2.9 -5.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 123.0 - 123.0
M1 (kN.m) -3.2 -1.4 0.0 225
M2 (kN.m) -8.2 -1.4 -11.1
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.081 Le1/b1 = 8.5 < 15.0 225
Beta = 0.90 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 4.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.91 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.11 N/mm2
Links = Y8-175

1C22 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 165.8 3.5 -1.2 160.7 -7.5 1.5
2 117.3 2.4 -0.9 113.7 -5.2 1.1
3 151.1 3.5 -1.6 146.0 -7.5 2.1
4 127.1 2.1 -0.5 122.0 -4.5 0.5
5 141.9 4.8 -1.1 137.6 -8.0 1.3
6 139.7 1.0 -1.0 135.3 -4.5 1.3
7 140.3 2.9 0.9 135.9 -6.3 -0.6
8 141.3 2.9 -3.0 136.9 -6.3 3.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 165.8 - 165.8
M1 (kN.m) -7.5 -1.9 -9.1 225
M2 (kN.m) 1.5 1.9 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.109 Le1/b1 = 8.7 < 15.0 225
Beta = 0.87 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.3 / 0.7 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.96 / 0.95 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.10 / 0.02 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-16

2C22 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 27.5 5.0 -1.3 22.4 -0.1 1.5
2 19.6 3.5 -0.9 16.0 0.0 1.1
3 25.4 5.2 -2.0 20.3 -0.1 2.0
4 23.3 2.8 -0.2 18.2 0.0 0.5
5 23.6 4.6 -1.2 19.2 -0.1 1.3
6 23.5 3.9 -1.1 19.2 0.0 1.2
7 23.5 4.2 -0.5 19.2 -0.1 0.7
8 23.6 4.2 -1.7 19.2 -0.1 1.9
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 25.4 - 25.4
M1 (kN.m) 5.2 0.3 7.2 225
M2 (kN.m) 2.0 0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.017 Le1/b1 = 9.7 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.8 / 1.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.03 N/mm2
Links = Y8-175

1C23 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 70.7 0.9 0.8 65.6 -1.8 -2.5
2 50.4 0.6 0.6 46.7 -1.3 -1.7
3 70.5 0.9 0.8 65.3 -1.7 -2.4
4 52.3 0.6 0.5 47.2 -1.3 -1.6
5 62.0 2.7 0.7 57.6 -3.3 -2.0
6 58.8 -1.1 0.7 54.5 0.3 -2.1
7 61.9 0.7 2.6 57.6 -1.5 -3.8
8 58.9 0.8 -1.2 54.5 -1.6 -0.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 70.7 - 70.7
M1 (kN.m) -1.8 -0.8 0.0 225
M2 (kN.m) -2.5 -0.8 -4.1
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.047 Le1/b1 = 8.6 < 15.0 225
Beta = 0.94 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.0 / 2.1 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.87 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.05 / 0.05 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-17

2C23 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 19.3 0.2 4.1 14.2 -0.5 -4.3
2 13.8 0.1 2.9 10.2 -0.3 -3.1
3 19.3 0.1 4.1 14.2 -0.4 -4.2
4 15.3 0.1 2.8 10.2 -0.3 -3.2
5 16.8 0.7 3.4 12.4 -0.9 -3.7
6 16.4 -0.4 3.5 12.0 0.1 -3.7
7 16.8 0.2 3.9 12.5 -0.4 -4.1
8 16.3 0.1 3.1 11.9 -0.4 -3.2
Critical Combination:5 - (G+Q+Nx)
Min Design
N (kN) 16.8 - 16.8
M1 (kN.m) -0.9 -0.2 0.0 225
M2 (kN.m) -3.7 -0.2 -4.6
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.011 Le1/b1 = 8.7 < 15.0 225
Beta = 0.99 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 2.8 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.07 N/mm2
Links = Y8-175

