0% found this document useful (0 votes)
53 views40 pages

Column

The document provides a detailed column reinforcement design for various sections, including critical load combinations and required reinforcement areas. It includes calculations for axial loads, moments, shear forces, and material specifications for concrete and steel. The design adheres to BS8110 standards, with specific attention to concrete cover and reinforcement detailing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views40 pages

Column

The document provides a detailed column reinforcement design for various sections, including critical load combinations and required reinforcement areas. It includes calculations for axial loads, moments, shear forces, and material specifications for concrete and steel. The design adheres to BS8110 standards, with specific attention to concrete cover and reinforcement detailing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)

Column Reinforcement Design Calc. By:


Rev: 1 Checked By:

Column Reinforcement Design


1C1 (A5-A3) (300/230)
Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 534.7 -29.4 -31.6 542.7 14.7 13.6
2 454.9 -29.6 -19.8 462.9 14.8 9.0
3 433.2 -18.6 -32.4 441.1 9.3 13.5
4 460.7 -25.6 -37.3 467.6 13.2 25.4
5 446.1 -24.2 -16.3 452.9 11.6 -2.3
6 458.0 -31.3 -26.3 464.9 19.9 10.9
7 448.7 -18.4 -27.3 455.6 4.9 12.1

Interaction Diagram

Critical Loading: 1 - (G+Q)


Min Design
N 542.7 - 542.7 kN
M11 -29.4 -6.2 -68.3 kN.m
M22 -31.6 -8.1 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.262

Beta =0.70

ProtaStructure v5.1.252 Page 1


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Shear Rebars
Vd(1/2) = 13.3 / 14.9 kN Slender Column... As (Req): %2.53 1744.21 mm2
vc'(1/2) = 1.27 / 1.32 N/mm2 Le1/b1 = 13.1 ≥ 10.0 As (Sup): %2.73 1884.96 mm2
v(1/2) = 0.20 / 0.23 N/mm2 Le2/b2 = 16.2 ≥ 10.0
MAdd(1)/2) = 16.0 / 13.7 kN.m 6Y20
Links = Y10-225

2C1 (A5-A3) (300/230)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 283.6 -41.5 -38.3 291.6 42.8 42.7
2 241.9 -41.6 -24.4 249.9 43.0 27.2
3 229.7 -26.1 -38.4 237.7 26.9 43.1
4 243.1 -35.4 -39.0 249.9 36.4 40.8
5 238.1 -34.7 -25.8 245.0 35.9 31.5
6 242.0 -38.9 -32.2 248.9 39.4 36.0
7 239.1 -31.2 -32.7 246.0 32.9 36.3

Interaction Diagram

Critical Loading: 1 - (G+Q)


Min Design
N 291.6 - 291.6 kN
M11 42.8 3.4 71.3 kN.m
M22 42.7 4.4 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.141

ProtaStructure v5.1.252 Page 2


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Beta =0.84

Shear Rebars
Vd(1/2) = 23.6 / 24.5 kN Slender Column... As (Req): %2.60 1795.42 mm2
vc'(1/2) = 1.17 / 1.20 N/mm2 Le1/b1 = 8.1 < 10.0 √ As (Sup): %2.73 1884.96 mm2
v(1/2) = 0.36 / 0.37 N/mm2 Le2/b2 = 15.4 ≥ 15.0
MAdd(1)/2) = 0.0 / 7.9 kN.m 6Y20
Links = Y10-225

3C1 (A5-A3) (300/230)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 64.2 -0.4 -4.4 71.3 21.3 27.3
2 56.4 -0.4 2.2 63.4 21.2 15.6
3 53.5 -0.3 -9.2 60.6 13.4 28.9
4 55.3 -0.4 -4.6 61.3 18.0 23.1
5 54.7 -0.4 -2.8 60.8 17.9 23.0
6 55.0 -0.4 -3.7 61.1 18.4 23.0
7 55.0 -0.4 -3.7 61.1 17.5 23.0

Interaction Diagram

Critical Loading: 1 - (G+Q)


Min Design
N 71.3 - 71.3 kN
M11 21.3 0.8 40.2 kN.m
M22 27.3 1.1 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

ProtaStructure v5.1.252 Page 3


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

(BS8110 - Cl. [Link])

N/bhFcu =0.034

Beta =0.96

Shear Rebars
Vd(1/2) = 12.5 / 7.1 kN Short Column... As (Req): %1.63 1127.20 mm2
vc'(1/2) = 0.83 / 0.88 N/mm2 Le1/b1 = 7.1 < 15.0 √ As (Sup): %1.82 1256.64 mm2
v(1/2) = 0.19 / 0.11 N/mm2 Le2/b2 = 11.7 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y20
Links = Y10-225

1C2 (A5-A1) (300/230)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 346.4 -17.3 10.7 354.4 8.7 -7.2
2 353.1 -17.5 11.5 361.1 8.8 -6.4
3 225.5 -10.8 6.0 233.5 5.4 -5.4
4 283.6 -14.0 -2.2 290.4 6.6 8.1
5 304.4 -15.3 20.3 311.3 8.1 -20.3
6 299.1 -20.5 9.5 306.0 14.2 -6.7
7 288.9 -8.7 8.6 295.8 0.5 -5.5

Interaction Diagram

Critical Loading: 5 - (G+Q-Nx)


Min Design
N 311.3 - 311.3 kN
M11 -15.3 -3.6 -41.4 kN.m
M22 20.3 4.7 0.0 kN.m

ProtaStructure v5.1.252 Page 4


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.150

Beta =0.82

Shear Rebars
Vd(1/2) = 3.0 / 10.1 kN Slender Column... As (Req): %0.93 638.27 mm2
vc'(1/2) = 0.90 / 0.96 N/mm2 Le1/b1 = 12.8 ≥ 10.0 As (Sup): %1.17 804.25 mm2
v(1/2) = 0.05 / 0.15 N/mm2 Le2/b2 = 16.2 ≥ 10.0
MAdd(1)/2) = 9.4 / 7.6 kN.m 4Y16
Links = Y10-175

