You are on page 1of 4

NAME: ALHASSAN IBRAHIM

INDEX NUMBER: 5201040814


COURSE: PROJECT MANAGEMENT IN I.T
COURSE CODE: ITC 354
LECTURER: MR. SAMUEL A. GYIMAH

ASSIGNMENT 3

ACTIVITY LIST FOR WEB VOTING MANAGEMENT SYSTEM


NO. ACTIVITY NAME ACTIVITY DESCRIPTION

gather requirements for the website from


1. Requirements gathering stakeholders, including existing electoral
officials and voters.
design the user interface for the website,
2. User interface design
including layout, navigation, and features.
design the database structure for the
3. Database design voting, candidates and electorates
registration, including pictures.
develop the website using appropriate
4. Development
programming languages and tools.
create content for the website, including
descriptions of voting processes,
5. Content creation
instructions for using the voting system,
and news and events.
integrate the website with other systems
6. Integration used by the library, such as the circulation
system or the cataloging system.
test the website to ensure it meets
7. Testing functional and performance requirements,
including usability testing.
ensure the website is secure from threats
8. Security
such as hacking or data breaches.
deploy the website to a production
9. Deployment environment, making it available for use by
all voters at remote.
provide ongoing maintenance and support
10. Maintenance and support for the website, including bug fixes,
upgrades, and user support.
ensure the website is accessible to all
11. Accessibility
users, including those with disabilities.
integrate analytics tools to measure
website performance and usage, and use
12. Analytics
data to improve the website and the
electoral services.
optimize the website for search engines,
13. Search engine optimization
making it easier for users to find it.
integrate the website with social media
14. Social media integration
channels, allowing users to share content
and interact with the application.
ensure the website is optimized for mobile
15. Mobile responsiveness devices, allowing users to access electoral
services on the go.

NETWORK DIAGRAM FOR VOTING MANAGEMENT SYSTEM

Explanation:

Task A: Gathering requirements is the first step in any software development project. It involves
understanding the needs of the client and defining the project scope.

Task B: Designing the user interface is an important step in creating a website. It involves
creating wireframes and mockups of the website's layout and functionality.

Task C: Developing the database involves creating the data model for the website's backend.
This includes defining the tables, relationships, and constraints of the database.

Task D and Task E: Developing the backend involves writing code for the server-side of the
website. Task D focuses on creating the core logic for the backend, while Task E focuses on
integrating the database into the backend.
Task F and Task G: Developing the frontend involves writing code for the client-side of the
website. Task F focuses on creating the core logic for the frontend, while Task G focuses on
integrating the UI design into the frontend.

Task H: Integrating the frontend and backend involves connecting the client-side and server-
side of the website. This includes defining the API endpoints and writing code to connect the
two.

Task J: Testing and debugging the website is an important step in ensuring that the website
functions as expected. This involves identifying and fixing any bugs or issues that arise during
the development process.

Task L: Deploying the website involves making the website available to users. This includes
configuring the server and uploading the website files to a hosting provider.

Task N: Maintenance involves maintaining the website after it has been deployed. This includes
fixing any issues that arise and making updates to the website's functionality as needed.

You might also like