1C24 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 68.2 -2.0 -0.5 63.1 3.3 0.9
2 48.6 -1.4 -0.4 44.9 2.3 0.7
3 71.8 -2.0 -0.5 66.7 3.2 0.8
4 47.0 -1.4 -0.4 41.9 2.3 0.8
5 56.0 0.2 -0.4 51.6 1.0 0.8
6 60.6 -3.6 -0.5 56.2 4.6 0.8
7 57.5 -1.7 1.4 53.1 2.8 -0.9
8 59.1 -1.7 -2.3 54.7 2.8 2.5
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 68.2 - 68.2
M1 (kN.m) 3.3 0.8 4.2 225
M2 (kN.m) 0.9 0.8 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.045 Le1/b1 = 8.6 < 15.0 225
Beta = 0.95 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.7 / 0.4 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.84 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-18

2C24 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 19.9 -4.5 0.7 14.8 3.8 0.0
2 14.2 -3.2 0.5 10.6 2.7 0.0
3 19.7 -4.4 0.8 14.6 3.7 -0.1
4 15.8 -3.2 0.4 10.7 2.8 0.0
5 16.6 -3.3 0.5 12.2 2.7 0.0
6 17.5 -4.4 0.6 13.1 3.8 -0.1
7 17.1 -4.0 1.2 12.7 3.4 -0.6
8 17.0 -3.7 0.0 12.6 3.1 0.6
Critical Combination:7 - (G+Q+Ny)
Min Design
N (kN) 17.1 - 17.1
M1 (kN.m) -4.0 -0.2 -5.2 225
M2 (kN.m) 1.2 0.2 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.011 Le1/b1 = 8.7 < 15.0 225
Beta = 0.99 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.7 / 0.6 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.01 N/mm2
Links = Y8-175

1C25 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 123.7 0.3 -0.8 118.6 -1.3 1.2
2 87.7 0.2 -0.5 84.0 -1.0 0.8
3 105.0 0.3 -0.6 99.9 -1.5 0.8
4 104.9 0.1 -0.7 99.8 -0.8 1.2
5 107.3 2.1 -0.6 102.9 -2.9 1.0
6 103.2 -1.6 -0.7 98.8 0.6 1.0
7 106.7 0.3 1.3 102.3 -1.2 -0.9
8 103.8 0.2 -2.5 99.4 -1.1 2.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 123.7 - 123.7
M1 (kN.m) -1.3 -1.4 0.0 225
M2 (kN.m) 1.2 1.4 2.6
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.081 Le1/b1 = 8.6 < 15.0 225
Beta = 0.90 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 0.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.87 / 0.90 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-19

2C25 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 24.1 1.1 -0.2 19.0 -0.5 0.0
2 17.3 0.8 -0.2 13.6 -0.4 0.0
3 22.8 1.2 0.0 17.7 -0.6 -0.2
4 20.3 0.6 -0.3 15.2 -0.2 0.0
5 21.0 1.5 -0.2 16.6 -1.0 -0.1
6 20.4 0.4 -0.2 16.0 0.1 0.0
7 21.0 0.9 0.5 16.6 -0.4 -0.7
8 20.4 0.9 -0.9 16.1 -0.4 0.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 24.1 - 24.1
M1 (kN.m) 1.1 0.3 1.4 225
M2 (kN.m) -0.2 -0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.016 Le1/b1 = 8.7 < 15.0 225
Beta = 0.98 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.00 N/mm2
Links = Y8-175

1C26 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 130.0 1.0 1.9 124.9 -2.1 -4.3
2 92.0 0.7 1.3 88.3 -1.4 -3.0
3 121.0 1.1 1.9 115.9 -2.2 -4.4
4 96.7 0.5 1.2 91.6 -1.1 -2.7
5 109.5 2.9 1.6 105.1 -3.7 -3.7
6 111.3 -1.1 1.6 106.9 0.2 -3.7
7 111.8 0.8 3.5 107.4 -1.7 -5.4
8 109.0 0.9 -0.3 104.6 -1.8 -1.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 130.0 - 130.0
M1 (kN.m) -2.1 -1.5 0.0 225
M2 (kN.m) -4.3 -1.5 -6.2
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.086 Le1/b1 = 8.5 < 15.0 225
Beta = 0.90 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.7 / 0.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.89 / 0.86 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-20