2C2 (A5-A1) (300/230)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 205.8 -27.5 21.3 213.8 26.8 -18.8
2 208.5 -27.7 20.8 216.5 27.1 -18.7
3 136.4 -17.3 14.2 144.4 16.8 -11.9
4 171.2 -22.9 11.0 178.0 22.4 -10.4
5 178.7 -23.5 25.1 185.6 22.9 -21.3
6 176.7 -26.8 18.2 183.6 25.7 -16.0
7 173.2 -19.7 17.8 180.0 19.7 -15.7

Interaction Diagram

Critical Loading: 5 - (G+Q-Nx)


Min Design

ProtaStructure v5.1.252 Page 5


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

N 185.6 - 185.6 kN
M11 -23.5 -2.1 -41.7 kN.m
M22 25.1 2.8 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.090

Beta =0.89

Shear Rebars
Vd(1/2) = 13.4 / 15.2 kN Slender Column... As (Req): %1.33 914.70 mm2
vc'(1/2) = 0.98 / 1.01 N/mm2 Le1/b1 = 7.9 < 10.0 √ As (Sup): %1.82 1256.64 mm2
v(1/2) = 0.21 / 0.23 N/mm2 Le2/b2 = 15.5 ≥ 15.0
MAdd(1)/2) = 5.1 / 0.0 kN.m 4Y20
Links = Y10-225

3C2 (A5-A1) (300/230)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 47.9 -18.2 10.4 55.0 24.8 -13.0
2 47.9 -18.4 9.3 54.9 25.0 -13.3
3 34.0 -12.6 8.0 41.0 16.2 -8.1
4 40.3 -15.6 7.2 46.4 21.1 -10.5
5 41.7 -15.6 10.5 47.8 21.1 -11.5
6 41.3 -16.3 8.9 47.4 21.6 -11.0
7 40.8 -14.9 8.8 46.8 20.6 -11.0

Interaction Diagram

ProtaStructure v5.1.252 Page 6


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Critical Loading: 2 - ((G+Q)p1)


Min Design
N 54.9 - 54.9 kN
M11 25.0 0.6 34.3 kN.m
M22 -13.3 -0.8 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.027

Beta =0.97

Shear Rebars
Vd(1/2) = 7.2 / 14.2 kN Short Column... As (Req): %1.37 947.90 mm2
vc'(1/2) = 0.83 / 0.89 N/mm2 Le1/b1 = 6.7 < 15.0 √ As (Sup): %1.82 1256.64 mm2
v(1/2) = 0.11 / 0.22 N/mm2 Le2/b2 = 9.4 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y20
Links = Y10-225

1C3 (A5-A2) (300/230)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 720.7 -31.3 18.3 728.7 15.6 -11.0
2 626.7 -31.9 7.2 634.7 16.0 -4.3
3 563.8 -19.0 23.2 571.8 9.4 -13.9
4 613.4 -26.3 1.0 620.3 13.1 6.5
5 607.3 -26.5 30.1 614.1 13.2 -25.1
6 615.1 -32.6 16.2 622.0 20.3 -10.0
7 605.6 -20.2 15.0 612.4 6.0 -8.7

Interaction Diagram

ProtaStructure v5.1.252 Page 7


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Critical Loading: 1 - (G+Q)


Min Design
N 728.7 - 728.7 kN
M11 -31.3 -8.4 -62.7 kN.m
M22 18.3 10.9 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.352

Beta =0.59

Shear Rebars
Vd(1/2) = 1.6 / 13.9 kN Slender Column... As (Req): %2.71 1868.09 mm2
vc'(1/2) = 1.22 / 1.41 N/mm2 Le1/b1 = 12.2 ≥ 10.0 As (Sup): %2.73 1884.96 mm2
v(1/2) = 0.02 / 0.21 N/mm2 Le2/b2 = 16.2 ≥ 10.0
MAdd(1)/2) = 17.9 / 13.3 kN.m 6Y20
Links = Y10-225

2C3 (A5-A2) (300/230)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 371.8 -36.7 21.9 379.8 41.9 -24.8
2 323.9 -37.0 6.3 331.9 42.5 -8.4
3 291.0 -21.6 29.5 299.0 25.1 -32.5
4 316.3 -30.7 8.7 323.2 35.2 -11.7
5 313.7 -30.8 28.3 320.5 35.3 -30.3
6 316.7 -34.5 18.8 323.5 38.4 -21.3
7 313.3 -27.1 18.2 320.1 32.1 -20.7

ProtaStructure v5.1.252 Page 8


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Interaction Diagram

Critical Loading: 1 - (G+Q)


Min Design
N 379.8 - 379.8 kN
M11 41.9 4.4 56.1 kN.m
M22 -24.8 -5.7 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.183

Beta =0.79

Shear Rebars
Vd(1/2) = 18.0 / 23.0 kN Slender Column... As (Req): %1.60 1104.29 mm2
vc'(1/2) = 1.14 / 1.14 N/mm2 Le1/b1 = 7.5 < 10.0 √ As (Sup): %1.82 1256.64 mm2
v(1/2) = 0.27 / 0.35 N/mm2 Le2/b2 = 15.5 ≥ 15.0
MAdd(1)/2) = 0.0 / 10.4 kN.m 4Y20
Links = Y10-225

3C3 (A5-A2) (300/230)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 76.4 -19.7 2.3 83.5 27.3 -6.4
2 68.5 -19.3 -5.0 75.5 27.1 4.2
3 62.8 -13.7 8.5 69.9 16.8 -14.2
4 66.0 -16.8 -0.4 72.1 22.9 -3.5
5 65.1 -16.8 4.2 71.2 22.9 -7.1

ProtaStructure v5.1.252 Page 9


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

6 65.8 -17.6 1.9 71.9 23.5 -5.4


7 65.3 -16.0 1.8 71.4 22.4 -5.3

Interaction Diagram

Critical Loading: 1 - (G+Q)


Min Design
N 83.5 - 83.5 kN
M11 27.3 1.0 31.7 kN.m
M22 -6.4 -1.3 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.040

