E-mail id : bro-dirtpeen@nic.in Headquarters
Dte General Border Roads
Seema Sadak Bhawan
Ring Road, Delhi Cantt,
New Delhi - 110010
21810/MoRT&H/IDGBRI/¢ ITP Central 4qan 2021
HQ CE (P) BEACON
Clo 56 APO
HQ CE (P) SAMPARK
Clo 56 APO
Brief Notgon National Highways & other Centrally Sponsored Projects in the Union
Territory of Jammu & Kashmir (As on 13 Jan 2020
4. Acopy of MoRT&H Brief note on subject is forwarded herewith for your
information please.
—
TAL Sriwastaw)
EE (Civ)
Jt Dir TP (Central)
For DGBR
Enels: sheets
HQ DGBR/Die (West) > For info along with copy of Brief note please.Ministry of Road Transport & Highways (MoRT&H)
Brief Note
on
National Highways & Other Centrally Sponsored Projects
in the Union Territory of
Jammu & Kashmir
{As on 13.01.2020)INDEX
S.No. » Content pees
1. | Status of National Highways Length in the UT of J&K 2
2. | Details of NHs Notified in the UT of J&K 3
3. | Expenditure incurred on NHs during Last Six Years (2014-15 to 2019-20) 4
4. Summary of NH Projects Awarded during Last Six Years 4
5. ‘Summary of NH Project Length (km) Constructed during Last Six Years 4
6. NH Projects Completed during Last Six Years 5
7. NH Projects under Implementation 6
8. _ | NH Projects for which Appointed Date is yet to be dectared 8
9 aetaetd for a and Construction of NH works during 2019-20 9
10 | Detaits of CRF/ EI & ISC works during Last Six Years 10
tt a ea ‘of NH Projects Awaiting Foundation Stone/ Bhoomi Poojan / 10
Inauguration
12 | APPENDICE(S) :
13° | Appendix-i. Road Map of the UT of J&K "1 Status of National Highways length inthe UT of Jammu & Kash;
Total no. of NHS passing
through the UT
Total Length of NHs in the UT
1658.5 km
TNH, 44,144, 144a, og ‘244A, 444, 601, 707 & 7O1A)
Density of NHs in the UT in
Population {karekh
Population}
13.90 against 10.90 for all India
Density of NHS in the UT in
Area (kmithousand sq, km)
40.40 against 39.99 for all India
Total Length of NHs with UT
Pwo. 283.5 km
Total Length of NHs with NHAT 447.69 km
Total Length of NHs with 3520km
NHIDCL
{including 43 km of Baramulia.Gulmarg NH-701-A is under entrustment)
Total Length of NHs with BRO
533.0 km.
Total Length of NHs yet fo be 0
entrusted Bd
Development of Ns during | MoRT&H AL
last six years (UT Pwo} NHAT NHIDCL BRO TOT!
‘Awerded Length (km) 178.37 447.69 105- NA 729.06
Completed Length (km) 815 256.52 0 NA 338.02
Under Implementation Length
un) 84.72 149.072 | 105 0 338,792
Lanewise Distribution of | MoRT&H 1
NHs {UT Pwo) NHAI NHIDCL BRO TOTAL
Sic Lane (km) i 7 : :
Four Lane (km) 32.45 4368 0 7 476.25
Two Lane wih Paved
Shoulder Two Lane (km) Bee ae uid ia 768.61
Less than 2 Lane (km) 225.35 - 43 160 48.36
Total 283.5 504.69, 352 533.0 1673.212
Details of NHs Notified in the in the UT of Jammu & Kashmir;
S| New | Old] Route Tengt Date of | Agency
No, | NHNo. | NH (km) pane Wah Notification
No. aya [eal
TR, | Un, Baramula, Sanager
7 1 4D | Kargil and Leh too | 34 | 158 | 7 | Pio a
Panchtami (NH-1)-
Chandanwar-Pehalgam- 0 | 14.85 PWD (NOC
dae BatahutMertand Khanabel ne 28.00.2012 | pated)
(NH-44) 90
aa Baramula (NA-1)Rafabad- vacez0 | BRO
Kupware-Tangdhar 16} 16 |. |
a | Toi Baramulla (NH-1)-Guimarg | 43 | 43 7 [7] 14082012 | NHIDOL
8K Border-Kathua-Samba-
Jammu-Udhampur-Batot- NHAI
4418 | Ramban-Khenabal- Pre-t260
: Awantipur Pampore-
Srinagar 447.69 10.89 | 4368
4d NH 44 Bypass 178 17.8 = PWD
Domel (Naa) Kata, PWD
Raesi,Pauni-Bamla (NH: “(oad from km
rn) 87.00 0 km
6 | 4) 1c 04.03.2014 | 90.0isyetto
be handed
over from
ee EEE 90. 90 : BRO)
7 aes anim Akioor 300 [=| 30 | 008201 | NHIDCL
‘Akinaoor Naoshera-Rajoure
Punch 04.03.2014 | BRO
8 ar 2m
‘Chenani (NH-44}-Sudh
Mahadev- Goha-Khelani-
24 | 48 | eonmar Satter Pose 25.02.1977 | NHIDCL
L Koanabel (NH-44) 21a a
‘Jammu (NH-44)- Nagrota
9 | 2AM Spt ica a - 04.03.2014 | NHAI
Srinegar-Badgam-Pubwama-
Shupiyan-Kulgam-
Quazigund, [Lengths as per
exisiting alignment.