1C27 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 121.8 -0.9 -2.3 116.7 1.6 4.4
2 86.3 -0.6 -1.6 82.7 1.1 3.1
3 113.5 -0.9 -2.3 108.4 1.6 4.5
4 92.2 -0.6 -1.4 87.1 1.0 2.6
5 106.1 1.2 -1.9 101.7 -0.6 3.7
6 101.1 -2.7 -1.9 96.7 3.2 3.7
7 102.6 -0.8 -0.1 98.2 1.4 2.0
8 104.6 -0.7 -3.7 100.2 1.3 5.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 121.8 - 121.8
M1 (kN.m) 1.6 1.4 0.0 225
M2 (kN.m) 4.4 1.4 5.8
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.080 Le1/b1 = 8.5 < 15.0 225
Beta = 0.90 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.6 / 3.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.89 / 0.92 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.07 N/mm2
Links = Y8-175

2C27 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 20.6 -3.0 -1.8 15.5 2.3 0.0
2 14.7 -2.2 -1.3 11.1 1.7 0.0
3 17.3 -2.9 -1.9 12.2 2.0 0.0
4 19.8 -2.2 -0.9 14.7 1.9 0.0
5 17.8 -2.0 -1.5 13.5 1.4 0.0
6 17.6 -3.2 -1.5 13.2 2.6 0.0
7 17.7 -2.6 -1.2 13.4 2.0 0.0
8 17.6 -2.6 -1.9 13.3 2.0 0.0
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 17.3 - 17.3
M1 (kN.m) -2.9 -0.2 -4.8 225
M2 (kN.m) -1.9 -0.2 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.011 Le1/b1 = 8.5 < 15.0 225
Beta = 0.99 Le2/b2 = 9.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.9 / 0.6 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.05 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-21

1C28 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 212.1 -2.8 0.5 207.0 5.3 -1.7
2 150.1 -1.9 0.4 146.5 3.8 -1.2
3 185.6 -2.7 0.1 180.5 5.3 -0.7
4 169.6 -1.8 0.8 164.5 3.5 -2.1
5 180.5 -0.4 0.4 176.1 2.6 -1.4
6 179.8 -4.3 0.5 175.4 6.5 -1.5
7 178.1 -2.3 2.4 173.7 4.5 -3.3
8 182.2 -2.3 -1.5 177.8 4.5 0.4
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 212.1 - 212.1
M1 (kN.m) 5.3 2.4 7.3 225
M2 (kN.m) -1.7 -2.4 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.140 Le1/b1 = 8.5 < 15.0 225
Beta = 0.84 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.9 / 0.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.96 / 0.94 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.04 / 0.01 N/mm2
Links = Y8-175

2C28 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 20.0 -8.0 1.9 14.9 6.5 -1.1
2 14.4 -5.6 1.3 10.7 4.6 -0.8
3 16.3 -7.5 0.9 11.2 5.6 -0.5
4 20.0 -5.8 2.1 14.9 5.3 -1.3
5 17.6 -6.1 1.6 13.2 4.9 -0.9
6 16.9 -7.4 1.6 12.5 6.2 -0.9
7 16.6 -6.7 2.2 12.3 5.5 -1.5
8 17.8 -6.8 1.0 13.5 5.6 -0.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 20.0 - 20.0
M1 (kN.m) -8.0 -0.2 -9.8 225
M2 (kN.m) 1.9 0.2 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.013 Le1/b1 = 8.5 < 15.0 225
Beta = 0.98 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.8 / 1.2 kN As (Required): %0.47 236.13 mm2 4Y16
vc'(1/2)= 0.82 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.11 / 0.03 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-22