Beta =0.95

Shear Rebars
Vd(1/2) = 7.5 / 15.2 kN Short Column... As (Req): %1.11 766.12 mm2
vc'(1/2) = 0.74 / 0.79 N/mm2 Le1/b1 = 6.8 < 15.0 √ As (Sup): %1.17 804.25 mm2
v(1/2) = 0.11 / 0.23 N/mm2 Le2/b2 = 9.4 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y10-175

1C4 (A6-A2) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

No NTop M1 Top M2 Top NBot M1 Bot M2 Bot

ProtaStructure v5.1.252 Page 10


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)


1 1107.4 17.9 21.1 1115.4 -8.6 -11.6
2 884.2 23.1 9.3 892.2 -11.1 -5.1
3 928.8 5.7 24.7 936.8 -2.7 -13.7
4 938.0 15.1 7.6 944.9 -7.3 0.9
5 933.4 15.0 27.9 940.3 -7.1 -20.4
6 939.1 3.6 17.8 946.0 5.4 -9.8
7 932.3 26.5 17.7 939.2 -19.8 -9.7

Interaction Diagram

Critical Loading: 5 - (G+Q-Nx)


Min Design
N 940.3 - 940.3 kN
M11 15.0 14.1 0.0 kN.m
M22 27.9 10.8 56.2 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.454

Beta =0.47

Shear Rebars
Vd(1/2) = 1.9 / 0.5 kN Slender Column... As (Req): %3.47 2394.54 mm2
vc'(1/2) = 1.46 / 1.17 N/mm2 Le1/b1 = 15.6 ≥ 10.0 As (Sup): %3.64 2513.27 mm2
v(1/2) = 0.03 / 0.01 N/mm2 Le2/b2 = 12.1 ≥ 10.0
MAdd(1)/2) = 14.4 / 18.2 kN.m 8Y20
Links = Y10-225

2C4 (A6-A2) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

ProtaStructure v5.1.252 Page 11


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 551.4 21.2 30.5 559.4 -23.8 -31.2
2 440.7 27.1 12.9 448.7 -30.6 -13.4
3 462.4 6.6 36.2 470.4 -7.5 -36.9
4 467.0 17.8 18.7 473.8 -20.0 -19.4
5 465.0 17.8 32.6 471.8 -20.0 -33.1
6 467.3 10.7 25.7 474.2 -13.5 -26.3
7 464.6 24.9 25.6 471.5 -26.5 -26.2

Interaction Diagram

Critical Loading: 1 - (G+Q)


Min Design
N 559.4 - 559.4 kN
M11 -23.8 -8.4 0.0 kN.m
M22 -31.2 -6.4 -43.1 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.270

Beta =0.69

Shear Rebars
Vd(1/2) = 21.2 / 16.7 kN Slender Column... As (Req): %1.08 747.65 mm2
vc'(1/2) = 1.17 / 1.21 N/mm2 Le1/b1 = 9.5 < 15.0 √ As (Sup): %1.17 804.25 mm2
v(1/2) = 0.32 / 0.26 N/mm2 Le2/b2 = 11.2 ≥ 10.0
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y10-175

3C4 (A6-A2) (230/300)


ProtaStructure v5.1.252 Page 12
TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 89.3 11.2 6.4 96.3 -16.8 -17.1
2 78.0 13.3 -1.8 85.1 -20.7 -3.6
3 76.0 5.5 11.9 83.1 -6.3 -23.5
4 76.9 9.5 3.1 82.9 -14.1 -12.1
5 76.4 9.6 7.6 82.5 -14.2 -16.6
6 76.9 7.8 5.3 83.0 -12.6 -14.3
7 76.4 11.3 5.3 82.5 -15.7 -14.4

Interaction Diagram

Critical Loading: 3 - ((G+Q)p2)


Min Design
N 83.1 - 83.1 kN
M11 -6.3 -1.2 0.0 kN.m
M22 -23.5 -1.0 -27.9 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.040

Beta =0.95

Shear Rebars
Vd(1/2) = 11.6 / 11.1 kN Short Column... As (Req): %0.92 634.92 mm2
vc'(1/2) = 0.79 / 0.76 N/mm2 Le1/b1 = 8.9 < 15.0 √ As (Sup): %1.17 804.25 mm2
v(1/2) = 0.18 / 0.17 N/mm2 Le2/b2 = 6.9 < 15.0 √

ProtaStructure v5.1.252 Page 13


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16


Links = Y10-175

1C5 (A6-A1) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 442.9 14.1 6.7 450.9 -6.7 -4.5
2 433.3 15.0 8.4 441.3 -7.2 -4.6
3 310.6 7.7 2.7 318.6 -3.7 -2.8
4 368.6 13.1 -2.6 375.4 -7.0 5.9
5 384.7 10.6 14.0 391.6 -4.3 -13.5
6 379.9 0.9 5.7 386.7 6.4 -3.8
7 373.4 22.9 5.6 380.3 -17.8 -3.7

Interaction Diagram

Critical Loading: 5 - (G+Q-Nx)


Min Design
N 391.6 - 391.6 kN
M11 10.6 5.9 0.0 kN.m
M22 14.0 4.5 36.5 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.189

Beta =0.78

ProtaStructure v5.1.252 Page 14


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Shear Rebars
Vd(1/2) = 2.5 / 1.6 kN Slender Column... As (Req): %0.54 374.46 mm2
vc'(1/2) = 0.98 / 0.88 N/mm2 Le1/b1 = 16.0 ≥ 10.0 As (Sup): %1.17 804.25 mm2
v(1/2) = 0.04 / 0.02 N/mm2 Le2/b2 = 12.1 ≥ 10.0
MAdd(1)/2) = 8.6 / 11.5 kN.m 4Y16
Links = Y10-175

2C5 (A6-A1) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 264.5 21.4 12.8 272.5 -20.9 -11.6
2 256.5 22.8 14.5 264.5 -22.3 -13.4
3 189.0 11.8 6.8 197.0 -11.4 -5.7
4 222.1 18.7 5.6 228.9 -18.2 -5.2
5 228.4 17.3 16.2 235.2 -17.0 -14.4
6 226.5 11.1 10.9 233.4 -11.3 -9.8
7 224.0 24.9 10.9 230.8 -23.9 -9.8

