Machine overview:
1. The machine coming with 4 sections: the main machine, delivery table, vacuum pump and its upper frame and control
station (main cabinet).
1 / 24
Layout of machine:
2 / 24
Installation of the Partition Assembler
1. Place the main machine section on the ground with planned position, and remove the bottom steel pallet.
3 / 24
3. Connect the delivery table with the maim machine.
4 / 24
4. Connect the vacuum pump, its pipeline, power cable and upper protection frame.
5 / 24
5. Connect the power cable and pipeline of suction fan.
6 / 24
6. Connect the machine to the main control cabinet.
(3 aviation plugs)
(Servo motor to servo driver, connect the no. 15 communication cable and number 16 power cable plug and PE line. Note:
the servo motor is to driven the main feeding belt table)
7 / 24
7. Transformer to main cabinet power wiring: machine main power: 6.8KW
8 / 24
8. Compressed air supply:
9 / 24
Note:
1. after Power On the machine, please double check the suction fan motor,
vacuum pump motor and upper conveying table for insert sheets are
2. check if the belt conveying tables are running smoothly without belt
10 / 24
Control Panels of the Partition Assembler
1. Main control panel
11 / 24
3 Switch the Suction fan ON/OFF for inserts
5 Switch the upper conveying table ON/OFF for inserts. This table just
gives low speed to moving in the inserts onto the inserting area by
friction.
12 / 24
7 Adjust the height of the upper inserting plate.
13 / 24
2. Touch Screen
2 Backward / Adjust the insert position backward or forward same as conveying direction.
Forward
3 Lane Qty Choose “1” or “2” lanes for production. (2 lanes mean make 2 finished jobs per time.) the counting
will be double when you choose “2” lanes
14 / 24
4 Parameter Please press this button to confirm the setting after any modification
Validation
5 User Login To avoid non-related person to be involved, the screen has User Login
15 / 24
Item Description Function
1 Counting Couting the curretion production quantity
2 Clear Clear the counting to “0”
3 Speed Speed of servo motor rotation
Normally, when you during set up, you can choose 150-200 r/min. As
for regular production speed of your sample: 500r/min.
For hard easy corrugated paperboard, you can increase to 600-800r/min.
Note: the speed can only be changed only when you stop the machine running. Please must
press “Confirm” to change the speed setting.
4 1# Press the buttons to switch ON/OFF of the feeding stations and insert plate. green
2# light color means ON, red light color means OFF.
3#
Inset
5 Start Start the machine running.
You can also use below green button to start machine.
16 / 24
Operation of the Partition Assembler
Step1. Load the insert sheets onto upper conveying table.
Note: if work with wider sheet with only one lane, please put sheets at the center.
Step2. Adjust upper conveying table height according to insert sheet height.
17 / 24
Step3. Adjust insert plate height according to insert sheet height.
18 / 24
Step5. Adjust insert space according to insert sheet thickness. Around 1.5times as real inset sheet
thickness, let one piece go, avoid 2 pcs down.
19 / 24
Step7. Manually rotate the two inserting rollers to move the insert sheet down.
20 / 24
Step9. Loading the feeding sheets into the feeding stations
Close the valves when you didn’t use some stations according to jobs.
21 / 24
Step9. Adjust the feeding channels positions
22 / 24
Find positions of each channel according to the insert sheet position.
23 / 24
Summary for operation set-up
Positions:
1. Put insert sheet firstly, then manually move it down
2. Adjust the feeding channel positions according the insert sheet.
3. Adjust the feeding stations positions according to the feeding channel positions.
Height:
There are 3 motors to control the heights of upper conveying table, inserting plate and feeding stations.
Open upper feeding table belts, the fans and vacuum pump motors, and also the chosen
feeding stations during production.