1C29 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 117.7 2.3 -1.7 112.6 -5.4 2.6
2 83.5 1.6 -1.2 79.9 -3.8 1.8
3 118.4 2.2 -1.8 113.3 -5.4 2.7
4 82.2 1.4 -1.0 77.1 -3.4 1.5
5 100.9 3.7 -1.5 96.5 -6.1 2.2
6 99.6 0.1 -1.5 95.2 -3.0 2.2
7 98.7 2.0 0.4 94.3 -4.6 0.4
8 101.7 1.8 -3.4 97.4 -4.5 3.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 117.7 - 117.7
M1 (kN.m) -5.4 -1.3 -7.7 225
M2 (kN.m) 2.6 1.3 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.077 Le1/b1 = 8.7 < 15.0 225
Beta = 0.91 Le2/b2 = 8.6 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.3 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.91 / 0.80 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.08 / 0.00 N/mm2
Links = Y8-175

2C30 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 32.2 12.4 -2.2 27.1 -18.3 1.7
2 23.0 8.8 -1.5 19.4 -13.0 1.2
3 31.9 12.1 -2.2 26.8 -17.6 1.7
4 24.9 9.0 -1.3 19.8 -14.0 1.1
5 27.7 10.9 -1.9 23.3 -16.0 1.5
6 27.5 10.2 -1.8 23.1 -15.2 1.4
7 27.4 10.6 -1.4 23.0 -15.7 1.0
8 27.8 10.6 -2.2 23.4 -15.6 1.9
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 32.2 - 32.2
M1 (kN.m) -18.3 -0.4 -20.4 225
M2 (kN.m) -2.2 -0.4 0.0
N-max (kN) 0.0
Concrete Cover = 20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.021 Le1/b1 = 9.0 < 15.0 225
Beta = 0.97 Le2/b2 = 8.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 10.2 / 1.4 kN As (Required): %1.16 585.83 mm2 4Y16
vc'(1/2)= 0.83 / 0.83 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.24 / 0.03 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-23

1C31 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 83.8 -5.0 -0.5 78.7 9.8 0.3
2 58.9 -3.5 -0.3 55.2 6.9 0.2
3 83.6 -5.0 -0.5 78.5 9.7 0.2
4 54.0 -3.2 -0.4 48.9 6.1 0.4
5 69.8 -2.3 -0.4 65.4 6.4 0.3
6 71.5 -6.2 -0.4 67.2 10.1 0.2
7 65.8 -4.3 1.4 61.4 8.2 -1.4
8 75.6 -4.2 -2.2 71.2 8.2 1.9
Critical Combination:6 - (G+Q-Nx)
Min Design
N (kN) 71.5 - 71.5
M1 (kN.m) 10.1 0.8 10.8 225
M2 (kN.m) -0.4 -0.8 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.047 Le1/b1 = 8.6 < 15.0 225
Beta = 0.94 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 5.4 / 0.2 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.88 / 0.87 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.13 / 0.00 N/mm2
Links = Y8-175

1C32 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 64.4 2.0 -0.4 59.3 -4.5 0.2
2 45.6 1.4 -0.3 42.0 -3.2 0.1
3 58.4 1.3 -0.4 53.3 -2.9 0.1
4 51.7 2.1 -0.4 46.6 -4.6 0.3
5 56.5 3.6 -0.4 52.1 -5.5 0.2
6 53.0 -0.1 -0.3 48.6 -2.1 0.1
7 59.7 1.7 1.5 55.3 -3.8 -1.5
8 49.7 1.7 -2.2 45.4 -3.8 1.8
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 64.4 - 64.4
M1 (kN.m) -4.5 -0.7 -5.2 225
M2 (kN.m) -0.4 -0.7 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.042 Le1/b1 = 8.6 < 15.0 225
Beta = 0.95 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.0 / 1.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.86 / 0.86 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.07 / 0.03 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-24

2C32 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 23.1 2.3 0.9 18.0 1.0 0.0
2 16.5 1.6 0.7 12.8 0.7 0.0
3 19.6 0.8 0.8 14.5 1.9 0.0
4 21.1 3.0 0.8 16.0 -0.1 0.0
5 20.0 2.5 0.7 15.6 0.2 0.0
6 19.5 1.4 0.9 15.2 1.5 0.0
7 19.8 1.9 1.0 15.5 0.8 0.0
8 19.6 2.0 0.6 15.3 0.9 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 23.1 - 23.1
M1 (kN.m) 2.3 0.3 3.2 225
M2 (kN.m) 0.9 0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.015 Le1/b1 = 8.6 < 15.0 225
Beta = 0.98 Le2/b2 = 9.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.0 / 0.3 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.01 N/mm2
Links = Y8-175