Interaction Diagram

Critical Loading: 5 - (G+Q-Nx)


Min Design
N 235.2 - 235.2 kN
M11 17.3 3.5 0.0 kN.m
M22 16.2 2.7 28.4 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

ProtaStructure v5.1.252 Page 15


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

(BS8110 - Cl. [Link])

N/bhFcu =0.114

Beta =0.86

Shear Rebars
Vd(1/2) = 8.9 / 14.1 kN Slender Column... As (Req): %0.44 303.66 mm2
vc'(1/2) = 0.93 / 0.94 N/mm2 Le1/b1 = 9.8 < 15.0 √ As (Sup): %1.17 804.25 mm2
v(1/2) = 0.14 / 0.22 N/mm2 Le2/b2 = 11.2 ≥ 10.0
MAdd(1)/2) = 0.0 / 6.2 kN.m 4Y16
Links = Y10-175

3C5 (A6-A1) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 66.3 10.8 12.8 73.4 -18.0 -11.2
2 60.7 12.8 11.7 67.8 -19.8 -12.0
3 52.6 5.4 9.6 59.7 -9.7 -6.6
4 56.2 9.3 9.4 62.3 -15.3 -8.3
5 57.4 9.1 12.3 63.4 -15.2 -10.7
6 57.0 7.7 10.8 63.1 -13.9 -9.5
7 56.6 10.7 10.9 62.6 -16.5 -9.5

Interaction Diagram

Critical Loading: 2 - ((G+Q)p1)


Min Design
N 67.8 - 67.8 kN

ProtaStructure v5.1.252 Page 16


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

M11 -19.8 -1.0 -35.6 kN.m


M22 -12.0 -0.8 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.033

Beta =0.96

Shear Rebars
Vd(1/2) = 7.5 / 10.7 kN Short Column... As (Req): %0.86 593.23 mm2
vc'(1/2) = 0.78 / 0.74 N/mm2 Le1/b1 = 9.3 < 15.0 √ As (Sup): %1.17 804.25 mm2
v(1/2) = 0.12 / 0.16 N/mm2 Le2/b2 = 6.9 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y10-175

1C6 (A6-A3) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 828.0 21.4 -39.2 836.0 -10.3 18.3
2 660.8 24.2 -23.9 668.8 -11.6 11.4
3 704.9 10.9 -39.6 712.9 -5.2 18.2
4 706.8 16.8 -40.9 713.6 -7.3 24.9
5 695.2 19.4 -25.1 702.1 -10.2 5.9
6 704.9 6.1 -33.0 711.8 4.5 15.4
7 697.1 30.2 -33.1 703.9 -21.9 15.4

Interaction Diagram

ProtaStructure v5.1.252 Page 17


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Critical Loading: 1 - (G+Q)


Min Design
N 836.0 - 836.0 kN
M11 21.4 12.5 0.0 kN.m
M22 -39.2 -9.6 -73.5 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.404

Beta =0.53

Shear Rebars
Vd(1/2) = 16.8 / 0.5 kN Slender Column... As (Req): %4.25 2930.77 mm2
vc'(1/2) = 1.63 / 1.16 N/mm2 Le1/b1 = 16.3 ≥ 10.0 As (Sup): %4.55 3141.59 mm2
v(1/2) = 0.26 / 0.01 N/mm2 Le2/b2 = 12.1 ≥ 10.0
MAdd(1)/2) = 14.8 / 20.5 kN.m 10Y20
Links = Y10-225

2C6 (A6-A3) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 432.5 29.9 -54.2 440.5 -30.9 56.2
2 345.7 33.5 -33.2 353.7 -34.8 34.5
3 368.6 15.2 -54.3 376.6 -15.7 56.5
4 368.5 24.5 -50.6 375.3 -25.5 51.5
5 364.2 25.9 -40.7 371.1 -26.7 43.3

ProtaStructure v5.1.252 Page 18


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

6 368.2 17.8 -45.6 375.0 -19.3 47.4


7 364.5 32.7 -45.7 371.4 -32.9 47.4

Interaction Diagram

Critical Loading: 1 - (G+Q)


Min Design
N 440.5 - 440.5 kN
M11 -30.9 -6.6 0.0 kN.m
M22 56.2 5.1 77.3 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.213

Beta =0.75

Shear Rebars
Vd(1/2) = 32.1 / 19.8 kN Slender Column... As (Req): %3.43 2367.93 mm2
vc'(1/2) = 1.50 / 1.49 N/mm2 Le1/b1 = 10.0 < 15.0 √ As (Sup): %4.55 3141.59 mm2
v(1/2) = 0.49 / 0.30 N/mm2 Le2/b2 = 11.2 ≥ 10.0
MAdd(1)/2) = 0.0 / 12.4 kN.m 10Y20
Links = Y10-225

3C6 (A6-A3) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

No NTop M1 Top M2 Top NBot M1 Bot M2 Bot

ProtaStructure v5.1.252 Page 19


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)


1 77.4 -1.7 -9.9 84.5 -13.6 37.6
2 65.1 0.2 -2.3 72.2 -16.6 21.9
3 67.5 -3.4 -13.6 74.5 -5.2 38.9
4 66.7 -1.5 -9.6 72.8 -11.5 32.7
5 65.9 -1.5 -7.0 72.0 -11.4 30.7
6 67.0 -2.9 -8.3 73.1 -10.0 31.7
7 65.6 -0.1 -8.3 71.7 -12.9 31.7

Interaction Diagram

Critical Loading: 1 - (G+Q)


Min Design
N 84.5 - 84.5 kN
M11 -13.6 -1.3 0.0 kN.m
M22 37.6 1.0 47.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.041

