REQUEST FOR INSPECTION

SAUDI ELECTRICITY COMPANY


PROJECT TITLE: Installation of Security System at Najran and Sharourah Power plant
CONTRACT.: 4400015463 PROJECT NO :

CONTRACTOR: Giza Arabia

INSPECTION REQUEST NO. GIZ-RFI-10


ITEM FOR INSPECTION: Installation of UVIS at Main Gate of Najran Power Plant

DATE : 19/1/2022 DAY : Thursday TIME : 10:30 HRS


PLACE / LOCATION : Najran Power Plant Main Gate
REFERENCE DRAWING NO. : SEC (SOA) -Najran-GL-C-0001
REFERENCE SPECIFICATION : Schedule B of contract 4000069937
Work is ready for Inspection and Complies with the Scope of Work and Technical Specifications.

Mohammad Amir Sid Ahmed Mohammed Amir 21/1/2022 0550230255


Contractor's QA/QC Engineer's Name Signature Date Telephone Fax

INSPECTION RESULTS
Inspection Date & Time:
APPROVED APPROVED WITH COMMENTS NOT APPROVED

SEC PROJECTS ENGINEER NAME/SIGN SEC-PROJECTS SITE MANAGER SIGN