1C33 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 61.9 -4.2 -0.3 56.8 7.6 0.1
2 43.6 -2.9 -0.2 39.9 5.4 0.1
3 55.7 -4.2 -0.4 50.6 7.7 0.3
4 45.9 -2.6 -0.1 40.8 4.8 -0.1
5 51.7 -1.6 -0.2 47.3 4.6 0.1
6 52.8 -5.4 -0.3 48.5 8.3 0.1
7 54.9 -3.5 1.6 50.5 6.4 -1.7
8 49.6 -3.6 -2.1 45.2 6.5 1.9
Critical Combination:6 - (G+Q-Nx)
Min Design
N (kN) 52.8 - 52.8
M1 (kN.m) 8.3 0.6 8.8 225
M2 (kN.m) -0.3 -0.6 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.035 Le1/b1 = 8.6 < 15.0 225
Beta = 0.96 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.6 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.86 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.11 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-25

1C34 Storey: 1 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 93.6 2.9 -0.3 88.5 -6.6 -0.1
2 65.8 2.0 -0.2 62.1 -4.6 -0.1
3 86.9 2.9 -0.4 81.8 -6.7 0.1
4 64.9 1.8 -0.1 59.8 -4.1 -0.3
5 79.9 4.3 -0.2 75.5 -7.4 -0.1
6 77.9 0.5 -0.2 73.6 -3.8 -0.1
7 81.7 2.5 1.7 77.3 -5.6 -1.9
8 76.1 2.4 -2.1 71.8 -5.5 1.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 93.6 - 93.6
M1 (kN.m) -6.6 -1.1 -7.6 225
M2 (kN.m) -0.3 -1.1 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.062 Le1/b1 = 8.6 < 15.0 225
Beta = 0.93 Le2/b2 = 8.5 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 3.9 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.88 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.09 / 0.00 N/mm2
Links = Y8-175

2C35 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 0.0 0.0 0.0 -5.1 -7.3 -0.9
2 0.0 0.0 0.0 -3.6 -5.2 -0.6
3 0.0 0.0 0.0 -5.1 -7.9 -0.6
4 0.0 0.0 0.0 -5.1 -5.3 -0.7
5 0.0 0.0 0.0 -4.4 -6.5 -0.8
6 0.0 0.0 0.0 -4.4 -6.1 -0.7
7 0.0 0.0 0.0 -4.4 -6.4 -1.1
8 0.0 0.0 0.0 -4.4 -6.2 -0.4
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) -5.1 - -5.1
M1 (kN.m) -7.9 0.1 -8.5 225
M2 (kN.m) -0.6 0.1 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = -0.003 Le1/b1 = 8.7 < 15.0 225
Beta = 1.00 Le2/b2 = 8.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.6 / 0.4 kN As (Required): %0.52 260.78 mm2 4Y16
vc'(1/2)= 0.79 / 0.79 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.01 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-26

2C36 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 44.6 -0.1 0.1 39.5 -2.9 4.4
2 31.8 -0.1 0.1 28.2 -2.1 3.1
3 40.8 -0.1 0.5 35.6 -4.0 4.0
4 38.6 -0.1 -0.7 33.5 -1.5 3.7
5 38.0 0.0 0.1 33.6 -2.8 3.7
6 38.4 -0.1 0.1 34.0 -2.2 3.8
7 38.4 -0.1 0.4 34.0 -2.6 3.8
8 38.0 -0.1 -0.2 33.6 -2.4 3.7
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 40.8 - 40.8
M1 (kN.m) -4.0 -0.5 0.0 225
M2 (kN.m) 4.0 0.5 7.8
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.027 Le1/b1 = 8.7 < 15.0 225
Beta = 0.97 Le2/b2 = 9.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.3 / 1.5 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.03 / 0.03 N/mm2
Links = Y8-175