Beta =0.95

Shear Rebars
Vd(1/2) = 17.2 / 5.5 kN Short Column... As (Req): %1.94 1336.15 mm2
vc'(1/2) = 1.02 / 0.93 N/mm2 Le1/b1 = 8.9 < 15.0 √ As (Sup): %2.73 1884.96 mm2
v(1/2) = 0.26 / 0.08 N/mm2 Le2/b2 = 7.2 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 6Y20
Links = Y10-225

1C7 (A7-A3) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

ProtaStructure v5.1.252 Page 20


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 498.8 -11.4 -0.3 506.8 5.9 -1.0
2 419.3 -15.0 -0.1 427.3 7.7 -0.4
3 404.3 -3.7 -0.4 412.3 1.9 -1.2
4 422.4 -11.0 -2.8 429.2 6.4 6.3
5 422.0 -8.3 2.3 428.8 3.5 -8.0
6 421.1 -22.1 -0.3 428.0 18.4 -0.7
7 423.2 2.8 -0.2 430.0 -8.5 -1.0

Interaction Diagram

Critical Loading: 1 - (G+Q)


Min Design
N 506.8 - 506.8 kN
M11 -11.4 -7.6 0.0 kN.m
M22 -1.0 -5.8 -82.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.245

Beta =0.72

Shear Rebars
Vd(1/2) = 0.1 / 6.6 kN Slender Column... As (Req): %3.92 2703.18 mm2
vc'(1/2) = 1.25 / 1.45 N/mm2 Le1/b1 = 34.5 ≥ 10.0 As (Sup): %4.55 3141.59 mm2
v(1/2) = 0.00 / 0.10 N/mm2 Le2/b2 = 12.1 ≥ 10.0
MAdd(1)/2) = 11.1 / 69.4 kN.m 10Y20
Links = Y10-225

2C7 (A7-A3) (230/300)


ProtaStructure v5.1.252 Page 21
TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 264.7 -14.3 0.2 272.7 15.8 -0.1

Interaction Diagram

Critical Loading: 1 - (G+Q)


Min Design
N 272.7 - 272.7 kN
M11 15.8 4.1 24.2 kN.m
M22 0.2 3.1 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.132

Beta =0.85

Shear Rebars
Vd(1/2) = 0.1 / 8.7 kN Slender Column... As (Req): %0.40 (min) 276.00 mm2
vc'(1/2) = 0.90 / 1.00 N/mm2 Le1/b1 = 15.0 ≥ 10.0 As (Sup): %1.17 804.25 mm2
v(1/2) = 0.00 / 0.13 N/mm2 Le2/b2 = 11.2 < 15.0 √
MAdd(1)/2) = 7.1 / 0.0 kN.m 4Y16
Links = Y10-175

3C7 (A7-A3) (230/300)

ProtaStructure v5.1.252 Page 22


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 45.8 -5.4 0.0 52.9 12.3 0.4
2 40.0 -8.3 0.0 47.1 16.5 0.2
3 38.4 -0.8 0.0 45.4 3.6 0.5
4 39.3 -4.7 0.0 45.3 10.4 0.0
5 39.2 -4.6 0.0 45.3 10.4 0.7
6 38.9 -6.6 0.0 45.0 12.1 0.4
7 39.5 -2.7 0.0 45.6 8.6 0.3

Interaction Diagram

Critical Loading: 2 - ((G+Q)p1)


Min Design
N 47.1 - 47.1 kN
M11 16.5 0.7 17.2 kN.m
M22 0.2 0.5 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.023

Beta =0.97

Shear Rebars
Vd(1/2) = 0.2 / 8.1 kN Short Column... As (Req): %0.40 (min) 276.00 mm2
vc'(1/2) = 0.75 / 0.71 N/mm2 Le1/b1 = 13.3 < 15.0 √ As (Sup): %1.17 804.25 mm2
v(1/2) = 0.00 / 0.12 N/mm2 Le2/b2 = 6.9 < 15.0 √

ProtaStructure v5.1.252 Page 23


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16


Links = Y10-175

1C8 (A7-A2) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 803.3 -11.8 -12.2 811.3 6.0 4.9
2 690.7 -17.8 -13.4 698.7 9.0 6.2
3 625.2 -1.2 -6.8 633.2 0.7 2.0
4 687.6 -9.9 -19.6 694.4 5.0 14.7
5 669.8 -10.1 -1.1 676.7 5.2 -6.3
6 678.0 -21.8 -10.5 684.8 17.9 4.4
7 679.5 1.9 -10.2 686.3 -7.7 4.0

Interaction Diagram

Critical Loading: 4 - (G+Q+Nx)


Min Design
N 694.4 - 694.4 kN
M11 -9.9 -10.4 0.0 kN.m
M22 -19.6 -8.0 -45.8 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.335

Beta =0.61

ProtaStructure v5.1.252 Page 24


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Shear Rebars
Vd(1/2) = 1.5 / 2.8 kN Slender Column... As (Req): %1.59 1095.32 mm2
vc'(1/2) = 1.11 / 1.32 N/mm2 Le1/b1 = 16.0 ≥ 10.0 As (Sup): %1.82 1256.64 mm2
v(1/2) = 0.02 / 0.04 N/mm2 Le2/b2 = 12.1 ≥ 10.0
MAdd(1)/2) = 12.2 / 16.4 kN.m 4Y20
Links = Y10-225

2C8 (A7-A2) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 389.7 -17.2 -16.4 397.7 17.6 17.1
2 336.9 -24.6 -18.7 344.9 25.8 19.4
3 300.2 -3.0 -8.2 308.2 2.5 8.9
4 331.8 -14.4 -19.9 338.7 14.8 19.9
5 326.4 -14.5 -7.9 333.2 14.9 9.2
6 328.6 -21.9 -14.0 335.4 21.8 14.6
7 329.6 -7.0 -13.8 336.5 7.8 14.4

Interaction Diagram

Critical Loading: 2 - ((G+Q)p1)


Min Design
N 344.9 - 344.9 kN
M11 25.8 5.2 0.0 kN.m
M22 19.4 4.0 38.4 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

ProtaStructure v5.1.252 Page 25


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

(BS8110 - Cl. [Link])

