The document is a request for inspection from Giza Arabia, the contractor, for the installation of a security system at the Najran and Sharourah power plants in Saudi Arabia. Giza Arabia requests inspection of the installation of UVIS at the main gate of the Najran Power Plant on January 19th, 2022 at 10:30 AM. The work is reported to comply with the scope of work and technical specifications referenced in the contract and drawings.
Original Description:
Original Title
Installation of UVIS at Main Gate of Najran Power Plant.pdf
The document is a request for inspection from Giza Arabia, the contractor, for the installation of a security system at the Najran and Sharourah power plants in Saudi Arabia. Giza Arabia requests inspection of the installation of UVIS at the main gate of the Najran Power Plant on January 19th, 2022 at 10:30 AM. The work is reported to comply with the scope of work and technical specifications referenced in the contract and drawings.
The document is a request for inspection from Giza Arabia, the contractor, for the installation of a security system at the Najran and Sharourah power plants in Saudi Arabia. Giza Arabia requests inspection of the installation of UVIS at the main gate of the Najran Power Plant on January 19th, 2022 at 10:30 AM. The work is reported to comply with the scope of work and technical specifications referenced in the contract and drawings.
PROJECT TITLE: Installation of Security System at Najran and Sharourah Power plant CONTRACT.: 4400015463 PROJECT NO :
CONTRACTOR: Giza Arabia
INSPECTION REQUEST NO. GIZ-RFI-10
ITEM FOR INSPECTION: Installation of UVIS at Main Gate of Najran Power Plant
DATE : 19/1/2022 DAY : Thursday TIME : 10:30 HRS
PLACE / LOCATION : Najran Power Plant Main Gate REFERENCE DRAWING NO. : SEC (SOA) -Najran-GL-C-0001 REFERENCE SPECIFICATION : Schedule B of contract 4000069937 Work is ready for Inspection and Complies with the Scope of Work and Technical Specifications.
Mohammad Amir Sid Ahmed Mohammed Amir 21/1/2022 0550230255
Contractor's QA/QC Engineer's Name Signature Date Telephone Fax
INSPECTION RESULTS Inspection Date & Time: APPROVED APPROVED WITH COMMENTS NOT APPROVED
SEC PROJECTS ENGINEER NAME/SIGN SEC-PROJECTS SITE MANAGER SIGN