2C37 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 23.4 -0.1 -0.9 18.3 -0.9 0.2
2 16.7 0.0 -0.6 13.1 -0.6 0.1
3 18.6 -0.1 -0.7 13.5 0.3 0.0
4 22.7 0.0 -0.9 17.6 -1.6 0.3
5 20.1 0.0 -0.7 15.7 -1.2 0.2
6 20.0 -0.1 -0.8 15.7 -0.4 0.2
7 20.4 -0.1 -0.3 16.0 -0.8 -0.3
8 19.8 -0.1 -1.2 15.4 -0.8 0.6
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 23.4 - 23.4
M1 (kN.m) -0.9 -0.3 -1.7 225
M2 (kN.m) -0.9 -0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.015 Le1/b1 = 8.9 < 15.0 225
Beta = 0.98 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.5 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.80 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-27

2C38 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 22.5 2.5 0.2 17.4 -4.2 -1.9
2 16.1 1.8 0.2 12.4 -3.0 -1.3
3 22.5 2.9 0.2 17.4 -4.4 -1.6
4 17.5 1.0 0.2 12.4 -2.6 -1.5
5 19.4 2.5 0.2 15.1 -4.1 -1.5
6 19.2 1.7 0.2 14.8 -3.2 -1.7
7 19.3 2.0 0.2 15.0 -3.5 -1.9
8 19.3 2.2 0.2 14.9 -3.7 -1.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 22.5 - 22.5
M1 (kN.m) -4.2 -0.3 -6.1 225
M2 (kN.m) -1.9 -0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.015 Le1/b1 = 8.9 < 15.0 225
Beta = 0.98 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 2.4 / 0.7 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.06 / 0.02 N/mm2
Links = Y8-175

2C39 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 0.0 0.0 0.0 -5.1 0.0 0.0
2 0.0 0.0 0.0 -3.6 0.0 0.0
3 0.0 0.0 0.0 -5.1 0.0 0.0
4 0.0 0.0 0.0 -5.1 0.0 0.0
5 0.0 0.0 0.0 -4.4 0.0 0.0
6 0.0 0.0 0.0 -4.4 0.0 0.0
7 0.0 0.0 0.0 -4.4 0.0 0.0
8 0.0 0.0 0.0 -4.4 0.0 0.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) -5.1 - -5.1
M1 (kN.m) 0.0 -0.1 0.0 225
M2 (kN.m) 0.0 0.1 0.1
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = -0.003 Le1/b1 = 8.7 < 15.0 225
Beta = 1.00 Le2/b2 = 8.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.0 / 0.0 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.73 / 0.73 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.00 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-28

2C40 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 27.0 -1.8 0.0 21.9 2.4 1.0
2 19.3 -1.3 0.0 15.7 1.7 0.7
3 27.0 -0.9 0.0 21.9 2.1 1.1
4 20.7 -1.9 0.0 15.6 2.0 0.6
5 23.0 -1.2 0.0 18.7 1.7 0.9
6 23.3 -1.8 0.0 18.9 2.4 0.8
7 23.3 -1.5 0.0 18.9 2.1 0.4
8 23.1 -1.5 -0.1 18.7 2.1 1.2
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 27.0 - 27.0
M1 (kN.m) 2.4 0.3 3.4 225
M2 (kN.m) 1.0 0.3 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.018 Le1/b1 = 8.8 < 15.0 225
Beta = 0.98 Le2/b2 = 8.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 1.4 / 0.4 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.82 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.03 / 0.01 N/mm2
Links = Y8-175

2C41 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 33.1 -6.5 0.2 28.0 6.2 -3.6
2 23.6 -4.6 0.1 20.0 4.4 -2.5
3 32.9 -4.2 0.2 27.7 5.4 -3.5
4 25.3 -6.4 0.2 20.2 5.1 -2.7
5 28.2 -5.0 0.2 23.8 4.9 -3.0
6 28.5 -5.9 0.2 24.2 5.8 -3.1
7 28.6 -5.5 0.2 24.2 5.3 -3.5
8 28.1 -5.5 0.2 23.8 5.3 -2.7
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 33.1 - 33.1
M1 (kN.m) -6.5 -0.4 -9.9 225
M2 (kN.m) -3.6 -0.4 0.0
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.022 Le1/b1 = 8.9 < 15.0 225
Beta = 0.97 Le2/b2 = 8.8 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 4.2 / 1.2 kN As (Required): %0.40 204.46 mm2 4Y16
vc'(1/2)= 0.84 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.10 / 0.03 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-29