N/bhFcu =0.167

Beta =0.81

Shear Rebars
Vd(1/2) = 11.5 / 14.6 kN Slender Column... As (Req): %0.70 483.22 mm2
vc'(1/2) = 1.04 / 1.10 N/mm2 Le1/b1 = 9.8 < 15.0 √ As (Sup): %1.17 804.25 mm2
v(1/2) = 0.18 / 0.22 N/mm2 Le2/b2 = 11.2 ≥ 10.0
MAdd(1)/2) = 0.0 / 9.0 kN.m 4Y16
Links = Y10-175

3C8 (A7-A2) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 41.6 -5.1 0.0 48.7 11.6 8.0
2 35.6 -8.6 0.0 42.6 17.1 8.6
3 35.5 -0.1 0.0 42.6 1.8 4.5
4 35.6 -4.4 0.0 41.6 9.8 7.6
5 35.7 -4.3 0.0 41.7 9.7 5.8
6 35.5 -6.1 0.0 41.5 11.4 6.7
7 35.8 -2.6 0.0 41.8 8.1 6.8

Interaction Diagram

Critical Loading: 2 - ((G+Q)p1)


Min Design
N 42.6 - 42.6 kN

ProtaStructure v5.1.252 Page 26


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

M11 17.1 0.6 28.6 kN.m


M22 8.6 0.5 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.021

Beta =0.98

Shear Rebars
Vd(1/2) = 2.8 / 8.4 kN Short Column... As (Req): %0.71 492.98 mm2
vc'(1/2) = 0.75 / 0.70 N/mm2 Le1/b1 = 11.6 < 15.0 √ As (Sup): %1.17 804.25 mm2
v(1/2) = 0.04 / 0.13 N/mm2 Le2/b2 = 6.9 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y10-175

1C9 (A7-A1) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 420.4 -12.5 17.3 428.4 6.3 -9.7
2 395.5 -13.5 16.2 403.5 6.9 -8.4
3 308.7 -6.7 12.3 316.7 3.4 -7.5
4 348.2 -9.3 5.4 355.0 4.0 2.3
5 366.3 -11.8 23.9 373.2 6.7 -18.7
6 356.4 -22.0 14.5 363.2 17.7 -8.0
7 358.1 0.9 14.8 365.0 -7.0 -8.4

Interaction Diagram

ProtaStructure v5.1.252 Page 27


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Critical Loading: 5 - (G+Q-Nx)


Min Design
N 373.2 - 373.2 kN
M11 -11.8 -5.6 0.0 kN.m
M22 23.9 4.3 46.4 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.180

Beta =0.79

Shear Rebars
Vd(1/2) = 0.9 / 11.5 kN Slender Column... As (Req): %1.07 735.50 mm2
vc'(1/2) = 0.82 / 1.08 N/mm2 Le1/b1 = 16.0 ≥ 10.0 As (Sup): %1.17 804.25 mm2
v(1/2) = 0.01 / 0.18 N/mm2 Le2/b2 = 12.1 ≥ 10.0
MAdd(1)/2) = 8.1 / 11.0 kN.m 4Y16
Links = Y10-175

2C9 (A7-A1) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 219.1 -17.2 26.6 227.1 18.2 -26.4
2 204.4 -18.5 24.3 212.4 19.6 -24.2
3 162.8 -9.0 19.3 170.8 9.8 -19.2
4 183.4 -13.7 16.5 190.2 14.7 -17.0
5 189.1 -15.1 28.4 196.0 16.0 -27.7

ProtaStructure v5.1.252 Page 28


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

6 185.7 -21.6 22.4 192.6 22.1 -22.3


7 186.8 -7.2 22.6 193.6 8.6 -22.5

Interaction Diagram

Critical Loading: 5 - (G+Q-Nx)


Min Design
N 196.0 - 196.0 kN
M11 16.0 2.9 0.0 kN.m
M22 28.4 2.3 40.6 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.095

Beta =0.89

Shear Rebars
Vd(1/2) = 16.3 / 12.7 kN Slender Column... As (Req): %1.23 846.15 mm2
vc'(1/2) = 1.02 / 1.01 N/mm2 Le1/b1 = 9.8 < 15.0 √ As (Sup): %1.82 1256.64 mm2
v(1/2) = 0.25 / 0.19 N/mm2 Le2/b2 = 11.2 ≥ 10.0
MAdd(1)/2) = 0.0 / 5.1 kN.m 4Y20
Links = Y10-225

3C9 (A7-A1) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

No NTop M1 Top M2 Top NBot M1 Bot M2 Bot

ProtaStructure v5.1.252 Page 29


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)


1 39.7 -7.4 0.0 46.8 12.8 -8.9
2 34.8 -9.1 0.0 41.9 14.3 -8.3
3 33.3 -3.2 0.0 40.3 6.4 -6.2
4 34.1 -6.2 0.0 40.1 10.7 -6.6
5 34.0 -6.3 0.0 40.1 10.8 -8.5
6 33.9 -7.9 0.0 40.0 12.2 -7.5
7 34.2 -4.7 0.0 40.2 9.3 -7.5

Interaction Diagram

Critical Loading: 2 - ((G+Q)p1)


Min Design
N 41.9 - 41.9 kN
M11 14.3 0.6 25.4 kN.m
M22 -8.3 -0.5 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.020

Beta =0.98

Shear Rebars
Vd(1/2) = 2.8 / 7.7 kN Short Column... As (Req): %0.61 419.82 mm2
vc'(1/2) = 0.75 / 0.71 N/mm2 Le1/b1 = 11.6 < 15.0 √ As (Sup): %1.17 804.25 mm2
v(1/2) = 0.04 / 0.12 N/mm2 Le2/b2 = 6.9 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y10-175

1C10 (A9-A3) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

ProtaStructure v5.1.252 Page 30


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 420.4 18.4 -24.7 428.4 -8.8 11.1
2 342.7 19.5 -15.2 350.7 -9.3 7.1
3 358.9 10.7 -25.6 366.9 -5.1 11.3
4 362.1 14.4 -29.9 368.9 -6.1 20.1
5 351.6 16.7 -12.0 358.4 -8.8 -1.3
6 349.3 5.9 -21.3 356.1 4.6 9.9
7 364.4 25.2 -20.6 371.2 -19.5 9.0

