You are on page 1of 3

Annexure-I

Micro Project Proposal (MGT-22509)


Department:-INFORMATION TECHONOLOGY

1.0 Aims/Benefits of the Micro-project :

Aims:- create Tic Tac Toe Gaming Application.

Benefits: -

2. Develops logical thinking.


2. Develops logical thinking.
2. Develops logical thinking.
2. Develops logical thinking.
2. Develops logical thinking.
2. Develops logical thinking.
2. Develops logical thinking.
2. Develops logical thinking.
2. Develops logical thinking.
2. Develops logical thinking.
2. Develops logical thinking.
2. Develops logical thinking.
2. Develops logical thinking.
2. Develops logical thinking.
1. Teaches strategy skills.
1. Teaches strategy skills.
1. Teaches strategy skills.
 Teaches strategy skills .
 Develos logicals thinking.
  Spurs on the development of fine motor skill and coordination.
 Develop problem –solving solving skill.

2.0 Course Outcomes Addressed:

 CI602.1 Interpret features of android operating system.


 CI602.2 Use environment for android and android development tools.
 CI602.3 Implement rich user interfaces and android application by using layouts,
controls and user interface components.
 CI602.4 Execute android applications using database
3.0 Proposed Methodology (Procedure in brief that will be followed to do the micro-
project in about 100 to 200 words).

1. We have decided to do Micro-project on . Tic Tac Toe Gaming Application


2. Then we collected the data related to Tic Tac Toe. Gaming Application
3. We searched for information related to Tic Tac Toe Gaming Application and extracted
relevant information.
4. Finally, after designing the project we started creating the report.

4.0 Action Plan (Sequence and time required for major activity)

Sr. Details of Activity Planned Planned Name of response


No. start Date finish date team Members
01 Group Formation and selection of 06/02/2023 11/02/2023 All Members
project title
02 Information search using Internet 13/02/2023 11/02/2023 All Members
03 Prepare Micro project Proposal 13/03/2023 01/04/2023 All Members
(Annexure-I)
04 Micro project checking 03/04/2023 22/04/23 All Members
06 Report Submissions 24/04/2023 06/05/2023 All Members

5.0 Resources required (major resources such raw material some machining facility,
Software etc.):
Sr. Instrument/Object Specifications Quantity Remark
No
01 Computer system Computer RAM 1. Whichever is available
minimum 2GB Band
onward
02 Software Android Studio 1. Whichever is available.

6.0 Name of Team members with Roll No’s:


Roll. No. Name of Team Members Sign
48 Kolekar Eknath Ganpat
23 Sanap Vishal Ashok
46 Avhad Om Bhahusaheb
68 Naik Balkrushna Anil
52 Dighe Avishkar rajendra

Prof. Wawale.S.N
(Signature of Teachers)

You might also like