2C42 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 25.2 -0.2 -0.1 20.1 0.6 4.9
2 18.0 -0.1 -0.1 14.3 0.4 3.5
3 26.0 -0.1 -0.1 20.9 0.6 5.1
4 18.6 0.0 -0.1 13.5 0.3 3.5
5 21.2 0.3 -0.1 16.8 0.1 4.1
6 22.0 -0.5 -0.1 17.6 0.9 4.2
7 21.4 -0.1 -0.1 17.0 0.5 3.8
8 21.8 -0.1 -0.1 17.4 0.5 4.5
Critical Combination:3 - ((G+Q)P1 *F)
Min Design
N (kN) 26.0 - 26.0
M1 (kN.m) 0.6 0.3 0.0 225
M2 (kN.m) 5.1 0.3 5.7
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.017 Le1/b1 = 8.7 < 15.0 225
Beta = 0.98 Le2/b2 = 8.9 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.1 / 1.7 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.81 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.00 / 0.04 N/mm2
Links = Y8-175

2C43 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 21.8 -0.1 2.5 16.7 2.2 4.3
2 15.6 -0.1 1.8 12.0 1.5 3.1
3 21.6 -0.1 2.7 16.5 2.2 3.8
4 17.4 -0.1 1.7 12.3 1.4 3.8
5 18.5 -0.1 2.1 14.1 1.5 3.8
6 19.0 -0.1 2.2 14.6 2.2 3.6
7 18.5 -0.1 2.5 14.2 1.8 3.4
8 18.9 -0.1 1.8 14.5 1.8 4.0
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 21.8 - 21.8
M1 (kN.m) 2.2 0.2 0.0 225
M2 (kN.m) 4.3 0.2 6.4
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.014 Le1/b1 = 8.8 < 15.0 225
Beta = 0.98 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.8 / 0.7 kN As (Required): %0.40 (min) 202.50 mm2 4Y16
vc'(1/2)= 0.81 / 0.80 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.02 / 0.02 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-30

2C44 Storey: 2 (Con.:C25/30 / Steel:Grade 410 (Type 2))


Loadings (Combination):
No N (Bot) M1 (Bot) M2 (Bot) N (Top) M1 (Top) M2 (Top)
1 29.6 0.1 -2.1 24.5 -0.9 18.7
2 21.1 0.0 -1.5 17.5 -0.6 13.4
3 29.0 0.0 -2.0 23.9 -0.8 17.9
4 23.5 0.0 -1.6 18.4 -0.7 14.7
5 25.6 0.1 -1.8 21.2 -1.1 15.9
6 25.2 0.0 -1.9 20.8 -0.4 16.2
7 25.2 0.0 -1.5 20.8 -0.7 15.8
8 25.5 0.0 -2.2 21.2 -0.8 16.3
Critical Combination:1 - (G+Q *F)
Min Design
N (kN) 29.6 - 29.6
M1 (kN.m) -0.9 -0.3 0.0 225
M2 (kN.m) 18.7 0.3 19.6
N-max (kN) 0.0
Concrete Cover =20.0 mm
BS8110-Cl.3.8.4.5 Short Column...
N/bhFcu = 0.019 Le1/b1 = 8.8 < 15.0 225
Beta = 0.98 Le2/b2 = 8.7 < 15.0
M-add(1/2)= 0.0 / 0.0 kN.m
Vd(1/2)= 0.4 / 7.0 kN As (Required): %1.11 563.62 mm2 4Y16
vc'(1/2)= 0.81 / 0.82 N/mm2 As (Provided): %1.59 804.25 mm2
v (1/2)= 0.01 / 0.16 N/mm2
Links = Y8-175

Project: EPH_4BEDROOM_F