Interaction Diagram

Critical Loading: 4 - (G+Q+Nx)


Min Design
N 368.9 - 368.9 kN
M11 14.4 5.5 0.0 kN.m
M22 -29.9 -4.2 -54.7 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.178

Beta =0.79

Shear Rebars
Vd(1/2) = 14.5 / 0.4 kN Slender Column... As (Req): %1.54 1062.42 mm2
vc'(1/2) = 1.13 / 0.82 N/mm2 Le1/b1 = 16.3 ≥ 10.0 As (Sup): %1.82 1256.64 mm2
v(1/2) = 0.22 / 0.01 N/mm2 Le2/b2 = 12.8 ≥ 10.0
MAdd(1)/2) = 9.1 / 11.2 kN.m 4Y20
Links = Y10-225

2C10 (A9-A3) (230/300)


ProtaStructure v5.1.252 Page 31
TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 228.8 25.3 -33.9 236.8 -26.3 35.2
2 187.1 26.8 -21.3 195.1 -27.9 21.9
3 195.5 14.6 -34.4 203.5 -15.3 35.9
4 196.3 20.8 -34.2 203.2 -21.8 34.3
5 192.4 22.0 -23.2 199.3 -22.7 25.3
6 191.8 16.0 -28.9 198.7 -18.3 29.9
7 197.0 26.8 -28.5 203.8 -26.3 29.6

Interaction Diagram

Critical Loading: 1 - (G+Q)


Min Design
N 236.8 - 236.8 kN
M11 -26.3 -3.6 0.0 kN.m
M22 35.2 2.7 53.7 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.114

Beta =0.86

Shear Rebars
Vd(1/2) = 20.4 / 15.8 kN Slender Column... As (Req): %1.81 1250.38 mm2
vc'(1/2) = 1.03 / 1.01 N/mm2 Le1/b1 = 10.0 < 15.0 √ As (Sup): %1.82 1256.64 mm2
v(1/2) = 0.31 / 0.24 N/mm2 Le2/b2 = 12.6 ≥ 10.0

ProtaStructure v5.1.252 Page 32


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

MAdd(1)/2) = 0.0 / 6.7 kN.m 4Y20


Links = Y10-225

3C10 (A9-A3) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 47.0 10.7 -21.2 54.0 -16.9 29.9
2 39.4 11.4 -14.8 46.5 -18.2 19.4
3 40.9 6.9 -20.9 48.0 -9.7 30.1
4 40.6 9.1 -19.2 46.6 -14.3 26.1
5 39.9 9.2 -17.0 46.0 -14.3 24.6
6 39.8 8.2 -18.1 45.9 -13.8 25.3
7 40.6 10.2 -18.1 46.7 -14.8 25.3

Interaction Diagram

Critical Loading: 1 - (G+Q)


Min Design
N 54.0 - 54.0 kN
M11 -16.9 -0.8 0.0 kN.m
M22 29.9 0.6 41.8 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.026

Beta =0.97

ProtaStructure v5.1.252 Page 33


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Shear Rebars
Vd(1/2) = 16.7 / 9.7 kN Short Column... As (Req): %1.77 1220.74 mm2
vc'(1/2) = 0.89 / 0.82 N/mm2 Le1/b1 = 9.5 < 15.0 √ As (Sup): %1.82 1256.64 mm2
v(1/2) = 0.25 / 0.15 N/mm2 Le2/b2 = 7.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y20
Links = Y10-225

1C11 (A9-A2) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 804.8 24.3 10.5 812.8 -11.7 -6.3
2 688.8 26.2 1.8 696.8 -12.6 -1.4
3 629.0 13.4 15.9 637.0 -6.5 -9.3
4 682.3 20.6 -2.5 689.2 -10.0 6.6
5 677.5 20.4 20.5 684.3 -9.8 -17.4
6 672.6 11.4 8.5 679.4 1.6 -4.9
7 687.2 29.7 9.5 694.1 -21.4 -5.9

Interaction Diagram

Critical Loading: 7 - (G+Q-Ny)


Min Design
N 694.1 - 694.1 kN
M11 29.7 10.4 65.7 kN.m
M22 9.5 8.0 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

ProtaStructure v5.1.252 Page 34


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

(BS8110 - Cl. [Link])

N/bhFcu =0.335

Beta =0.61

Shear Rebars
Vd(1/2) = 7.3 / 2.8 kN Slender Column... As (Req): %2.12 1462.89 mm2
vc'(1/2) = 1.44 / 1.25 N/mm2 Le1/b1 = 15.6 ≥ 10.0 As (Sup): %2.73 1884.96 mm2
v(1/2) = 0.11 / 0.04 N/mm2 Le2/b2 = 12.8 ≥ 10.0
MAdd(1)/2) = 16.3 / 14.4 kN.m 6Y20
Links = Y10-225

2C11 (A9-A2) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 408.8 31.8 17.4 416.8 -33.9 -16.9
2 349.5 34.1 4.8 357.5 -36.4 -3.8
3 320.6 17.2 24.5 328.6 -18.5 -24.6
4 346.5 26.9 7.1 353.3 -28.6 -6.8
5 344.6 26.7 22.6 351.4 -28.5 -21.9
6 343.0 21.6 14.6 349.9 -24.7 -14.1
7 348.0 31.9 15.1 354.9 -32.4 -14.6

Interaction Diagram

Critical Loading: 5 - (G+Q-Nx)


Min Design
N 351.4 - 351.4 kN

ProtaStructure v5.1.252 Page 35


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

M11 -28.5 -5.3 0.0 kN.m


M22 22.6 4.0 39.3 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.170

Beta =0.80

Shear Rebars
Vd(1/2) = 14.2 / 20.4 kN Slender Column... As (Req): %0.74 507.29 mm2
vc'(1/2) = 1.03 / 1.11 N/mm2 Le1/b1 = 9.5 < 15.0 √ As (Sup): %1.17 804.25 mm2
v(1/2) = 0.22 / 0.31 N/mm2 Le2/b2 = 12.6 ≥ 10.0
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y10-175

