You are on page 1of 12

ELECTRICAL GENERAL NOTES: LEGENDS & SYMBOLS

TEF

ACCU

ACU

JF

EF

SF

PB

PE

TP

BP

SP

1 RISER DIAGRAM
E-01
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\ELECTRICAL\MARCH 3, 2023

2 CATV SYSTEM ONE-LINE DIAGRAM 3 TELEPHONE SYSTEM ONE-LINE DIAGRAM


E-01 E-01

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date Client: Professional Electrical Engineer: PROJECT: Start Date : NOV. 2022 Scale: NTS

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PEVF Checked By: JAR
3-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Joselito A. Reyes Jr. AR-0020
Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0004628
Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: MANILA 0861884 DATE: 05 JAN 2023 Dwg No.: Rev:

Client Signature
E-101 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to RISER DIAGRAM
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
GENERAL NOTES & LEGENDS
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE

LINE
EF-BP EF-BP

PROPERTY

JF

JF
JF SF

SF

MDP-1

SP-ELEV

SP-1 SP-2

DPE-1DPE-2 FP DPE-3

CPS-2
EF-CP CPS-1
FP-1 JP-1
(Very actual location of fire and jockey
pumps from firepro plan) TP-4
TP-3
TP-2
TP-1

(Very actual location of transfer and CPS

PROPERTY LINE
pumps from plumbing plan)

K
SET BAC

NE
PROPERTY LI
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\ELECTRICAL\MARCH 3, 2023

1 BASEMENT POWER LAY-OUT


E-02

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date Client: Professional Electrical Engineer: PROJECT: Start Date : NOV. 2022 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PEVF Checked By: JAR
3-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Joselito A. Reyes Jr. AR-0020
Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0004628
Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: MANILA 0861884 DATE: 05 JAN 2023 Dwg No.: Rev:

Client Signature
E-102 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to BASEMENT
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
POWER LAY-OUT
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE

LINE
PROPERTY

WP
WP

WP
ACCU

MTTC

TEL-103 TEL-105
MDP-2
FCU
TEL-104

TEL-106

TEL-102

WP
TEL-101
TEL-107

DPE MDP
DPE-4 WP

WP
WP

WP

MDP
DPE/
ATS

WP MCB

WP

PROPERTY LINE
WP

K
SET BAC WP

ROAD LINE
NE
WP PROPERTY LI
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\ELECTRICAL\MARCH 3, 2023

1 GROUND FLOOR POWER LAY-OUT


E-03

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date Client: Professional Electrical Engineer: PROJECT: Start Date : NOV. 2022 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023 Drawn By : PEVF Checked By: JAR


3-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Joselito A. Reyes Jr. AR-0020
Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0004628
Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: MANILA 0861884 DATE: 05 JAN 2023 Dwg No.: Rev:

Client Signature
E-103 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to GROUND FLOOR
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
POWER LAY-OUT
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE

LINE
PROPERTY
ACCU ACCU ACCU ACCU ACCU ACCU ACCU ACCU

ACU ACU ACU ACU

F
DPE-7 DPE-8

MDP-3

ACU ACU ACU ACU

ACU ACU
DPE-5

DPE-6

ACU
ACU
ACU
ACU

ACCU ACCU

ACCU
ACCU

ACCU ACCU

PROPERTY LINE
K
SET BAC

NE
PROPERTY LI
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\ELECTRICAL\MARCH 3, 2023

1 SECOND FLOOR POWER LAY-OUT


E-04

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date Client: Professional Electrical Engineer: PROJECT: Start Date : NOV. 2022 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PEVF Checked By: JAR
3-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Joselito A. Reyes Jr. AR-0020
Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0004628
Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: MANILA 0861884 DATE: 05 JAN 2023 Dwg No.: Rev:

Client Signature
E-104 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to SECOND FLOOR
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
POWER LAY-OUT
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE

NE LI
PROPERTY
ACCU ACCU ACCU ACCU ACCU ACCU ACCU ACCU ACCU ACCU ACCU ACCU ACCU

ACCU WP ACU ACU ACU ACU ACU ACU ACU ACU ACU ACU ACU ACU ACU
CATB CATV

MDP-4.5 TEL-312
TV-305
TEL-310 TEL-311 TEL-313 TEL-316
TEL-317 TEL-320
ACU
TEL-314 TEL-315 TEL-318 TEL-319
TEL-308 TEL-309
TEL-305 TV-308 TV-309 TV-310 TV-311 TV-312 TV-313 TV-314 TV-315 TV-316 TV-317 TV-318 TV-319 TV-320

WP
WP

WP
TEL-304

WP

WP

WP

WP

WP

WP

WP

WP

WP

WP

WP

WP

WP
ACU
MDP-4.8 MDP-4.9 MDP-4.10 MDP-4.11 MDP-4.12 MDP-4.13 MDP-4.14 MDP-4.15 MDP-4.16 MDP-4.17 MDP-4.18 MDP-4.19 MDP-4.20
ACCU

TV-304
WP WP WP
MDP-4.4

MDP-4.3
ACCU TV-303
MDP-4.6 MDP-4.7 MDP-4.24 MDP-4.23 MDP-4.21

WP

WP

WP

PW

WP

PW

PW
ACU
WP
TEL-303 WP DPE-9 MDP-4
WP DPE-10
CL-1 PE-2
WP TV-323 TV-322 TV-321
TV-306 TV-307
TEL-302 TEL-323 TEL-322

ACU
TEL-321

ACCU TV-302
MDP-4.2

WP
ACU
ACU ACU
TEL-306 TEL-307
MDP-4.1 ACU ACU ACCU
TV-301 ACCU ACCU
ACCU ACCU
ACCU
ACU

TEL-301
WP

WP
WP WP F

WP

PROPERTY LINE
K
SET BAC

NE
PROPERTY LI
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\ELECTRICAL\MARCH 3, 2023

1 THIRD FLOOR POWER LAY-OUT


E-05

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date Client: Professional Electrical Engineer: PROJECT: Start Date : NOV. 2022 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PEVF Checked By: JAR
3-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Joselito A. Reyes Jr. AR-0020
Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0004628
Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: MANILA 0861884 DATE: 05 JAN 2023 Dwg No.: Rev:

Client Signature
E-105 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to THIRD FLOOR
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
POWER LAY-OUT
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE

E LIN
PROPERTY

BP-1 BP-2

(Verify actual location of panel


DPE-10.1 board and control)

BP-3 BP-4

PROPERTY LINE
K
SET BAC

NE
PROPERTY LI
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\ELECTRICAL\MARCH 3, 2023

1 ROOF POWER LAY-OUT


E-06

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date Client: Professional Electrical Engineer: PROJECT: Start Date : NOV. 2022 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PEVF Checked By: JAR
3-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Joselito A. Reyes Jr. AR-0020
Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0004628
Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: MANILA 0861884 DATE: 05 JAN 2023 Dwg No.: Rev:

Client Signature
E-106 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to ROOF
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
POWER LAY-OUT
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE

LINE
PROPERTY

MDP-1

DPE-1DPE-2 FP DPE-3

PROPERTY LINE
K
SET BAC

NE
PROPERTY LI
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\ELECTRICAL\MARCH 3, 2023

1 BASEMENT LIGHTING LAY-OUT


E-07

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date Client: Professional Electrical Engineer: PROJECT: Start Date : NOV. 2022 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PEVF Checked By: JAR
3-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Joselito A. Reyes Jr. AR-0020
Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0004628
Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: MANILA 0861884 DATE: 05 JAN 2023 Dwg No.: Rev:

Client Signature
E-107 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to BASEMENT
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
LIGHTING LAY-OUT
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE

