S.No. Nature of Powers SAG REMARKS
/HOD Officers &
Officers in
Headquarters
1 2 3 4 5 6
8. Tight targets and urgency should not be accepted as a reason for calling single tenders (No.97/CE-I/CT/32 dated 27.08.97).
5. (D)Invitation of single tender in case of CAO/C, CAO/RE: Nil Nil Authority:
works pertaining to doubling, Traffic facility, Up to Rs. 5 Cr. 1. Para-1214-A of Engineering Code
New lines, gauge conversion and railway 2. Railway Board's letter No. 2007/CE-
electrification projects, which are targeted for I/CT/18 dated 07.03.2008
completion in the current financial year. 3. Railway Board's letter No. 2007/CE-
I/CT/18 Pt. XII dated 31.12.2010 (Para-3),
4.
dated 27.06.2011 and 11.10.2012 & Letter
No.2011/CE-I/CT/0/4 dated 14.11.2013
followed by 02.05.2017.
A 23
Divisional
Officers, Extra
DRM/ADRM/
PHOD/CHOD Divisional
S.No. Nature of Powers SAG REMARKS
/HOD Officers &
Officers in
Headquarters
1 2 3 4 5 6
1. Constitution of Tender Committee and
acceptance as per Annexure A.
2. The Tender Committee composition and the
accepting authority should be at least one
step higher than the members nominated in
case of Open Tenders/Limited Tenders
except where G.M. is the accepting
authority.
(F) To dispense with calling of tenders for Up to Rs. 10 Up to Rs. 10 JAG/SG & SS Authority:
works which are urgent in nature and to Lakhs per case for Lakhs per case officers
accept offers received in response to all works for all works (Independent 1. 2007/CE-I/CT/18/Pt. dt 05.03.2009.
quotations. including works including works charge) 2. 2007/CE-I/CT/18 Pt.13 dt.06.09.10.
directly related to directly related to (i) Works 3. 2007CE-I/CT/18/Pt.13 dt.11.09.17
safe running of safe running of directly related
trains with annual trains with annual to safe running
limit of Rs.1.2 Cr. limit of Rs.1.2 of trains:
Cr.
Up to and
including Rs.2
lakhs per case
without finance
concurrence
subject to
annual ceiling
limit of Rs. 10
Lakhs.
(ii) All other
works including
works directly
A 24
Divisional
Officers, Extra
DRM/ADRM/
PHOD/CHOD Divisional
S.No. Nature of Powers SAG REMARKS
/HOD Officers &
Officers in
Headquarters
1 2 3 4 5 6
related to safe
running of
trains:
Up to Rs.5
lakhs per case
with annual
limit of Rs.60
lakhs (including
(i) above).SG
and JAG in
workshop-
same as above