You are on page 1of 78

B-29 Crew Positions

Source
Ref:
Tail Gunner
Compartment

Source
Ref:
Source
Ref:
B-29 Pressurized Compartments

34 inch
Diameter

Matted
Insulation
Tail Gunner
35 foot Long Crew
Communications Tunnel
Pressurized
Compartment
Pressurized fuselage sections

Pressure Ducts

35 foot Crew Tunnel

Page 12
Source
Ref:
Pressure
Zone

500 rounds

Source
Ref:
Ballistic
Glass

Spent Cartridge and


Link Dump Chute
Tail Position Light
B-29
Ballistic
Glass
Escape Hatch

t = .0 Ballistic
64
Glass

t = .072
20mm
cannon
Source
Ref:
Source
Crew entry Ref:
Door
Source
Crew entry Ref:
Door
Tail
Gunner’s
pressure
bulkhead
Door

Source
Ref:
Tail Gunner’s
pressure
bulkhead Door
Source
Ref:
Source
Ref:
Source
Ref:
1144 Armored
Bulkhead

Source
Ref:
Crawl through
Source
Ref:
Seat Belt
Coms
Jackbox
Walk Around
Bottle
Oxygen
regulator
Heated Clothes
Rheostat
Ash Tray
Non-Pressurized
AMMO AMMO
Box Box
AM
Ch M
e ut O
ut e
C h
MO
AM
Tail
Skid
Hump
ng
ati
He ct
Du
t
uc D
rn
tu
Re
Lower Aft
Turret
B-29 Tail Gunners Control Box
B-29 Tail Gunners Control Box

• Warm up the computers


• Gun Charger air compressors
• Firing circuits for guns
• Gun safety
• Main power Switch switch

• Computer and
• Turret Azimuth power Gyroscopes
• Turret Camera
power
power
• Turret Elevation power
Walk Around
Bottle
Ash Tray
Coms
Jackbox
Oxygen
regulator
Seat Belt
Heated Clothes
Rheostat
Crash or ditching Tail Gunner position
Source
Ref:
Source
Ref:
Source
Ref:
Source
Ref:
Combat
effectiveness
Ref: April, 1945 Declassified Report
65 pages
65 pages
Source Ref:
65 pages
Source Ref: 65
pages
Source Ref: 65
pages
Source Ref: 65
pages
Source Ref: 65
pages
Source Ref: 65 pages
Source Ref: 65 pages

You might also like