LINE
PROPERTY

TEF TEF TEF

MDP-2

TEF
TEF

TEF

DPE MDP
DPE-4

PROPERTY LINE
K
SET BAC

ROAD LINE
NE
PROPERTY LI
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\ELECTRICAL\MARCH 3, 2023

1 GROUND FLOOR LIGHTING LAY-OUT


E-08

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date Client: Professional Electrical Engineer: PROJECT: Start Date : NOV. 2022 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PEVF Checked By: JAR
3-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Joselito A. Reyes Jr. AR-0020
Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0004628
Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: MANILA 0861884 DATE: 05 JAN 2023 Dwg No.: Rev:

Client Signature
E-108 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to GROUND FLOOR
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
LIGHTING LAY-OUT
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE

NE LI
PROPERTY
TEF

TEF

DPE-8
DPE-7
MDP-3

TEF TEF
TEF

DPE-5

DPE-6

PROPERTY LINE
K
SET BAC

NE
PROPERTY LI
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\ELECTRICAL\MARCH 3, 2023

1 SECOND FLOOR LIGHTING LAY-OUT


E-9

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date Client: Professional Electrical Engineer: PROJECT: Start Date : NOV. 2022 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023 Drawn By : PEVF Checked By: JAR


3-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Joselito A. Reyes Jr. AR-0020
Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0004628
Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: MANILA 0861884 DATE: 05 JAN 2023 Dwg No.: Rev:

Client Signature
E-109 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to SECOND FLOOR
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
LIGHTING LAY-OUT
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE

LINE
PROPERTY
MDP-4.5

TEF

TEF

MDP-4.8 TEF TEF


MDP-4.9 MDP-4.10 TEF TEF
MDP-4.11 MDP-4.12 TEF TEF
MDP-4.13 MDP-4.14 TEF TEF
MDP-4.15 MDP-4.16 TEF TEF
MDP-4.17 MDP-4.18 TEF TEF
MDP-4.19 MDP-4.20 TEF

MDP-4.4

MDP-4.3

MDP-4.6 TEF TEF MDP-4.7 MDP-4.24 TEF TEF MDP-4.23 MDP-4.21 TEF

TEF
DPE-9 MDP-4
DPE-10

TEF

MDP-4.2

MDP-4.1

TEF
TEF
TEF

PROPERTY LINE
K
SET BAC

NE
PROPERTY LI
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\ELECTRICAL\MARCH 3, 2023

1 THIRD FLOOR LIGHTING LAY-OUT


E-10

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date Client: Professional Electrical Engineer: PROJECT: Start Date : NOV. 2022 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PEVF Checked By: JAR
3-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Joselito A. Reyes Jr. AR-0020
Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0004628
Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: MANILA 0861884 DATE: 05 JAN 2023 Dwg No.: Rev:

Client Signature
E-110 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to THIRD FLOOR
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
LIGHTING LAY-OUT
CONTRACT DOCS.
The Architect retains copyright on this drawing.
SCHEDULE OF LOADS
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\ELECTRICAL\MARCH 3, 2023

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date Client: Professional Electrical Engineer: PROJECT: Start Date : NOV. 2022 Scale: NOT TO SCALE

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PEVF Checked By: JAR
3-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Joselito A. Reyes Jr. AR-0020
Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0004628
Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: MANILA 0861884 DATE: 05 JAN 2023 Dwg No.: Rev:

Client Signature
E-111 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
SCHEDULE OF LOADS
CONTRACT DOCS.
The Architect retains copyright on this drawing.
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\ELECTRICAL\MARCH 3, 2023

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date Client: Professional Electrical Engineer: PROJECT: Start Date : NOV. 2022 Scale: NOT TO SCALE

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PEVF Checked By: JAR
3-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Joselito A. Reyes Jr. AR-0020
Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0004628
Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: MANILA 0861884 DATE: 05 JAN 2023 Dwg No.: Rev:

Client Signature
E-112 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
SCHEDULE OF LOADS
CONTRACT DOCS.
The Architect retains copyright on this drawing.

You might also like