You are on page 1of 1

DEAR INFRA

(CIVIL CONTRACTOR ) Specilised in bridges and buildings

Building no - 857 ,office no B-4 Shalimar garden Sahibabad , Ghaziabad 201005


Contact Details , 9811305087, 8750020500,9990719973
We assure you the best service all the times

S.No. Description Unit Rate


Construction of Box Culvert & Pipe Culvert
Labour Charges for (Including Shuttering Material with fixing) for Laying of Plain Cement Concrete
(PCC) for all type of Structure except Major Bridge Including Dressing of bed & Sides as necessary by all
means with all leads and lifts complete as per drawings and technical specification under the supervision
of the company engineers.
Concrete shall be provided by COMPANY at site by Transit Mixer/Fiory, Apart from this all Labour,
1 CUM 485
tools/tackles & all machineries for vibrating, finishing, curing by water (water shall be supplied by
Company) transportation for shifting of shuttering & staging
materials at site complete arranged by sub-contractor./ arrange by company ,

Labour Charges for (Including Shuttering Material with fixing) for Laying of Concrete for head wall of
Hume pipe culvert & RCC drains by all means with all leads and lifts complete as per drawings and
technical specification under the supervision of the company engineers. Concrete shall be provided by
2 COMPANY at site by Transit Mixer/Fiory, Apart from this all Labour, tools/tackles & all machineries for CUM 1700
vibrating, finishing, curing by water (water shall be supplied by Company) transportation for
shifting of shuttering & staging materials at site complete arranged by sub-contractor.

Labour Charges for (Including Shuttering Material with fixing) for Laying of RCC in foundation Rafts of
Box Culvert by all means with all leads and lifts complete as per drawings and technical specification
under the supervision of the company engineers. Concrete shall be provided by COMPANY at site by
3 Transit Mixer/Fiory, Apart from this all Labour, tools/tackles & all machineries for vibrating, finishing, CUM 1430
curing by water (water shall be supplied by Company) transportation for shifting of shuttering & staging
materials at site complete arranged by sub-contractor.

Labour Charges for (Including Shuttering Material with fixing) for Laying of RCC in Wall (Substructure)
of Box Culvert by all means with all leads and lifts complete as per drawings and technical specification
under the supervision of the company engineers. Concrete shall be provided by COMPANY at site by
4 Transit Mixer/Fiory, Apart from this all Labour, tools/tackles & all machineries for vibrating, finishing, CUM 1610
curing by water (water shall be supplied by Company) transportation for shifting of shuttering & staging
materials at site complete arranged by sub-contractor.

Labour Charges for (Including Shuttering Material with fixing) for Laying of RCC in Slab
(Superstructure) of Box Culvert by all means with all leads and lifts complete as per drawings and
technical specification under the supervision of the company engineers.
5 Concrete shall be provided by COMPANY at site by Transit Mixer/Fiory, Apart from this all Labour, CUM 2600
tools/tackles & all machineries for vibrating, finishing, curing by water (water shall be supplied by
Company) transportation for shifting of shuttering & staging
materials at site complete arranged by sub-contractor.

Labour Charges for for Steel Cutting, Bending, & Placing as per drawing for TMT reinforcement bars for
all component of all type of structures complete including Placing in positon with chairs etc lapping and
welding wherever required & binding with binding wires (binding wires shall be in sub-contactor's scope)
6 MT 6020
as per drg. and MORT &H specifications sections 1600. The TMT steel shall be provided by COMANY at
work
site.
7 Labour Charges for fixing of bitument sheet 10/12 mm thick in required position all lift Sq.Mtr. 80
etc complete, Bitumen sheet provided by company (For expansion joint).
Labour charges for laying and jointing of hume pipes of all diameter in position required alignment
complete level and as per Specifications and Drawing (RCC hume pipe shall be provided by company).
8 RM 260

Labour Charges for fixing of weep hole (PVC pipe) in cc wall as per required drawing & specification
9 complete (PVC pipes provided shall be provided by company) Nos. 17

We are looking forward to work with your esteemed organisation

DEAR INFRA.

You might also like