No. Uraian Pekerjaan Harga Upah (Rp) Harga Bahan (Rp) TOTAL (Rp)
(1) (2) (3) (4) (5)
A Pembuatan pondasi angkur kabel tower triangle Site Aluh-Aluh 21,616,200.00 29,520,120.00 51,136,320.00
B Pengengencangan kembali kabel tower triangle Site Aluh-Aluh 234,000,000.00 225,000,000.00 459,000,000.00
C Perbaikan pintu pagar BRC Site Sungai Rasau 33,118,500.00 84,057,500.00 117,176,000.00