10 | 444 fonabbrintl 8672 | 80 | 2572 04.03.2014 | PWO
approved alignment the zero
point has been shifted and
bypasses have beenproposed. Design length
proposed shall be 77.347
kr
TOTAL 1668.21 | 263 | 913.6 | 491.6
3. Expenditure incurred on NHs during Last Six Years
(A) Original NH Works
(Amount in Rs Crore)
Agency 2015-16 | 201617 | 2017-18 201819 | 2019-20 | UptoDec | Total
2020
UT Pwo 21.34 | 22.40 35.44 4444 16.40 44.97 184.69
“ns Wanioanea abo
(B) Maintenance & Repair of NH Works
(Amount in Rs Crore}
Agency 2016-16 | 2016-17 | 2017-18 2018-19 | 201920 | UptoDec | Total.
2020
UT Pwo 712 6.16 2.98 9.06 0.34 00 25.64
(C) Allocation under FOR/OR
(Amount in Rs Crore)
2015-46 | 201647 | 201748 | 2018-49 | 2019-20 | UptoDec | Total
____|_z00
FOR 451 1.50 0.66 0 05 0 4qT
oR 0 0 435 288 08 4.89 1282
4. Summary of NH Projects awarded during last six years
Agency No. Length (em) Cost RS Ci]
VoRTBH (through UT PWD} 4 17637 2A A
5._Summary of NH Project Length (km) constructed during last six years
Agency 2015-16 2016-17 2017-18 2018-19 2019-20 Upto Dec Total
2020
MoRTEH (Chrough UT PAD) 13 8 135 1345 | 1660 | 7185 | 14340
6. NH Projects Completed during last six years
(A) Summary of Major NH Projects completed
Agency No. Length (km) Cost (Rs Cr)
WoRTEH (hough UT PHD) 3 % B68
{@) Details of NH Projects Completed by MoRTBH (Chrough UT PWD)
‘S.No, | NHNo, | Name of Project Length (km) | Sanctioned Cost | Date ofRe Ci) Completion
7 a ImplUp-gradeton of Domail Bhenibla road 17 2002 15.08.2018
between km 24.00 fo km 41.00
2 Ade impiUp-gradation of Domail Bhembla road | 26 18.74 21.08.2019
between km 41,00 to km 67,
3 Ine 0 3.64 10.05.2018
Principle | Consultancy Services for FS and DPR for
nH widening fo 2L+PS of Dinga-Amb-Chalan-
Udhampur road , Lakhanpur — Mahanpur-
i Basohli oad, (inPrinciple NHs)
7. NH Projects under Implementation
A (i) Summary of NH Projects under implementation by MoRT&H through UT PWD
S.No. | Scheme | No. of Projects Length (km} Cost (Rs Cr)
i NAO) [6 107, 234.8
Al) Details of NH{(0) Projects under implementation by MoRTSH through UT PWD.
