protection cubicles provided shall already be wired for the possible total
number of feeders.
Thus, later on, the respective prints, modules or parts for extensions can easily
be fitted to the protection system and no cubicle wiring at Site shall be
necessary.
Prior to manufacturing, the Contractor shall indicate the remaining extension
possibilities in the same cubicle(s) and the final quantity of provis ions for future
feeders shall be approved by the Engineer.