3C11 (A9-A2) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 73.5 12.9 9.4 80.6 -23.8 -14.0
2 65.7 13.6 2.6 72.8 -25.4 -4.2
3 60.7 8.2 13.5 67.8 -13.4 -19.5
4 63.3 11.1 6.0 69.3 -20.1 -10.0
5 62.9 11.0 10.1 69.0 -20.1 -13.9
6 62.7 10.1 8.0 68.8 -19.7 -11.9
7 63.5 12.0 8.1 69.5 -20.5 -12.0

Interaction Diagram

ProtaStructure v5.1.252 Page 36


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Critical Loading: 1 - (G+Q)


Min Design
N 80.6 - 80.6 kN
M11 -23.8 -1.2 -42.1 kN.m
M22 -14.0 -0.9 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.039

Beta =0.95

Shear Rebars
Vd(1/2) = 10.8 / 12.8 kN Short Column... As (Req): %1.04 714.26 mm2
vc'(1/2) = 0.79 / 0.74 N/mm2 Le1/b1 = 8.9 < 15.0 √ As (Sup): %1.17 804.25 mm2
v(1/2) = 0.16 / 0.20 N/mm2 Le2/b2 = 7.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y10-175

1C12 (A9-A1) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 366.3 19.4 12.7 374.3 -9.4 -7.4
2 376.5 19.4 13.8 384.5 -9.3 -7.3
3 222.8 12.4 6.5 230.8 -6.0 -4.6
4 301.3 17.5 1.3 308.2 -9.2 4.7
5 316.7 15.4 20.1 323.6 -6.7 -17.2

ProtaStructure v5.1.252 Page 37


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

6 301.5 7.5 10.3 308.4 3.2 -5.8


7 316.5 25.3 11.1 323.4 -19.0 -6.7

Interaction Diagram

Critical Loading: 5 - (G+Q-Nx)


Min Design
N 323.6 - 323.6 kN
M11 15.4 4.9 0.0 kN.m
M22 20.1 3.7 43.5 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.156

Beta =0.82

Shear Rebars
Vd(1/2) = 10.8 / 1.3 kN Slender Column... As (Req): %1.01 693.89 mm2
vc'(1/2) = 1.00 / 0.77 N/mm2 Le1/b1 = 16.0 ≥ 10.0 As (Sup): %1.17 804.25 mm2
v(1/2) = 0.16 / 0.02 N/mm2 Le2/b2 = 12.8 ≥ 10.0
MAdd(1)/2) = 7.9 / 9.5 kN.m 4Y16
Links = Y10-175

2C12 (A9-A1) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

Combinations

No NTop M1 Top M2 Top NBot M1 Bot M2 Bot

ProtaStructure v5.1.252 Page 38


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)


1 191.7 25.1 15.8 199.7 -26.8 -17.7
2 196.2 25.0 16.5 204.2 -26.7 -18.6
3 117.8 15.8 8.4 125.8 -16.9 -9.5
4 158.9 21.7 7.3 165.8 -23.0 -9.8
5 164.7 20.7 19.1 171.6 -22.2 -19.9
6 159.3 16.1 13.0 166.2 -18.8 -14.7
7 164.3 26.3 13.5 171.2 -26.5 -15.0

Interaction Diagram

Critical Loading: 5 - (G+Q-Nx)


Min Design
N 171.6 - 171.6 kN
M11 -22.2 -2.6 0.0 kN.m
M22 -19.9 -2.0 -36.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.083

Beta =0.90

Shear Rebars
Vd(1/2) = 11.3 / 15.3 kN Slender Column... As (Req): %1.03 713.20 mm2
vc'(1/2) = 0.89 / 0.87 N/mm2 Le1/b1 = 9.8 < 15.0 √ As (Sup): %1.17 804.25 mm2
v(1/2) = 0.17 / 0.23 N/mm2 Le2/b2 = 12.6 ≥ 10.0
MAdd(1)/2) = 0.0 / 4.5 kN.m 4Y16
Links = Y10-175

3C12 (A9-A1) (230/300)


Materials: C25/30 / Grade 460 (Type 2) (Links: Grade 460 (Type 2))

Section

ProtaStructure v5.1.252 Page 39


TNAM1Q06VCDCW6ZI (Fenerbahce_Do Not Use COMMERCIAL)
Column Reinforcement Design Calc. By:
Rev: 1 Checked By:

Combinations

NTop M1 Top M2 Top NBot M1 Bot M2 Bot


No
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
1 42.5 13.2 13.2 49.6 -20.0 -13.5
2 42.6 13.2 12.7 49.7 -19.9 -14.0
3 30.1 9.2 9.3 37.2 -12.9 -7.6
4 35.9 11.3 10.0 42.0 -16.9 -10.4
5 36.9 11.2 12.5 43.0 -16.9 -12.2
6 36.1 10.5 11.2 42.2 -16.6 -11.3
7 36.8 12.1 11.2 42.8 -17.2 -11.3

Interaction Diagram

Critical Loading: 2 - ((G+Q)p1)


Min Design
N 49.7 - 49.7 kN
M11 -19.9 -0.7 -38.6 kN.m
M22 -14.0 -0.6 0.0 kN.m
NMax 1105.5

Concrete Cover = 25.0 mm

(BS8110 - Cl. [Link])

N/bhFcu =0.024

Beta =0.97

Shear Rebars
Vd(1/2) = 8.7 / 10.9 kN Short Column... As (Req): %1.02 706.12 mm2
vc'(1/2) = 0.77 / 0.72 N/mm2 Le1/b1 = 9.3 < 15.0 √ As (Sup): %1.17 804.25 mm2
v(1/2) = 0.13 / 0.17 N/mm2 Le2/b2 = 7.6 < 15.0 √
MAdd(1)/2) = 0.0 / 0.0 kN.m 4Y16
Links = Y10-175