S.No. [NHWo. | Name of Project Length (km) | Sanction | Physical
: Cost (Rs | Progress (%)
cA ‘status
Projects Sanctioned on tem-Rate
7 aa ‘Glo Mejor Brazelo Bride (2 lane) at km, 861405 Mie |Z
{Srinager-shupiyan-Qazigund)
we lo Major Gucdura Br 2 lane) at km. 35.850 0n 74.80 a
NH 444 (Srinagar-shupiyan-Cazigund)
a ah Strengthening from km 0.00 to 32.00 on NI-444 | 31 36.07 80
(Srinagar-Shupiyan-Quazigund section) under
PMIDP -2018 on EPC made
oa Strengthening For km 32.00 to 63.00 on NESE] 24 BD 9
(Srinagar-Shupiyan-Quazigund section) under
PMDP -2015 on EPC mode
a 4G Strengthening irom kr 53.0 to 85.720 on NH-Aad | 32.72 rT rn )
(Srinagar-Shupiyan-Quazigund section) under
PMP -2015 on EPC mode
e ‘Sirengthening of road from km 0.00 To km 24.00 | 24 35.18 Appointed dated
(Domail to Bhamla} and providing retaining wall, given on
Bal, Signages and crash bariers in the 11.01.2021
selected reaches of NH-1C (New NH-144) in theUtof Jammu and Kashmir on EPC mode.
Works sanctioned on EPC mode but yet to be
awarded
{under PMDP approved for Rs43,346.69 cr for
16 nos. of Road Projects in J&K announced by
Hon*ble PM on 07.11.2015)
7 [Bor NOe B50 8817 Work sanctioned
yettobe | Strengtharinghvidening of NH-S01 Khanabel- but dua to
received) | Phalgam Road from Km. 0.000 to Km, 49.500 in ongoing CRF
the UT of Jammu & Kashmir on EPC mode. works, tenders
cancelled
7 7 NH-44 Strengthening of Service Road on both Le eae
sides of NH- 44 fom km. 0,00 to 0.600 and from ea
from km, 4.50 to 11,50 in the UT of Jammu ft | 15.2 9.03 ey
Kestiren EPCabae awarded awaiting
approval of UT-
L Govt.
oa NH-A4 Consinicton of Serve Road along NA-44 Tenders invited
~ both sides (New Construction) 1.9 to 45 km and | 51 9g 334
14.5 fo 17.8 km and renewal of main carriageway | °
from 45 to 11.5 kms
0 ae Land Acquisition for construction of Bypasses TXestimate
Putwama and Kuigam sanctioned. The
17.2 estimate for the
civil work is yet to
be recelved
8, NH Projects for which Appointed Date is yet to be declared:
A. NH Projects to be implemented by MoRT&H through UT PWD
S.No, | Name of Package Name of [Length | Sanction | Agreeme | Agreem | Scheduled?
Concession | (kin) edCost | ntCost | ent Date | Likely Date of
iret (RsCr) | (Rs Cry Completion
Contractor
Ni
8, TargetiAchiovement for Award and Construction of NH works during 2019-20
‘Agency Stage Target (an) | Achievement
(km)
TWoRTEA (through UT PWD) Award Br 2
Construction 116.7, 71.55
10, Summary of CRFIEI & ISC works sanctioned during last six years:
A. SanctionsScheme | 2014-15 2015-46 201647 2017-18 201819 2019-20
Length | Cost | Lengih | Gost | Length | Cost | Length [Cost | Length Cost Length | Cost
inkm | (Rs | inkm (Rs | inkm | (RsCr) | inkm | (RsCr) | inkm | (Rs | inkm | (Rs
(No) |r) (No) | Cr) | (Noy (No,) (No) cr) | (No) | Cn)
CRF aa | - 785.56 |- 1019.23 | - 1178.26 | (19) | 320.89 | -
EIaIsC | - @ [we my [mT - - - [- -
B. Release
Scheme DAS | 2015-16 | 2016-47 | 201748 | AO1BAD | 2019-20 | 2020-27 | Total
RF Go [aaa [ego fazer [3475 [15286 | Under 1000.56
process
411, Details of NH Projects Awaiting Foundation Stone /Bhoomi Poojaniinauguration
A, Foundation Stone /Bhoomi Poojan
Agency | Nameof | Contract | Total | Total | Current | Parliamentary Remarks
Project | Amount | Capital | length | Status | Constituency
(Rscr) | Cost (Rs | (km)
or)
NL
B, Inauguration
Agency | Name of | Contract | Total | Total | Current | Parliamentary Remarks
Project | Amount | Capital | length | Status | Constituency
(Rscr) | Cost (Rs | (km)
er)
Ni