Term – 2
55% from total price or EUR 60,500.00
against the submission of the material balances for
the revamp situation, and the submission of the
equipment list with main dimensions and process
data
Term – 3
40% from total price or EUR 44,000.00
against the submission of the project schedule and
the submission of the executive summary and the
installed cost estimate
The Undersigned below :
Propan Weber S : in his capacity of Vice President of Corporate Development Departement,
hereinafter refered as “Representative Of First Party”, therefor legally acting on
behalf of Director of Finance and General Affair PT Pupuk Kalimantan Timur
(“First Party”)
Nitin Joshi : in his capacity of Licensing Manager, therefor legally acting on behalf of
Stamicarbon B.V, hereinafter refered as “Second Party”
Who later on individually be referred to as “Party” as the context requires and collectively as the “Parties”.
Hereby Parties declared that today, Friday 7 th October 2022 has completed the inspection and verification on the work result
from Work Package as abovementioned with the result :
Description Work Status Remarks
Term – 1 100% Stisfactorily Completed -
against the attendance of the kick-off
meeting over Video conference and
submission of the Process Design Basis
finalized during the Kick-off meeting
HEADQUARTER & PRODUCTION PLANT : JAKARTA REPRESENTATIVE OFFICE:
Jl. James Simanjuntak No. 1, Bontang 75313 Plaza Pupuk Kaltim
Kalimantan Timur, Indonesia Jl. KebonSirih Raya No. 6ª , Jakarta, Indonesia
Ph. : (62-0548) 41202; 41203 Ph. : (62-021) 3443344
Fax. : (62-0548) 41616, 41626 Fax. : (62-021) 3443444
This Document of Acceptance can be used for “Second Party” to proceed the invoice. Thus, the Minutes of Acceptance of Work
is signed on the date as mentioned above to be used properly.
Propan Weber S
VP Corporate Development
Nitin Joshi
Licensing Manager